HPD housing violations

3 HPD violations, newest first.

  • BHazardous

    Abate the nuisance consisting of vermin - mice and roaches, 1st sty., apartment - kitchen.

    Feb 11, 2004

    Open — Nov sent out
  • ANon-hazardous

    Properly repair with similar material the broken or defective - plater-board, ceiling cellar throughout.

    Feb 11, 2004

    Open — Nov sent out
  • ANon-hazardous

    Replace with new the broken or defective - glass, cellar windows north and northwest.

    Feb 11, 2004

    Open — Nov sent out

DOB building violations

9 DOB violations, newest first.

  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)

    Jun 23, 2024

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)

    Apr 22, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2021

    Aug 21, 2022

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2019

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 16, 2019

    Dob violation - dismissed
  • Construction other optional

    4 24" x 24" concrete columns located below 1st floor framing, have sec tion loss, due to cracked concrete just below the steel baseplates eor to provide engineering report and complete set of structural draw- ings, no later than. 11/222/16. stop all work accept temp shoring done under supervision of licensed engineer

    Nov 17, 2016

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Sep 26, 2016

    Vp*-violation unserved ecb- dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - dismissed

ECB violations

28 ECB violations, newest first.

  • Class - 2

    Provide designated lobby braille tags. replace gibs where needed.

    Aug 29, 2023

    Resolve
  • Class - 2

    Provide designated lobby braille tags. replace gibs where needed.

    Aug 29, 2023

    Resolve
  • Class - 2

    Provide designated lobby braille tags. replace gibs where needed. adjust top landing hoistway door access hole to code height.

    Aug 29, 2023

    Resolve
  • Class - 2

    Provide designated lobby braille tags. replace gibs where needed. label machine space door. provide signage in lobby as per fdny indicated loction of controller main line.

    Aug 29, 2023

    Resolve
  • Class - 2

    Provide designated lobby braille tags. replace gibs where needed. shorten hoist ropes

    Aug 29, 2023 · Penalty $312

    Resolve
  • Class - 2

    Failure to comply w/the manufacturer specifications note:at the time of my inspection of 7 story new bldg,active job site w/finishing construction activities & street cleaning activities.i observed jersey barri

    Dec 22, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Bc3301.6 work does not conform to approved construction documents &/orapproved amendments.note:at the time of my inspection of 7 story new bldg,active job site w/finishing construction activities,& cleaning ac

    Dec 22, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    3307.4.7 pedestrian protection. at the time of inspection,i observed an uncovered dumpster adj. to the pedestrian walkway,under the sidewalkshed,where construction materials/debris was being stored. no 4 barrie

    Oct 14, 2020 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to protect pedestrians @time of inspection, i observed multiple uncapped bolt screws on the sidewalk shed below 4' which leads to a hazardous condition, allowing scathers, scraps, snagged clothing to

    Aug 23, 2020 · Penalty $2,400

    Resolve
  • Class - 1

    Sec. 3301.1.3 manufactor specification. note: at the time of my inspection of a 7 sty bldg active job site i observed workers(2)approx 15-20feet in height doing framing work on a man lift. when i asked for cerf

    Jul 2, 2020

    Resolve
  • Class - 1

    Sec. 3307.5 flag person/flagger. note: at the time of my inspection of7 sty bldg active job site i observed construction debris in garbage container pushing by workers across pedestrian walkway w/o flag person

    Jul 2, 2020 · Penalty $2,500

    Resolve
  • Class - 2

    At time of inspection,observed ongoing construction activities contrary to governor's executive order#202.6;202.8;202.11;202.13 & guidance published by the empire state development corporation pursuant to same.

    Apr 6, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to notify the dept of an accident or incident that resulted ina fatality or injury. a worker was installing a window when dust blow into his eyes. ambulance was called and went to the hospital. as per a

    Feb 19, 2020 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to notify the dept of an accident or incident that resulted ina fatality or injury. note:superintendent stepped on a nail,it piercedhis boot,super went to the hospital no ambulance was called. as per a

    Dec 16, 2019 · Penalty $5,000

    Resolve
  • Class - 1

    Bc3301.7/failure to maintain display on site drawings documents required by chapter 33.no design drawings for temporary support.at time of inspection on an active jobsite of a 7 story building currently at roof

    Oct 24, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and or approved amendments 7 story building currently at roof level observed pipe scaffold installed at all exposures apprx.100ft in height section of sc

    Oct 24, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to insitute maintain saety equipment measures or temporary construction.note:at time of my inspection on complaint of an incident on7 story building work in progress one worker was injured when on worke

    Aug 29, 2019 · Penalty $10,000

    Resolve
  • Class - 1

    3308.1.1.failure to provide vertical safety netting requirements as noted,@ time of inspection,active site, steel construction old rendered 6 story.i observed vertical netting in different floors,exposures are

    Mar 21, 2018 · Penalty $1,600

    Resolve
  • Class - 1

    3303.12 failure to have hoist in a state of rediness.@time of inspection observed,jobsite not active.bldg is currently 8stories @the roof level.the hoist is not in a state of redness as required by code.the hoi

    Oct 18, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to adequately supervise work at a construction site. at time of inspection observed,active job site. a worker fell through unprotected shaft opening from the 2nd fl to the 1st fl. job site fence is miss

    Sep 26, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3301.2 failure to provide overhead protection. at time of inspection observed,active job site. no overhead protection provided for the adjoining property at the corner of exp#3 & 4,putting persons at risk

    Sep 26, 2016 · Penalty $400

    Resolve
  • Class - 1

    Failure to safeguard all persons & property affected by construction operations. at time of inspection observed,active job site. a worker fell through a shaft opening from the 2nd fl to the 1st fl & was taken

    Sep 26, 2016 · Penalty $10,000

    Resolve
  • Class - 1

    Sec. 3307.7 failure to provide job site fence. at time of inspection observed,active job site. concerte pouring operations are in progress. the job site fence has been removed along exp#4 during concrete operat

    Sep 26, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Sec. 3308.5 failure to provide vertical safety netting as required. attime of inspection observed,active job site. a worker fell from the 2nd fl to the 1st fl through an unprotected opening. vertical safety net

    Sep 26, 2016 · Penalty $1,600

    Resolve
  • Class - 1

    Work does not conform to approved construction documents or approved amendments. as noted: at time of inspection at an active construction site observed at exp#3 on foundation wall. layout for column base and

    Dec 15, 2015 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans at the jobsite. plans for the underpinning of the adjoining bldg at exp#3 is inadequate. plans indicate that underpins are 20ft deep & willbe constructed in a single

    Apr 13, 2015 · Penalty $500

    Resolve
  • Class - 2

    Failure to post permit for work at premises. at time of inspection ob servced demolition jobsite. project panels on jobsite fence did not hvpermit posted. i looked over jobsite fence to see if permit was posted

    Feb 7, 2015 · Penalty $400

    Resolve
  • Class - 1

    Bc 3303.4.1 maintenance: tripping hazards. at time of inspection observed demolition jobsite. public sidewalk at 9th avenue between 48-49 sthad apprx 20 post holes in sidewalk. the holes were apprx 1 1/2" to 2"

    Feb 7, 2015 · Penalty $400