4813 9 Avenue
Brooklyn, NY 11220BBL 3-05631-0001Map
Owner of record: Maimonides Medical Center
4813 9 Avenue is a hospital / health built in 2015 in Brooklyn, 11220. The owner of record is Maimonides Medical Center. HPD has recorded 3 housing violations here, most recently on February 11, 2004. 3 of the 3 most recent violations are still open.
- HPD violations
- 3
- DOB violations
- 9
- ECB violations
- 28
- HPD complaints
- 1
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 3
- BHazardous
Abate the nuisance consisting of vermin - mice and roaches, 1st sty., apartment - kitchen.
Feb 11, 2004
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective - plater-board, ceiling cellar throughout.
Feb 11, 2004
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective - glass, cellar windows north and northwest.
Feb 11, 2004
Open — Nov sent out
DOB building violations · 9
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2021
Aug 21, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Construction other optional
4 24" x 24" concrete columns located below 1st floor framing, have sec tion loss, due to cracked concrete just below the steel baseplates eor to provide engineering report and complete set of structural draw- ings, no later than. 11/222/16. stop all work accept temp shoring done under supervision of licensed engineer
Nov 17, 2016
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 26, 2016
Vp*-violation unserved ecb- dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 28
- Class - 2
Provide designated lobby braille tags. replace gibs where needed.
Aug 29, 2023
Resolve - Class - 2
Provide designated lobby braille tags. replace gibs where needed.
Aug 29, 2023
Resolve - Class - 2
Provide designated lobby braille tags. replace gibs where needed. adjust top landing hoistway door access hole to code height.
Aug 29, 2023
Resolve - Class - 2
Provide designated lobby braille tags. replace gibs where needed. label machine space door. provide signage in lobby as per fdny indicated loction of controller main line.
Aug 29, 2023
Resolve - Class - 2
Provide designated lobby braille tags. replace gibs where needed. shorten hoist ropes
Aug 29, 2023 · Penalty $312
Resolve - Class - 2
Failure to comply w/the manufacturer specifications note:at the time of my inspection of 7 story new bldg,active job site w/finishing construction activities & street cleaning activities.i observed jersey barri
Dec 22, 2020 · Penalty $1,250
Resolve - Class - 1
Bc3301.6 work does not conform to approved construction documents &/orapproved amendments.note:at the time of my inspection of 7 story new bldg,active job site w/finishing construction activities,& cleaning ac
Dec 22, 2020 · Penalty $2,500
Resolve - Class - 2
3307.4.7 pedestrian protection. at the time of inspection,i observed an uncovered dumpster adj. to the pedestrian walkway,under the sidewalkshed,where construction materials/debris was being stored. no 4 barrie
Oct 14, 2020 · Penalty $2,400
Resolve - Class - 2
Failure to protect pedestrians @time of inspection, i observed multiple uncapped bolt screws on the sidewalk shed below 4' which leads to a hazardous condition, allowing scathers, scraps, snagged clothing to
Aug 23, 2020 · Penalty $2,400
Resolve - Class - 1
Sec. 3301.1.3 manufactor specification. note: at the time of my inspection of a 7 sty bldg active job site i observed workers(2)approx 15-20feet in height doing framing work on a man lift. when i asked for cerf
Jul 2, 2020
Resolve
Complaints
- Unsanitary condition
Mold
Mar 16, 2021 · Apt 6E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Hospital / health (I9)
- Year built
- 2015
- Floors
- 7
- Residential units
- —
- Building area
- 206,714 ft²
- Lot area
- 29,146 ft²
- Zoning
- R6
- Community board
- 312
- Council district
- 38
- Block / lot
- 5631 / 1
- Assessed value
- $22,092,750
- Landmark / historic district
- No
Questions about 4813 9 Avenue
Who owns 4813 9 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Maimonides Medical Center.
Does 4813 9 Avenue have violations?
Yes. NYC HPD has recorded 3 housing violations at this property.
Is 4813 9 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 4813 9 Avenue built?
City records list 2015 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.