905 43 Street
Brooklyn, NY 11232BBL 3-05595-0001Map
Owner of record: Drenis Developments, LLC
905 43 Street is a walk-up apartment building built in 1922 in Brooklyn, 11232. It has 48 residential units across 4 floors. The owner of record is Drenis Developments, LLC. HPD has recorded 96 housing violations here, most recently on May 28, 2025. 2 of the 50 most recent violations are still open. City tax records listed 48 rent-stabilized apartments here in 2024.
- HPD violations
- 96
- DOB violations
- 5
- ECB violations
- 7
- HPD complaints
- 286
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 96
- ANon-hazardous
Cleanse to the satisfaction of this department the inside lot line fence area 1st from south at west,
May 28, 2025
Closed — Violation dismissed - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor, at the east section at public hall, 1st story
May 28, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of kid scooter at west section at public hall, 1st story
May 28, 2025
Open — Invalid certification - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Oct 2, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hiinges, door leading to east yard at public hall, 1st story
Oct 25, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 22, 2022
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors at entrance to building 1st at east at public hall, 1st story, section at west
Apr 29, 2021
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors at entrance to building 1st at west at public hall, 1st story, section at east
Apr 29, 2021
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 00; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt a11, 1st story, 1st apartment from east at south , section at east
Apr 29, 2021 · Apt A11
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors at apartment in the entrance located at apt a11, 1st story, 1st apartment from east at south , section at east
Apr 29, 2021 · Apt A11
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
M/d law abate the nuisance consisting of key operated lock installed on room door leading to fire escape window in the 1st room from east at south located at apt a11, 1st story, 1st apartment from east at south , section at east
Apr 29, 2021 · Apt A11
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the ceramic tiles with grouted joints of visible mold at east and west walls around bathtub in the bathroom located at apt a11, 1st story, 1st apartment from east at south , section at east
Apr 29, 2021 · Apt A11
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt a11, 1st story, 1st apartment from east at south , section at east
Mar 28, 2021 · Apt A11
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Mar 18, 2021
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt c3, 3rd story, 1st apartment from south at west
Feb 26, 2020 · Apt C3
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt b12, 2nd story, 2nd apartment from east at south
May 13, 2019 · Apt B12
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt b12, 2nd story, 2nd apartment from east at south
May 13, 2019 · Apt B12
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood flooring in the kitchen located at apt b12, 2nd story, 2nd apartment from east at south
May 13, 2019 · Apt B12
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt b12, 2nd story, 2nd apartment from east at south
May 13, 2019 · Apt B12
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt b12, 2nd story, 2nd apartment from east at south
May 13, 2019 · Apt B12
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood flooring in the bathroom located at apt b12, 2nd story, 2nd apartment from east at south
May 13, 2019 · Apt B12
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all wall and ceiling in the bathroom located at apt b12, 2nd story, 2nd apartment from east at south
May 13, 2019 · Apt B12
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 12 sq.ft at west wall in the bathroom located at apt b12, 2nd story, 2nd apartment from east at south
May 13, 2019 · Apt B12
Closed — Violation closed - ANon-hazardous
Properly secure the loose handrail on west wall at vestibule , 1st story
May 7, 2019
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of house hold articles on 3rd story balcony ,north/west stack building rear
May 7, 2019
Closed — Violation closed - CImmediately hazardous
Fire escape defective. properly secure the loose bottom rail front fascia on 3rd story balcony at stack on west exterior wall
May 7, 2019
Closed — Violation closed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at west stack in center court yard
May 7, 2019
Closed — Violation closed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at south/east stack building front
May 7, 2019
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots on 2nd story balcony ,south/east stack building front
May 7, 2019
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tile at sink in the kitchen located at apt b12, 2nd story, 2nd apartment from east at south
May 6, 2019 · Apt B12
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at window casing in the bathroom located at apt b12, 2nd story, 2nd apartment from east at south
May 6, 2019 · Apt B12
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic flooring throughout in the bathroom located at apt b12, 2nd story, 2nd apartment from east at south
May 6, 2019 · Apt B12
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at bath tub walls in the bathroom located at apt b12, 2nd story, 2nd apartment from east at south
May 6, 2019 · Apt B12
Closed — Violation closed - ANon-hazardous
Refit window in the bathroom located at apt b12, 2nd story, 2nd apartment from east at south
May 6, 2019 · Apt B12
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt c6, 3rd story, 3rd apartment from north at east
Jul 11, 2015 · Apt C6
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt c6, 3rd story, 3rd apartment from north at east
Jul 11, 2015 · Apt C6
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the entire apartment located at apt c6, 3rd story, 2nd apartment from north at east
Jun 19, 2015 · Apt C6
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tile floor in the kitchen located at apt c6, 3rd story, 2nd apartment from north at east
Jun 19, 2015 · Apt C6
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Mar 23, 2015
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective re-glaze bathtub in the bathroom located at apt c2, 3rd story, 2nd apartment from east at south
Jan 6, 2015 · Apt C2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of mice located at apt c2, 3rd story, 2nd apartment from east at south
Jan 6, 2015 · Apt C2
Closed — Violation closed - ANon-hazardous
Refit the lower sash in the kitchen located at apt c2, 3rd story, 2nd apartment from east at south
Jan 6, 2015 · Apt C2
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt c2, 3rd story, 2nd apartment from east at south
Jan 6, 2015 · Apt C2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east located at apt d11, 4th story, 1st apartment from east at south
Dec 31, 2014 · Apt D11
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile at east wall in the bathroom located at apt d11, 4th story, 1st apartment from east at south
Dec 31, 2014 · Apt D11
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt d11, 4th story, 1st apartment from east at south
Dec 31, 2014 · Apt D11
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening key operated lock at door leading to fire escape in the 2nd room from east at south located at apt d3, 4th story, 1st apartment from south at west
Apr 10, 2014 · Apt D3
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 3rd room from north, the 4th room from north located at apt d3, 4th story, 1st apartment from south at west , section at west
Mar 25, 2014 · Apt D3
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective light fixture at ceiling in the foyer located at apt d11, 4th story, 1st apartment from south at west , section at south
Feb 8, 2014 · Apt D11
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt d11, 4th story, 1st apartment from south at west , section at south
Feb 8, 2014 · Apt D11
Closed — Violation closed
DOB building violations · 5
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Construction other optional
C-construction other optional
Jun 24, 1992
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jun 24, 1992
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jun 24, 1992
Vp*-violation unserved ecb- dismissed - Construction other optional
C-construction other optional
Jun 24, 1992
Vp*-violation unserved ecb- dismissed
ECB violations · 7
- Class - 3
Zr 25-621 zoning non-conforming-location of accessory parking pad. observed at rear yard being used as open off street accessory parking area. grey toyota w/ ny plate#ehr3354 observed parked at rear yard w/o fi
Nov 20, 2018
Resolve - Class - 3
Failure to maintain building in a code compliant manner-work w/o a permit. observed a curb cut approximately of 15ft included splays. there is not records or permit for this curb cut. this building is a corner
Nov 20, 2018
Resolve - Class - 1
Use of illegal hardware. note: a lock w/ key been attached to the two fire escape exit door leading from the(open)court at the center of thebldg. where one of the fire escape stair located to the side passage
Jul 2, 2008 · Penalty $1,000
Resolve - Hazardous
Failure to maintain:botton moulding above entrance door front of bldg is bend & falling off.remedy:make necessary repair to the satisfacyion of this department.
Jun 24, 1992
Resolve - Non-hazardous
No screen at a skylight:both bulk head skylight doesn't have screen(north& south wing section).remdy:provide screen as per code.
Jun 24, 1992 · Penalty $350
Resolve - Hazardous
Failure to maintain:broken window glass at 1st flr.window next to staircase(south wing stairwell)remedt:make necessary repairs to the satisfaction of this department.
Jun 24, 1992 · Penalty $800
Resolve - Non-hazardous
Combination stair landng(exterior stair)stair at south wing section 1st flr lead to court yard has landing made of wood all other stair lead to said area has metal landing.remedy:provide noncombustible landing
Jun 24, 1992 · Penalty $350
Resolve
Complaints
- Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 14, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 28, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 23, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2022 · Apt BLDG
Close - Unsanitary condition
Pests
Oct 28, 2022 · Apt B6
Close - Unsanitary condition
Pests
Oct 28, 2022 · Apt B6
Close - Door/window
Door
Mar 17, 2021 · Apt A11
Close
Show 40 more ↓
- Flooring/stairs
Floor
Mar 17, 2021 · Apt A11
Close - General
Cabinet
Mar 17, 2021 · Apt A11
Close - Unsanitary condition
Mold
Mar 17, 2021 · Apt A11
Close - Paint/plaster
Wall
Mar 17, 2021 · Apt A11
Close - Unsanitary condition
Pests
May 2, 2020 · Apt B6
Close - Heat/hot water
Apartment only
Feb 24, 2020 · Apt C3
Close - Flooring/stairs
Floor
May 7, 2019 · Apt B12
Close - Paint/plaster
Window/frame
May 7, 2019 · Apt B12
Close - Paint/plaster
Wall
May 7, 2019 · Apt B12
Close - Unsanitary condition
Mold
May 7, 2019 · Apt B12
Close - Paint/plaster
Wall
May 3, 2019 · Apt B12
Close - Plumbing
Bathtub/shower
May 3, 2019 · Apt B12
Close - Flooring/stairs
Floor
May 3, 2019 · Apt B12
Close - Paint/plaster
Wall
May 3, 2019 · Apt B12
Close - General
Cabinet
May 3, 2019 · Apt B12
Close - Door/window
Window frame
May 3, 2019 · Apt B12
Close - Plumbing
Steam pipe/riser
May 3, 2019 · Apt B12
Close - Heat/hot water
Apartment only
Jan 31, 2019 · Apt B5
Close - Door/window
Window frame
Jan 6, 2018 · Apt C3
Close - Heat/hot water
Apartment only
Jan 6, 2018 · Apt C3
Close - Outside building
Roofing
Dec 17, 2016 · Apt D11
Close - Paint/plaster
Ceiling
Dec 17, 2016 · Apt D11
Close - General
Cabinet
Dec 17, 2016 · Apt D11
Close - Water leak
Heavy flow
Dec 17, 2016 · Apt D11
Close - Plumbing
Water supply
Oct 11, 2016 · Apt D3
Close - Door/window
Window frame
Dec 30, 2015 · Apt C2
Close - Plumbing
Bathtub/shower
Dec 30, 2015 · Apt C2
Close - Appliance
Refrigerator
Dec 30, 2015 · Apt C2
Close - Paint/plaster
Ceiling
Dec 30, 2015 · Apt C2
Close - Unsanitary condition
Pests
Dec 30, 2015 · Apt C2
Close - Appliance
Electric/gas range
Dec 30, 2015 · Apt C2
Close - Heat/hot water
Apartment only
Dec 11, 2015 · Apt D11
Close - Water leak
Slow leak
Dec 2, 2015 · Apt D11
Close - Outside building
Roofing
Dec 2, 2015 · Apt D11
Close - Plumbing
Toilet
Jun 12, 2015 · Apt C6
Close - Paint/plaster
Wall
Jun 12, 2015 · Apt C6
Close - Flooring/stairs
Floor
Jun 12, 2015 · Apt C6
Close - Water leak
Slow leak
Jun 8, 2015 · Apt D11
Close - Outside building
Roofing
Jun 8, 2015 · Apt D11
Close - Appliance
Electric/gas range
Apr 9, 2015 · Apt D5
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1922
- Floors
- 4
- Residential units
- 48
- Building area
- 36,000 ft²
- Lot area
- 10,000 ft²
- Zoning
- R6
- Community board
- 312
- Council district
- 38
- Block / lot
- 5595 / 1
- Assessed value
- $1,346,400
- Landmark / historic district
- No
HPD registration #312960, last renewed Sep 6, 2025.
Questions about 905 43 Street
Who owns 905 43 Street?
The owner of record in NYC Department of City Planning PLUTO data is Drenis Developments, LLC.
Does 905 43 Street have violations?
Yes. NYC HPD has recorded 96 housing violations at this property.
Is 905 43 Street rent stabilized?
NYC Department of Finance tax bills listed 48 rent-stabilized units here in 2024 (about 100% of its 48 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 905 43 Street built?
City records list 1922 as the year it was built.
How many apartments are in 905 43 Street?
It has 48 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.