961 42 Street
Brooklyn, NY 11219BBL 3-05590-0052Map
Owner of record: Park Affordable HDFC, As Nominee And On Behalf
961 42 Street is a walk-up apartment building built in 1926 in Brooklyn, 11219. It has 35 residential units across 4 floors. The owner of record is Park Affordable HDFC, As Nominee And On Behalf. HPD has recorded 623 housing violations here, most recently on August 10, 2026. 5 of the 50 most recent violations are still open. City tax records listed 35 rent-stabilized apartments here in 2024.
- HPD violations
- 623
- DOB violations
- 20
- ECB violations
- 7
- HPD complaints
- 406
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 623
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at lobby, 1st story
Aug 10, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt b3, 2nd story, 2nd apartment from south at west , section at east
Aug 8, 2026 · Apt B3
Open — Notice of issuance sent to tenant - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes trash cans at fire ladder landing at the 2nd fire escape from north at building front at fire escape
Jul 1, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at north wall (less than 10 sq ft) in the bathroom located at apt b6, 2nd story, 2nd apartment from east at south original violation 19019772 issued 17-jun-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jun 17, 2026 · Apt B6
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective located at apt c8, 3rd story, 1st apartment from west at north
Jun 17, 2026 · Apt C8
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective located at apt c8, 3rd story, 1st apartment from west at north
Jun 17, 2026 · Apt C8
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of air conditioner installed at fire escape window located at apt c8, 3rd story, 1st apartment from west at north
Jun 17, 2026 · Apt C8
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding allowable temp of 130 degrees in the kitchen located at apt a7, 1st story, 1st apartment from west at north
Jun 17, 2026 · Apt A7
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt b3, 2nd story, 2nd apartment from south at west
Jun 17, 2026 · Apt B3
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at north wall (less than 10 sq ft) in the bathroom located at apt b6, 2nd story, 2nd apartment from east at south
Jun 17, 2026 · Apt B6
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at west located at apt c5, 3rd story, 2nd apartment from west at north
Nov 6, 2025 · Apt C5
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt c5, 3rd story, 2nd apartment from west at north
Nov 6, 2025 · Apt C5
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from north at west located at apt b4, 2nd story, 1st apartment from west at north
Nov 6, 2025 · Apt B4
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchen located at apt b4, 2nd story, 1st apartment from west at north
Nov 6, 2025 · Apt B4
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt c5, 3rd story, 2nd apartment from west at north
Nov 6, 2025 · Apt C5
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt c5, 3rd story, 2nd apartment from west at north
Nov 6, 2025 · Apt C5
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt c5, 3rd story, 2nd apartment from west at north
Nov 6, 2025 · Apt C5
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt c5, 3rd story, 2nd apartment from west at north
Nov 6, 2025 · Apt C5
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at west located at apt c5, 3rd story, 2nd apartment from west at north
Nov 6, 2025 · Apt C5
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 1st room from north at east located at apt c5, 3rd story, 2nd apartment from west at north
Nov 6, 2025 · Apt C5
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt c5, 3rd story, 2nd apartment from west at north
Nov 6, 2025 · Apt C5
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchen located at apt c5, 3rd story, 2nd apartment from west at north
Nov 6, 2025 · Apt C5
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt b4, 2nd story, 1st apartment from west at north
Nov 6, 2025 · Apt B4
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt b4, 2nd story, 1st apartment from west at north
Nov 6, 2025 · Apt B4
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 13, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of aluminum vehicle extension platforms in the east section at public hall, 2nd story
Aug 13, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at the door to north yard, at public hall, 1st story
Aug 13, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 1st fire escape from east at south, 4th story
May 19, 2025
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt a7, 1st story, 1st apartment from west at north , section ''west''
May 16, 2025 · Apt A7
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt a7, 1st story, 1st apartment from west at north , section ''west''
May 16, 2025 · Apt A7
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt a7, 1st story, 1st apartment from west at north , section ''west''
May 16, 2025 · Apt A7
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a7, 1st story, 1st apartment from west at north , section ''west''
May 16, 2025 · Apt A7
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt a7, 1st story, 1st apartment from west at north , section ''west''
May 16, 2025 · Apt A7
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding allowable temp of 130 degrees in the kitchen located at apt a7, 1st story, 1st apartment from west at north , section ''west''
May 16, 2025 · Apt A7
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective rubber gasket at refrigerstor & freezer doors in the kitchen located at apt a7, 1st story, 1st apartment from west at north , section ''west''
May 16, 2025 · Apt A7
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of flower pots at 1st fire escape from east at south, 4th story
May 16, 2025
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at light fixture at ceiling in the bathroom located at apt a4, 1st story, 1st apartment from north at east
Mar 18, 2025 · Apt A4
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective broken glass pane at lower sash window in the 1st room from east located at apt a8, 1st story, 2nd apartment from west at north
Mar 18, 2025 · Apt A8
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt b6, 2nd story, 2nd apartment from east at south
Mar 6, 2025 · Apt B6
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt b6, 2nd story
Mar 6, 2025 · Apt B6
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt b6, 2nd story, 2nd apartment from east at south original violation 17741543 issued 06-mar-25 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Mar 6, 2025 · Apt B6
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeded the maximum allowable limit of hot water 130f degrees at all hot water faucet at entire apartment, temperature found 145f degrees, thermometer #6948 in the entire apartment located at apt b6, 2nd story, 2nd apartment from east at south
Mar 6, 2025 · Apt B6
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt b6, 2nd story, 2nd apartment from east at south
Mar 6, 2025 · Apt B6
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from east, the kitchen located at apt b6, 2nd story, 2nd apartment from east at south
Mar 6, 2025 · Apt B6
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective gasket at refrigerator door. in the kitchen located at apt a7, 1st story, 1st apartment from west at north
Feb 25, 2025 · Apt A7
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt a7, 1st story, 1st apartment from west at north
Feb 25, 2025 · Apt A7
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt a7, 1st story, 1st apartment from west at north
Feb 25, 2025 · Apt A7
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a7, 1st story, 1st apartment from west at north
Feb 25, 2025 · Apt A7
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt a7, 1st story, 1st apartment from west at north
Feb 25, 2025 · Apt A7
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hotwater exceeding the maximum temperature of 130 degrees at all hot water fixtures in the kitchen located at apt a7, 1st story, 1st apartment from west at north
Feb 25, 2025 · Apt A7
Closed — Violation dismissed
DOB building violations · 20
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 5, 2016
Dob violation - dismissed - Low pressure boiler boiler required
For failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed
Show 10 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 24, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 7
- Class - 2
Failure to maintain bldg wall(s) or appurtenances.noted:@exp#3 debris on fire escapes.rem:remove debris.
Jul 7, 2016
Resolve - Class - 1
Failure to maintain bldg in code compliant manner.noted:@cellar(left&right) ceilings do not have fire retarding materials.the joists are exposed to the apts @the 1st flr.mpd has been made aware of the issue.rem
Jul 7, 2016 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner.noted:@cellar level,defective joists,sagging &have been"sistered"improperly sistered joists are not fully supported.@cellar level,slab concrete, is cracked,brok
Jul 7, 2016 · Penalty $1,000
Resolve - Class - 1
Work w/out a permit @the time of my insp 10:20am on 7/7/16 @above address on safety sweep i observed in apt #b6 newly renovated apt w/new gas valve installed behind stove.no permits on file for gas pipe repair.
Jul 7, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to have new or altered plumbing system tested @the time of my insp 10:20am on 7/7/16 @above i observed on safety sweep in apt #b6 newly installed gas value for new stove which had no proper testing perf
Jul 7, 2016 · Penalty $1,000
Resolve - Class - 1
Gas being supplied to bldg w/out insp & cert by dob @the time of my insp 10:20am on 07/07/16 @above address i observed on safety sweep in apt #b6 newly installed gas valve for stove & stove is fully operatonal
Jul 7, 2016 · Penalty $1,000
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner.@the time of my insp10:00am on 7/7/16 @above address i observed in cellar on safety sweep several gas meter bars broken.i observed an sanitary pipe installed on
Jul 7, 2016 · Penalty $1,000
Resolve
Complaints
- Water leak
Slow leak
Oct 16, 2026 · Apt C9
Open - Water leak
Heavy flow
Aug 7, 2026 · Apt C5
Close - Flooring/stairs
Floor
Aug 7, 2026 · Apt C5
Close - Paint/plaster
Ceiling
Aug 7, 2026 · Apt C5
Close - Electric
Outlet/switch
Aug 7, 2026 · Apt C5
Close - Electric
Outlet/switch
Jul 18, 2026 · Apt C5
Close - Door/window
Window frame
Jul 5, 2026 · Apt C5
Close - Water leak
Heavy flow
Jul 5, 2026 · Apt C5
Close - Water leak
Heavy flow
Jun 22, 2026 · Apt C5
Close - General
Signage missing
May 1, 2026 · Apt BLDG
Close
Show 40 more ↓
- Water leak
Heavy flow
Apr 21, 2026 · Apt B2
Close - Plumbing
Bathtub/shower
Mar 11, 2026 · Apt B2
Close - Plumbing
Toilet
Mar 11, 2026 · Apt B2
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Door/window
Door
Oct 30, 2025 · Apt A7
Close - Water leak
Heavy flow
Oct 30, 2025 · Apt C5
Close - Water leak
Heavy flow
Oct 30, 2025 · Apt C5
Close - Flooring/stairs
Floor
Oct 30, 2025 · Apt C5
Close - Water leak
Damp spot
Oct 30, 2025 · Apt C5
Close - Flooring/stairs
Floor
Oct 30, 2025 · Apt C5
Close - Water leak
Heavy flow
Oct 17, 2025 · Apt B4
Close - Heat/hot water
Apartment only
Aug 12, 2025 · Apt B2
Close - Paint/plaster
Wall
May 14, 2025 · Apt C5
Close - Water leak
Slow leak
May 14, 2025 · Apt C5
Close - Unsanitary condition
Mold
May 14, 2025 · Apt C5
Close - Paint/plaster
Ceiling
May 14, 2025 · Apt C5
Close - Paint/plaster
Wall
May 14, 2025 · Apt C5
Close - Unsanitary condition
Pests
Apr 15, 2025 · Apt A7
Close - Paint/plaster
Ceiling
Mar 3, 2025 · Apt B6
Close - Plumbing
Water supply
Feb 25, 2025 · Apt A7
Close - Plumbing
Radiator
Feb 25, 2025 · Apt A7
Close - Heat/hot water
Entire building
Feb 25, 2025 · Apt A7
Close - Appliance
Refrigerator
Feb 25, 2025 · Apt A7
Close - Unsanitary condition
Pests
Feb 25, 2025 · Apt A7
Close - Unsanitary condition
Pests
Feb 25, 2025 · Apt A7
Close - Plumbing
Basin/sink
Feb 25, 2025 · Apt A7
Close - Flooring/stairs
Floor
Feb 25, 2025 · Apt A7
Close - Plumbing
Water supply
Jan 29, 2025 · Apt A7
Close - Plumbing
Radiator
Jan 29, 2025 · Apt A7
Close - Unsanitary condition
Pests
Jan 29, 2025 · Apt A7
Close - Flooring/stairs
Floor
Jan 29, 2025 · Apt A7
Close - Heat/hot water
Apartment only
Jan 29, 2025 · Apt A7
Close - Appliance
Refrigerator
Jan 29, 2025 · Apt A7
Close - Unsanitary condition
Pests
Jan 29, 2025 · Apt A7
Close - Heat/hot water
Entire building
Jan 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2025 · Apt B7
Close - Water leak
Heavy flow
Jan 21, 2025 · Apt B2
Close - Heat/hot water
Apartment only
Jan 21, 2025 · Apt B2
Close - Heat/hot water
Entire building
Dec 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2024 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1926
- Floors
- 4
- Residential units
- 35
- Building area
- 35,320 ft²
- Lot area
- 9,096 ft²
- Zoning
- R6
- Community board
- 312
- Council district
- 38
- Block / lot
- 5590 / 52
- Assessed value
- $1,453,950
- Landmark / historic district
- No
HPD registration #322154, last renewed Apr 28, 2026.
Questions about 961 42 Street
Who owns 961 42 Street?
The owner of record in NYC Department of City Planning PLUTO data is Park Affordable HDFC, As Nominee And On Behalf.
Does 961 42 Street have violations?
Yes. NYC HPD has recorded 623 housing violations at this property.
Is 961 42 Street rent stabilized?
NYC Department of Finance tax bills listed 35 rent-stabilized units here in 2024 (about 100% of its 35 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 961 42 Street built?
City records list 1926 as the year it was built.
How many apartments are in 961 42 Street?
It has 35 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.