roofy

1570 66 Street

Brooklyn, NY 11219BBL 3-05558-0043Map

Owner of record: 1570 66th Street LLC

1570 66 Street is a walk-up apartment building built in 1931 in Brooklyn, 11219. It has 16 residential units across 4 floors. The owner of record is 1570 66th Street LLC. HPD has recorded 89 housing violations here, most recently on April 21, 2026. 5 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.

HPD violations
89
DOB violations
0
ECB violations
0
HPD complaints
35

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 21, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
16
About 100% of the building's 16 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 89

  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at the north entrance to vestibule, at public hall, 1st story

    Apr 21, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latchset assembly at the north entrance to vestibule, at public hall, 1st story

    Apr 21, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges springs at the east entrance to yard, at public hall, 1st story

    Apr 21, 2026

    Closed — Violation closed
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Apr 21, 2026

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 3d, 4th story, 1st apartment from west at north

    Mar 18, 2026 · Apt 3D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the kitchen located at apt 3d, 4th story, 1st apartment from west at north

    Mar 18, 2026 · Apt 3D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3d, 4th story, 1st apartment from west at north

    Mar 18, 2026 · Apt 3D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective caulking around the bathtub in the bathroom located at apt 3d, 4th story, 1st apartment from west at north

    Mar 18, 2026 · Apt 3D

    Closed — Violation dismissed
  • B

    Provide adequate supply of hot water for the fixtures low pressure at wash basin in the bathroom located at apt 3d, 4th story, 1st apartment from west at north

    Mar 18, 2026 · Apt 3D

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2d, 4th story, 2nd apartment from east at south

    Mar 18, 2026 · Apt 2D

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3d, 4th story, 1st apartment from west at north

    Mar 18, 2026 · Apt 3D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3d, 4th story, 1st apartment from west at north

    Mar 18, 2026 · Apt 3D

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 4th story, 1st apartment from west at north

    Mar 18, 2026 · Apt 3D

    Closed — Violation dismissed
  • C

    Fire escape defective. replace with new the broken, defective and/or missing 9th metal tread from bottom up at 4th story, at west stack balcony building front at fire escape, 4th story

    Sep 12, 2024

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 4d, 4th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 4D

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 3 in the entire apartment located at apt 4d, 4th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4d, 4th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 4d, 4th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 4D

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape in the 1st room from east at south located at apt 4d, 4th story, 2nd apartment from north at east

    Mar 26, 2024 · Apt 4D

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items, scooter, discarded satelite antenna, construction materials, paint cans and plastic buckets plywood and wood planks at public hall stairs, 4th story

    Mar 26, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges on door to roof at bulkhead at public hall, 4th story

    Mar 26, 2024

    Closed — Violation closed
  • B

    Replace with new the missing plexy glass at vestibule door in public hall , 1st story

    Mar 4, 2024

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective at mortise lock at entrance , 1st story

    Mar 4, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective [latch set]at the vestibule door , at public hall, 1st story

    Feb 15, 2024

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1c, 3rd story, 1st apartment from east at south

    Feb 15, 2024 · Apt 1C

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at the ceiling and all walls in the entire apartment located at apt 1c, 3rd story, 1st apartment from east at south

    Feb 15, 2024 · Apt 1C

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling, north and west walls in the bathroom located at apt 1c, 3rd story, 1st apartment from east at south

    Feb 15, 2024 · Apt 1C

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... ceramic tiestiles surface, caulking and grouts joints irrespective at north , east and south walls around bathtub in the bathroom located at apt 1c, 3rd story, 1st apartment from east at south

    Feb 15, 2024 · Apt 1C

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... approximately 12 square feet at east wall , in the bathroom located at apt 1c, 3rd story, 1st apartment from east at south

    Feb 15, 2024 · Apt 1C

    Open — First no access to re- inspect violation
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 1c, 3rd story, 1st apartment from east at south

    Feb 15, 2024 · Apt 1C

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 1c, 3rd story, 1st apartment from east at south

    Feb 15, 2024 · Apt 1C

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Feb 15, 2024

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of baby carriage on the floor, at public hall, 1st story

    Feb 15, 2024

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Feb 15, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 6, 2021

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 3rd story, 1st apartment from east at south

    Mar 25, 2021 · Apt 1C

    Open — Notice of issuance sent to tenant
  • B

    Replace with new the broken or defective wall cabinet at south wall in the kitchen located at apt 1c, 3rd story, 1st apartment from east at south

    Mar 25, 2021 · Apt 1C

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective base cabinet at sink in the kitchen located at apt 1c, 3rd story, 1st apartment from east at south

    Mar 25, 2021 · Apt 1C

    Closed — Violation dismissed
  • C

    Arrange and make self-closing the doors ... in the entrance located at apt 1c, 3rd story, 1st apartment from south at west

    Mar 14, 2021 · Apt 1C

    Closed — Violation closed
  • B

    Properly repair the broken or defective inoperable electrical outlet at east wall in the 2nd room from east located at apt 1c, 3rd story, 1st apartment from south at west

    Mar 14, 2021 · Apt 1C

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective base cabinet at sink in the kitchen located at apt 1c, 3rd story, 1st apartment from south at west

    Mar 14, 2021 · Apt 1C

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective wall cabnet at west in the kitchen located at apt 1c, 3rd story, 1st apartment from south at west

    Mar 14, 2021 · Apt 1C

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 3rd story, 1st apartment from south at west

    Mar 14, 2021 · Apt 1C

    Open — Notice of issuance sent to tenant
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Mar 12, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Mar 12, 2021

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Mar 12, 2021

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioning unit protruding more than 4 inches beyond window sill at 2nd and 3rd story balconies, north stack, building front

    Mar 12, 2021

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Mar 12, 2021

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Mar 12, 2021

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioning unit protruding more than 4 inches beyond window sill at 2nd and 4th story balconies, south stack, building front

    Mar 12, 2021

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Heat/hot water

    Entire building

    Oct 19, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Apr 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 17, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 17, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 23, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 22, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 17, 2026 · Apt BLDG

    Close
Show 25 more ↓
  • Water leak

    Slow leak

    Aug 11, 2024 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Mar 24, 2024 · Apt 4D

    Close
  • Appliance

    Electric/gas range

    Oct 13, 2023 · Apt 1C

    Close
  • Paint/plaster

    Wall

    Sep 24, 2023 · Apt 1C

    Close
  • Plumbing

    Toilet

    Feb 22, 2021 · Apt 1C

    Close
  • General

    Cabinet

    Feb 22, 2021 · Apt 1C

    Close
  • Water leak

    Heavy flow

    Feb 4, 2021 · Apt 1C

    Close
  • Plumbing

    Toilet

    Feb 4, 2021 · Apt 1C

    Close
  • General

    Cabinet

    Feb 4, 2021 · Apt 1C

    Close
  • Water leak

    Heavy flow

    May 2, 2019 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    May 2, 2019 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    May 2, 2019 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    May 2, 2019 · Apt 4C

    Close
  • Unsanitary condition

    Pests

    May 2, 2019 · Apt 4C

    Close
  • Door/window

    Window frame

    Apr 30, 2019 · Apt 4D

    Close
  • Plumbing

    Basin/sink

    Apr 30, 2019 · Apt 4D

    Close
  • Unsanitary condition

    Pests

    Apr 30, 2019 · Apt 4D

    Close
  • Paint/plaster

    Ceiling

    Oct 16, 2015 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Oct 16, 2015 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Sep 27, 2015 · Apt 1B

    Close
  • Paint/plaster

    Wall

    Sep 27, 2015 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Sep 27, 2015 · Apt 1B

    Close
  • Paint/plaster

    Ceiling

    Sep 27, 2015 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Sep 27, 2015 · Apt 1B

    Close
  • Heating

    Heat related

    Nov 14, 2010 · Apt 3D

    Close

Sales history

DatePriceTypeUnits
Dec 2, 2025$2,500,000Rentals - walkup apartments16

Building details

Building type
Walk-up apartment building (C1)
Year built
1931
Floors
4
Residential units
16
Building area
10,720 ft²
Lot area
4,020 ft²
Zoning
R5
Community board
311
Council district
43
Block / lot
5558 / 43
Assessed value
$382,500
Landmark / historic district
No

HPD registration #316548, last renewed Feb 9, 2026.

Questions about 1570 66 Street

Who owns 1570 66 Street?

The owner of record in NYC Department of City Planning PLUTO data is 1570 66th Street LLC.

Does 1570 66 Street have violations?

Yes. NYC HPD has recorded 89 housing violations at this property.

Is 1570 66 Street rent stabilized?

NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1570 66 Street built?

City records list 1931 as the year it was built.

How many apartments are in 1570 66 Street?

It has 16 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.