200 East 8 Street
Brooklyn, NY 11218BBL 3-05340-0018Map
Owner of record: 200 East 8 LLC
200 East 8 Street is a walk-up apartment building built in 1927 in Brooklyn, 11218. It has 31 residential units across 4 floors. The owner of record is 200 East 8 LLC. HPD has recorded 193 housing violations here, most recently on March 11, 2026. 2 of the 50 most recent violations are still open. City tax records listed 31 rent-stabilized apartments here in 2024.
- HPD violations
- 193
- DOB violations
- 2
- ECB violations
- 9
- HPD complaints
- 267
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 193
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall, 2nd window frame from north at east wall in the 4th room from north located at apt 2b, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Replace with new the missing latch strike plate at door frame in the entrance located at apt 2b, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall, 1st door frame from west at north wall, north wall, 1st door frame from west at north wall in the 4th room from north located at apt 2b, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east
Mar 11, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of fire door leading from 3rd story public hall sealed. at public hall, 3rd story
Aug 24, 2025
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south , section at east
Aug 24, 2025 · Apt 3C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south , section at east
Aug 24, 2025 · Apt 3C
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of key operated lock at door to room leading to fire escape in the 2nd room from north at west located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st riser from west at north wall, 1st window frame from south at west wall in the kitchen located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, 1st door frame from west at north wall, 1st radiator from west at north wall, 1st riser from south at west wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 2nd room from north at west located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame, 1st radiator from west at north wall, 1st window frame from north at east wall in the 2nd room from north at east located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame, 2nd closet from east at south wall door, 2nd closet from east at south wall door frame, 1st door frame from west at north wall, 1st door frame from north at east wall, 1st door frame from south at west wall, north wall in the private hallway located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the foyer located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall, east wall in the kitchen located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall, north wall, ceiling in the 2nd room from north at west located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st door from west at north wall in the foyer located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall in the foyer located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cracked ceramic floor tiles at public hall, 1st story
Jun 17, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at west located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective marble door saddle at east wall in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cracked ceramic floor tiles in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and west wall in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective sink countertop at south wall in the kitchen located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cracked ceramic floor tiles in the kitchen located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the 2nd room from north at east located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door from west at north wall in the foyer located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall, south wall, north wall in the 2nd room from north at east located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective regrout the joints between ceramic tiles and bathtub , at south wall, in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at west wall in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north wall in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective reglaze the porcelain paintnat bathtub, south wall, in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall, ceiling, west wall in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south , section ''east''
Jun 17, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at 1st from south at building front at fire escape
Dec 16, 2024
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Nov 13, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Nov 13, 2024 · Apt 1A
Closed — Violation dismissed
DOB building violations · 2
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 9
- Class - 1
No designated foreman.no rigger onsite.noted at the time of my inspection at an active 4 story facade restoration jobsite,i observed suspended scaffold in-place and in-use on exp1.after asking the personel on s
Oct 21, 2021 · Penalty $1,250
Resolve - Class - 2
Scaffold training certificate card not readily available for inspection.noted at the time of my inspection of an active facade construction jobsite,i observed mohammed a azad working on suspended scaffold upon
Oct 21, 2021
Resolve - Class - 2
Failure to maintain display onsite documents required by bc chapter 33noted at the time of my inspection at an active 4 story restoration jobsite,i observed sidewalk shed at exp1.upon request for shed drawings
Oct 21, 2021
Resolve - Class - 2
Sidewalk shed does not meet code specifications.noted at the time of my inspection at an active 4 story facade restoration jobsite,i observed shed installed at exp1 while active work is being performed on facad
Oct 21, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain/display onsite documents required by bc chapter 33noted at the time of my inspection at an active 4 story facade restoration jobsite(c-hook suspended scaffold in-use)upon request for design
Oct 21, 2021
Resolve - Class - 1
3314.6.2 lifelines not protectioned from shape edges and abrasions.noted at the time of my inspection at an active facade restoration jobsite on suspended scaffold,i observed lifeline installed and not protecte
Oct 21, 2021 · Penalty $2,500
Resolve - Class - 1
3314.10.10 no c-hook support device blocking.noted at the time of my inspection at a 4 story facade restoration jobsite,i observed suspendedscaffold c-hook in-place and in-use.upon further inspection,i observed
Oct 21, 2021 · Penalty $2,500
Resolve - Class - 1
104-20 special rigger failed to issued a certificate of fitness for workers on the suspended scaffold.noted at the time of my inspection at an active 4 story facade restoration jobsite,i observed 2 workers work
Oct 21, 2021 · Penalty $625
Resolve - Class - 1
3314.6.3 lifelines and suspended ropes.noted at the time of my inspection of an active 4 story facade restoration jobsite suspended scaffoldin use,i observed 2 lifelines installed to single point of anchorage
Oct 21, 2021 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Mold
Jun 4, 2026 · Apt 3G
Close - Door/window
Door
Mar 3, 2026 · Apt 2B
Close - Water leak
Damp spot
Mar 3, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Mar 3, 2026 · Apt 2B
Close - Unsanitary condition
Mold
Mar 3, 2026 · Apt 2B
Close - Paint/plaster
Ceiling
Mar 3, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Mar 3, 2026 · Apt 2B
Close - Plumbing
Basin/sink
Mar 3, 2026 · Apt 2B
Close - Water leak
Slow leak
Mar 3, 2026 · Apt 2B
Close - Unsanitary condition
Mold
Jun 12, 2025 · Apt 3C
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Jun 12, 2025 · Apt 3C
Close - Heat/hot water
Entire building
Dec 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 12, 2024 · Apt BLDG
Close - Plumbing
Water supply
Sep 12, 2024 · Apt 2B
Close - Plumbing
Bathtub/shower
Sep 12, 2024 · Apt 2B
Close - Plumbing
Basin/sink
Sep 12, 2024 · Apt 2B
Close - Unsanitary condition
Mold
May 7, 2024 · Apt 1F
Close - Heat/hot water
Entire building
Jan 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 12, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 27, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 26, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 23, 2023 · Apt BLDG
Close - Door/window
Door frame
Jul 25, 2023 · Apt 2B
Close - Door/window
Door
Jul 25, 2023 · Apt 2B
Close - Appliance
Electric/gas range
Jul 25, 2023 · Apt 2B
Close - Door/window
Door
Jul 25, 2023 · Apt 2B
Close - Door/window
Door to dumbwaiter
Jul 25, 2023 · Apt 2B
Close - Door/window
Door
Jul 25, 2023 · Apt 2B
Close - Unsanitary condition
Pests
Jun 12, 2023 · Apt 3G
Close - Paint/plaster
Ceiling
Jun 12, 2023 · Apt 3G
Close - Paint/plaster
Wall
Jun 12, 2023 · Apt 3G
Close - Door/window
Door
Jun 12, 2023 · Apt 3G
Close - Appliance
Electric/gas range
Jun 12, 2023 · Apt 3G
Close - Unsanitary condition
Pests
Jun 12, 2023 · Apt 3G
Close - Plumbing
Bathtub/shower
Jun 12, 2023 · Apt 3G
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2022 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 4
- Residential units
- 31
- Building area
- 30,000 ft²
- Lot area
- 9,640 ft²
- Zoning
- R5
- Community board
- 312
- Council district
- 40
- Block / lot
- 5340 / 18
- Assessed value
- $1,286,100
- Landmark / historic district
- No
HPD registration #301003, last renewed Sep 15, 2025.
Questions about 200 East 8 Street
Who owns 200 East 8 Street?
The owner of record in NYC Department of City Planning PLUTO data is 200 East 8 LLC.
Does 200 East 8 Street have violations?
Yes. NYC HPD has recorded 193 housing violations at this property.
Is 200 East 8 Street rent stabilized?
NYC Department of Finance tax bills listed 31 rent-stabilized units here in 2024 (about 100% of its 31 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 200 East 8 Street built?
City records list 1927 as the year it was built.
How many apartments are in 200 East 8 Street?
It has 31 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.