402 Marlborough Road
Brooklyn, NY 11226BBL 3-05157-0021Map
Owner of record: Jac Marlboro L.l.c.
402 Marlborough Road is an elevator apartment building built in 1939 in Brooklyn, 11226. It has 53 residential units across 6 floors. The owner of record is Jac Marlboro L.l.c.. HPD has recorded 510 housing violations here, most recently on July 10, 2026. City tax records listed 53 rent-stabilized apartments here in 2024.
- HPD violations
- 510
- DOB violations
- 28
- ECB violations
- 36
- HPD complaints
- 659
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 510
- BHazardous
Replace with new the missing iron hand rail at, wall to masonry ramp , southeast section, building front at fire passage way
Jul 10, 2026
Closed — Violation dismissed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the stagnant water at west court yard
Jul 10, 2026
Closed — Violation dismissed - BHazardous
Replace with new the missing iron guard rail above wall below grade at west court yard
Jul 10, 2026
Closed — Violation dismissed - BHazardous
Replace with new the missing striker plate at door frame in the entrance located at apt 1c, 1st story, 1st apartment from north at east , section ''north'', at north
Jul 10, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 1c, 1st story, 1st apartment from north at east , section ''north'', at north
Jul 10, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1c, 1st story, 1st apartment from north at east , section ''north'', at north
Jul 10, 2026 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd bathroom from north at west located at apt 1c, 1st story, 1st apartment from north at east , section ''north'', at north
Jul 10, 2026 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from north at west located at apt 1c, 1st story, 1st apartment from north at east , section ''north'', at north
Jul 10, 2026 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the mold at ceramic tiles joints at west wall in the entire apartment located at apt 1c, 1st story, 1st apartment from north at east , section ''north'', at north
Jul 10, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate ... in the entire apartment located at apt 1c, 1st story, 1st apartment from north at east , section ''north'', at north
Jul 10, 2026 · Apt 1C
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1c, 1st story, 1st apartment from north at east , section ''north'', at north
Jul 10, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from north at east
Jun 5, 2026 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1c, 1st story, 1st apartment from north at east
Jun 5, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from north at east
Jun 5, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at bulkhead
Jul 1, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at vestibule at north wall
Jul 1, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at vestibule
Jul 1, 2025
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Jul 1, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at bulkhead
Jul 1, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 9, 2025
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, east wall in the 2nd bathroom from north at west located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st closet from south at west wall door, 1st closet from south at west wall door frame in the private hallway located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 2nd closet from west at north wall door, 2nd closet from west at north wall door frame, 1st door from south at west wall, 1st door frame from south at west wall, 1st radiator from north at east wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 2nd room from north at east located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall, north wall, east wall in the 1st bathroom from north at east located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd bathroom from north at west located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 3rd room from north at west located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door, 1st closet from west at north wall door frame, 1st door from north at east wall, 1st door frame from north at east wall in the 3rd room from north at west located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 4th room from north located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door from east at south wall, 1st door frame from east at south wall, 1st window frame from south at west wall in the 1st room from north at west located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame, 1st door from south at west wall, 1st door frame from south at west wall in the foyer located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall, baseboard at east wall, east wall in the 4th room from north located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the 1st room from north at west located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at east wall in the 2nd room from north at east located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the private hallway located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the 1st bathroom from north at east located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of unlocked and unprotected fuse box with open slot at, compactor closet , south section. west wall, at public hall, 1st story
Apr 17, 2025
Closed — Violation closed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door at door west wall in the 2nd room from north at east located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective thhe wood floor in the 2nd room from north at east located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at less than 10 sqft 1st window frame from north at east wall in the 1st bathroom from north at east located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 4th room from north located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the wainscotting at west wall in the 1st room from north at west located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the 1st room from north at west located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the foyer located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east wall in the kitchen located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall in the 2nd bathroom from north at west located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from east at south wall, 1st radiator from east at south wall, 1st window frame from north at east wall in the 1st bathroom from north at east located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Apr 17, 2025 · Apt 1C
Closed — Violation closed
DOB building violations · 28
- Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Jan 13, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 4, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 17, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 3, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 2, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 2, 2014
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 28, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 23, 2013
Dob violation - resolved
Show 18 more ↓
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 9, 2011
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 9, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 22, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 8, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 8, 2008
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Jun 25, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 21, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
3p3128
Dec 11, 1998
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 17, 1995
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
(51)repair or renew stairs to motor room.(52)restore light in motor room
Nov 22, 1988
Dob violation - resolved
ECB violations · 36
- Class - 1
Failure to maintain building facade walls and appurtenances.note:at the time of inspection i observed at ex#1,east elevation,broken/cracked glass window at 6th floor,4th floor,2nd floor unsecured materialsill a
Sep 16, 2025 · Penalty $2,500
Resolve - Class - 1
Failure to ensure each worker has successfully completed the required training. at time of inspection observed workers at roof level performing work under permit#b00964046-i1-gc. spoke to workers named; pablo e
May 28, 2025 · Penalty $5,030
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. at time of inspection observed excessive brick debris and garbage bags along with a wheel barrel at rear of property creating a fire hazard. a
May 28, 2025 · Penalty $2,530
Resolve - Class - 3
Failure to post exterior wall condition certificate,as required by 1rcny 103-04.at time of inspection,certificate was not posted.rem:post exterior wall condition certificate in lobby.
Jan 18, 2023
Resolve - Class - 3
Boiler safety valves have the rating plate painted over/body drain discharge pipes missing at safety valves/anti syphon valve missing from oil supply line to oil pump;correct violation and submit the certificat
Aug 18, 2022 · Penalty $500
Resolve - Class - 2
Gas regulator not vented outdoors/debris in boiler room/no sump pump/chimney base 1/2 full/chimney door defective/flue not fire wrapped;correct violation and submit the certificate of correction
Oct 22, 2021
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35368788h issued on 12/19011 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2).rem: file a cert
Jun 29, 2020
Resolve - Class - 2
Failure to maintain exterior bldg walls & appurtenances.as noted:at time of inspection i observed on exposure #1 east elevation:-objects on fire escape;ac inadequately supported,step cracks at 5th fl spandrel;
Jun 22, 2020 · Penalty $625
Resolve - Class - 1
Failure to maintain exterior bldg facade & appurtenances as noted facade has defects from previous summons #35458252z issued on 1/7/20 as of3/5/20 no repairs have been made & no safety measures are in place to
Mar 5, 2020 · Penalty $6,250
Resolve - Class - 2
Provide keys to access motor room., provide keys to access basement and pit., repair pit
Feb 24, 2020 · Penalty $312
Resolve
Show 26 more ↓
- Class - 1
Failure to maintain exterior building facade and appurtenances. note:at the time of inspection observe repair work is not adequate and as per previously summons#35368788h dated 12/11/18 had not been corrected a
Jan 7, 2020 · Penalty $2,500
Resolve - Class - 2
Failed to notify department prior to installation or removal of suspended scaffold. at time of my inspection i observed suspended scaffold c hook scaffold in place at exp 4 at a 6 stories building. after checki
Apr 24, 2019 · Penalty $1,250
Resolve - Class - 2
Pedestrian protection does not meet code specifications. at time of inspection i observed sidewalk shed in place. failure to maintain missing protective caps throughout sidewalk shed causing an unsafe condition
Feb 20, 2019
Resolve - Class - 1
Failure to maintain exterior buildings walls and appurtenances.exposure #1 east elevation:i observed on parapet ,damaged mortar joints ,step cracks ,bulging bricks, on 6th,5th , th & 3rd floors i observed corro
Dec 11, 2018 · Penalty $2,500
Resolve - Class - 2
Faliure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #810001.rem:submit required technical report
Oct 15, 2018
Resolve - Class - 2
10h11,59m7,57bb7,56y2,56y13,16j10,11x10,70p16. 10h11-car door gibs worn replace, 59m7 machine brake maintenance tag missing provide; 57bb7-fire extinguisher tag expired provide;56y2-hoist machine oil leak cl
Jun 8, 2018 · Penalty $3,125
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Oct 14, 2014 · Penalty $400
Resolve - Class - 2
Failure to maintain exterior building est elev exp1 1st fl a/c unit supported by wood 2nd flr east elev, exp1 a/c unit supported by brick. rmdy:maintain exterior bldg.remove inadequate support for a/c unit,in
Sep 11, 2014 · Penalty $250
Resolve - Class - 1
Failure to take and provide safety measure (sidewalk shed,netting,etc)where reqruied to protect and secure public safety from documented unsafe facade as per 1 rcny 103-04. facade technical report file unsafe
Jul 31, 2013 · Penalty $6,000
Resolve - Class - 2
28-302.5:failure to provide safety measures such as sidewalk shed,fence etc. to protect public from unsafe condition as per 1rcny 103-04 facade technical report cycle 6 filed unsafe by pe/ra dated 2/21/07. rem:
Jul 30, 2012 · Penalty $8,000
Resolve - Class - 2
12x10,67l10,41d06,56y13,61g11,40r09,32h11,03i10: y/d;properly attach door. 56y;ssal leaks. 61;(unrusadable)fuses. 60b;provide proper light switch. 40r;coax cable out window. 32h;worn car sides. 03i;bottom left
Jan 11, 2012 · Penalty $2,500
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. 36017052r. remedy: file an amended report following re
Dec 29, 2011 · Penalty $2,000
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial ll11/98 report.36015668x.rem:file an amended report following remedial repairs
May 27, 2011 · Penalty $2,000
Resolve - Class - 2
28-302.5 local law report 6th cycle filed as unsafe by architect engineer no amended report was filed unsafe conditions required safety provisions for the public as per 27-129d & 1 rcny 32-03b5i no sidewalk she
May 15, 2011 · Penalty $2,000
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial ll11/98report.36015072p.rem:file an amended report following remedial repairs
Dec 17, 2010
Resolve - Class - 1
Fail to maintain bldg in code compliant manner. use of electrical doorand/or hardware per bc 1008.1.8 27-371 (j) roof bulkhead door is padlocked to handrail at bulkhead stairs. door not fully shut. panic hardwa
Dec 15, 2010 · Penalty $1,000
Resolve - Class - 2
Sec 27/bc misc 28-302.5 misc viol: local law 6th cycle report filed as"unsafe" by architect/engineer. no amended report was filed. "unsafe conditions" require safety provisions for the public as per 27-129d & 1
Nov 29, 2010 · Penalty $800
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. 36010901k. remedy: file an amended report following
Sep 17, 2010 · Penalty $800
Resolve - Class - 2
Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. rem: file an amended report following remedial repai
Dec 4, 2009 · Penalty $800
Resolve - Class - 2
Jl, local law report filed as "unsafe" by architect/engineer.no amended report was filed."unsafe condition"require safety provision for the public as per 27-129(d) x 1rcny 32-03 (b)(5)(i) no sidewalk shed fence
Sep 23, 2009 · Penalty $800
Resolve - Class - 2
Local law 6th cycle report filed as "unsafe" by architect/engineer,no amended report was filed."unsafe conditions"require safety provisions for the public as per 27-129(d) & 1 rcny 32-03(b)(5)(i).no sidewalk
Mar 4, 2009
Resolve - Class - 2
Fail to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law11/98 report. remedy: file an amended report following remedial repair
Dec 5, 2008 · Penalty $800
Resolve - Non-hazardous
27-129(d)(1)(b and c) failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report rem: file an amended report follo
May 23, 2008
Resolve - Non-hazardous
8v,46f,57o,58o,59o.
Nov 8, 1999
Resolve - Non-hazardous
08v,17i. 17-broken vision glass.
May 6, 1995 · Penalty $100
Resolve - Non-hazardous
15r,28h,31r,03o,03i,53m,57o,58o,59o,73u. 15r cover push holes. 31 wirefor beam cut out switch. 03o clean car top. 03i car top light.
Mar 8, 1994 · Penalty $200
Resolve
Complaints
- Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Aug 9, 2026 · Apt 5F
Close - Water leak
Heavy flow
Jul 7, 2026 · Apt 1C
Close - Water leak
Heavy flow
Jun 5, 2026 · Apt 1C
Close - Water leak
Heavy flow
Jun 3, 2026 · Apt 1C
Close - Plumbing
Basin/sink
Mar 13, 2026 · Apt 2C
Close - General
Janitor/super
Mar 11, 2026 · Apt 2C
Close - Electric
Wiring
Mar 11, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Mar 11, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt 6E
Open
Show 40 more ↓
- Water leak
Heavy flow
Apr 16, 2025 · Apt 1C
Close - Safety
Window guard broken/missing
Mar 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 11, 2024 · Apt BLDG
Close - Electric
Power outage
Dec 10, 2024 · Apt 2C
Close - Heat/hot water
Entire building
Oct 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Sep 21, 2023 · Apt 6J
Close - Plumbing
Bathtub/shower
May 17, 2023 · Apt 1H
Close - Unsanitary condition
Pests
May 17, 2023 · Apt 1H
Close - Safety
Smoke detector
May 17, 2023 · Apt 1H
Close - Paint/plaster
Ceiling
May 17, 2023 · Apt 1H
Close - General
Cabinet
May 17, 2023 · Apt 1H
Close - Plumbing
Basin/sink
May 17, 2023 · Apt 1H
Close - Unsanitary condition
Mold
May 17, 2023 · Apt 1H
Close - Electric
Wiring
May 17, 2023 · Apt 1H
Close - Heat/hot water
Apartment only
Mar 26, 2023 · Apt 6J
Close - Heat/hot water
Entire building
Feb 6, 2023 · Apt 6A
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt 3B
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt 6A
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2023 · Apt 3B
Close - Heat/hot water
Entire building
Jan 26, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2023 · Apt 5C
Close - Heat/hot water
Apartment only
Jan 20, 2023 · Apt 4A
Close - Heat/hot water
Entire building
Jan 19, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 23, 2022 · Apt 6J
Close - Heat/hot water
Entire building
Dec 23, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2022 · Apt 6C
Close - Water leak
Slow leak
Sep 2, 2022 · Apt 1C
Close - Unsanitary condition
Pests
Sep 2, 2022 · Apt 1C
Close - Unsanitary condition
Pests
Sep 2, 2022 · Apt 1C
Close - Water leak
Slow leak
Jan 28, 2022 · Apt 5F
Close - Heat/hot water
Entire building
Nov 23, 2021 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1939
- Floors
- 6
- Residential units
- 53
- Building area
- 52,990 ft²
- Lot area
- 14,000 ft²
- Zoning
- R6A
- Community board
- 314
- Council district
- 40
- Block / lot
- 5157 / 21
- Assessed value
- $1,543,950
- Landmark / historic district
- No
HPD registration #300244, last renewed Sep 15, 2025.
Questions about 402 Marlborough Road
Who owns 402 Marlborough Road?
The owner of record in NYC Department of City Planning PLUTO data is Jac Marlboro L.l.c..
Does 402 Marlborough Road have violations?
Yes. NYC HPD has recorded 510 housing violations at this property.
Is 402 Marlborough Road rent stabilized?
NYC Department of Finance tax bills listed 53 rent-stabilized units here in 2024 (about 100% of its 53 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 402 Marlborough Road built?
City records list 1939 as the year it was built.
How many apartments are in 402 Marlborough Road?
It has 53 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.