293 Hawthorne Street
Brooklyn, NY 11225BBL 3-05044-0053Map
Owner of record: 293 Hawthorne Venture, LLC
293 Hawthorne Street is an elevator apartment building built in 2015 in Brooklyn, 11225. It has 20 residential units across 6.25 floors. The owner of record is 293 Hawthorne Venture, LLC. HPD has recorded 32 housing violations here, most recently on July 17, 2026. 16 of the 32 most recent violations are still open. City tax records listed 20 rent-stabilized apartments here in 2024.
- HPD violations
- 32
- DOB violations
- 12
- ECB violations
- 20
- HPD complaints
- 25
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 32
- CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures .. in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Jul 17, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from north at east
Jul 17, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
Jul 17, 2026
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 8, 2026
Open — Nov sent out - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures ... in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north
May 7, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north
May 7, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
May 7, 2026
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at building front entrance door at public hall, 1st story
May 14, 2025
Closed — Violation closed - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock and latch-set at building entrance door at public hall, 1st story
May 14, 2025
Open — Not complied with - CImmediately hazardous
Remove the illegal fastening consisting of a unacceptable electromagnetic locking device installed at building front entrance door , 1st story
Jun 28, 2023
Open — Nov sent out
Show 22 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective building front entrance , 1st story
Jun 28, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 6a, 6th story, 1st apartment from south at west
Mar 5, 2021 · Apt 6A
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall in the private hallway located at apt 6a, 6th story, 1st apartment from south at west
Mar 5, 2021 · Apt 6A
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6a, 6th story, 1st apartment from south at west
Mar 5, 2021 · Apt 6A
Open — Nov certified late - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system .. at public hall, 1st story
Mar 11, 2020
Open — Not complied with - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Mar 11, 2020
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Mar 11, 2020
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Mar 11, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Mar 11, 2020
Open — First no access to re- inspect violation - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Mar 11, 2020
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north located at apt 6b upper level, 5th story, 1st apartment from north at east
Apr 3, 2019 · Apt 6B
Open — First no access to re- inspect violation - BHazardous
Repair the roof so that it will not leak over north wall in the 1st room from north located at apt 6b upper level, 5th story, 1st apartment from north at east
Apr 3, 2019 · Apt 6B
Open — First no access to re- inspect violation - BHazardous
Repair the roof so that it will not leak over ceiling and west wall in the private hallway located at apt 6b lower level, 5th story, 1st apartment from north at east
Apr 3, 2019 · Apt 6B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and west wall in the private hallway located at apt 6b lower level, 5th story, 1st apartment from north at east
Apr 3, 2019 · Apt 6B
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 6b lower level, 5th story, 1st apartment from north at east
Apr 3, 2019 · Apt 6B
Open — First no access to re- inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 6b lower level, 5th story, 1st apartment from north at east
Apr 3, 2019 · Apt 6B
Open — First no access to re- inspect violation - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Apr 3, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 3, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Apr 3, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box .. at public hall, 1st story
Apr 3, 2019
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 6; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west
Jan 22, 2019 · Apt 3A
Closed — Violation dismissed
DOB building violations · 12
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Construction other optional
C-construction other optional
May 7, 2018
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 17, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 11, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 8, 2014
Dob violation - dismissed
Show 2 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 30, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 30, 2014
Dob violation - dismissed
ECB violations · 20
- Class - 2
Provide explicitly detailed info indicating how/where to obtain keys/key fobs/numerical codes etc. in order to perform a full inpsection of this device.
Mar 6, 2026 · Penalty $1,562
Resolve - Class - 2
Provide explicitly detailed info indicating how/where to obtain keys/key fobs/numerical codes etc. in order to perform a full inpsection of this device.
Mar 6, 2026
Resolve - Class - 1
Class 1 item: inoperative disc brake monitor. class 2 items: missing in case of fire signs. replace worn gibs where needed. misaligned cab mirrors. clutch scraping. expired brake maintenance tag. top and bottom
Sep 25, 2023 · Penalty $6,250
Active - Class - 1
Failure to provide toe board as required by code.@ the time of my inspection const,work in progress. i observed new bldg structure upto 6 story no toe board was provided through the entire site. a partial stop
Jul 18, 2016 · Penalty $1,000
Resolve - Class - 1
1906.6 failure to secure reshores w/in 10'of the edge of the facade.@ time of my inspection const, work in progress i observed reshores within 1 foot of the bldg open facade not secure through the entire site.
Jul 18, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to provide handrails. at the time of my inspection, constr work in progress. i observed no handrails was provided through the entiresite.a partial stop work order was issued to 28-207 and posted at the
Jul 18, 2016 · Penalty $1,000
Resolve - Class - 1
Bc3307.6.1 failure to provide sidewalk shed as required. @ the time ofmy inspection const,work in progress. i observed sidewalk shed erected@ exp#1 of the jobsite,&inadequate & missing 5ft @ exp#2 & 4@ adjacent
Jul 18, 2016 · Penalty $1,600
Resolve - Class - 1
Bc3309.10 failure to provide adequate roof protection. @ the time of my inspection constr work in progress. i observed,roof protection provided is inadequate planking & 2" foam is missing & not secure from disl
Jul 18, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to provide adequate guardrails @ the time of my inspection co nst,work in progress. i observed guardrails tied to the concrete reshores through the entire const,site from the 2fl through the 6fl reshore
Jul 18, 2016 · Penalty $1,200
Resolve - Class - 1
Failure to adequately supervise workers at a construction site so as to maintain a sae construction site and ensure compliance with approved construction documents and chapter 33 (safeguard during construction
Jul 18, 2016 · Penalty $1,600
Resolve
Show 10 more ↓
- Class - 1
Failure to provide protected at sides of excavation. at time of inspection,while responding to complaint #3509154 observed the following: jobsite at (soe) level installing shoring under permit #320817844-01-ew-
Mar 24, 2015 · Penalty $12,000
Resolve - Class - 2
Pursuant to section 28.207.2 of the admin code of the city of new yorkyou are hereby ordered to immediately stop all at the above premises because of failure to provide approved/amended plans at the jobsite at
Nov 3, 2014 · Penalty $530
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments. observed excavation at a depth of nine feet for under pinning operation and there was no installation of the approach pit as
Nov 3, 2014 · Penalty $1,000
Resolve - Class - 2
Bc3309.6 failure to monitor adjoining structures for movement in all directions during excavation related activities. observed excavation for the start of underpinning and the adjoining building was not being
Nov 3, 2014 · Penalty $830
Resolve - Class - 1
Fail to provide required notification prior to the commiencement of demolition.@time of insp moted the required 24hr notification was not filed on bis.rem:notify the dept(24 notification prior to start of demo
Jul 8, 2014 · Penalty $1,200
Resolve - Class - 2
Project information panel/sidewalk shed parapet panel/construction sign not provided or not in compliance with section at time of inspection note that demolition site fence did not provide the required fence vi
Jul 8, 2014 · Penalty $400
Resolve - Class - 2
Bc105.8.2 temporary construction equipment on site expired permit. at time of inspection noted no permit posted on fence after research on bis permit was expired as of 12-10-14 remedy:comply with code renew per
Jul 8, 2014
Resolve - Class - 2
No contractors sign-upon insp,noted contractors sign not provided @ this demo site an required by code.rem:comply w/the code.
May 7, 2014 · Penalty $4,000
Resolve - Class - 1
Failure to provide requ notific prior to commence of demo-upon insp,demo work has commenced,the garage is down,debris @ site.as noted the dept was not notified before commence of demo oper.rem:provide proof of
May 7, 2014 · Penalty $6,000
Resolve - Class - 1
Failure to safeguard all persons and prop affected by demo oper-upon insp demo work commenced,garage is down.@ time of insp noted debris of demo consist of wood,ply wood,metal pieces @ site.nails sticking out o
May 7, 2014 · Penalty $12,000
Resolve
Complaints
- Heat/hot water
Apartment only
Sep 21, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Aug 19, 2026 · Apt 2A
Close - Water leak
Slow leak
Aug 19, 2026 · Apt 2A
Close - Electric
Power outage
Jul 16, 2026 · Apt 4B
Close - Heat/hot water
Apartment only
Jul 16, 2026 · Apt 4B
Close - Electric
Power outage
May 6, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
May 6, 2026 · Apt 2B
Close - General
Cooking gas
May 6, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 8, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 6, 2026 · Apt 2B
Close
Show 15 more ↓
- Door/window
Door
Nov 29, 2025 · Apt 4A
Close - Door/window
Door
Apr 28, 2025 · Apt BLDG
Close - Door/window
Door
Jun 22, 2023 · Apt BLDG
Close - Unsanitary condition
Mold
Apr 3, 2023 · Apt 3A
Close - Door/window
Door
Mar 21, 2023 · Apt BLDG
Close - Water leak
Slow leak
Feb 16, 2021 · Apt 6A
Close - Door/window
Door
Nov 23, 2020 · Apt 6D
Close - Heat/hot water
Apartment only
May 18, 2020 · Apt 6B
Close - Water leak
Damp spot
Mar 30, 2020 · Apt 6B
Close - Door/window
Door
Mar 9, 2020 · Apt 2B
Close - Door/window
Door
Feb 24, 2020 · Apt 4C
Close - Heat/hot water
Entire building
Feb 8, 2020 · Apt 6A
Close - Door/window
Door
Dec 2, 2019 · Apt 4C
Close - Heat/hot water
Apartment only
Jan 21, 2019 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 21, 2019 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2015
- Floors
- 6.25
- Residential units
- 20
- Building area
- 30,777 ft²
- Lot area
- 6,647 ft²
- Zoning
- R6
- Community board
- 309
- Council district
- 40
- Block / lot
- 5044 / 53
- Assessed value
- $2,026,350
- Landmark / historic district
- No
HPD registration #387484, last renewed Aug 28, 2025.
Questions about 293 Hawthorne Street
Who owns 293 Hawthorne Street?
The owner of record in NYC Department of City Planning PLUTO data is 293 Hawthorne Venture, LLC.
Does 293 Hawthorne Street have violations?
Yes. NYC HPD has recorded 32 housing violations at this property.
Is 293 Hawthorne Street rent stabilized?
NYC Department of Finance tax bills listed 20 rent-stabilized units here in 2024 (about 100% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 293 Hawthorne Street built?
City records list 2015 as the year it was built.
How many apartments are in 293 Hawthorne Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.