64 Lincoln Road
Brooklyn, NY 11225BBL 3-05028-0006Map
Owner of record: Lincoln64 Flats LLC
64 Lincoln Road is an elevator apartment building built in 1926 in Brooklyn, 11225. It has 56 residential units across 6 floors. The owner of record is Lincoln64 Flats LLC. HPD has recorded 434 housing violations here, most recently on October 8, 2026. 3 of the 50 most recent violations are still open. City tax records listed 57 rent-stabilized apartments here in 2024.
- HPD violations
- 434
- DOB violations
- 37
- ECB violations
- 11
- HPD complaints
- 1,086
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 434
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at bulkhead at public hall, 6th story
Oct 8, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead at public hall, 6th story
Oct 8, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 3rd room from east at north located at apt 6j, 6th story, 5th apartment from west at north
Jun 10, 2026 · Apt 6J
Closed — Violation dismissed - BHazardous
Replace with new the missing iron handrails at, exit stairs below grade , northeast section, building front yard, at fire passage way
May 23, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchenette located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at west wall in the 1st room from north at west located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st door frame from south at west wall, north wall, south wall, east wall, west wall, 1st window frame from east at south wall in the 2nd room from north at east located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, 1st closet from north at east wall door frame, 1st door frame from south at west wall, picture moulding at east wall, north wall, south wall, east wall, west wall in the foyer located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective gasket at refrgerator door in the kitchenette located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective spring balances at lower and upper sashes window to south wall in the 1st room from north at west located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchenette , the bathroom located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall at buildings vestibule at public hall, 1st story
May 23, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective cracked fire retardant materials, plaster at ceiling and west wall at buildings vestibule at public hall, 1st story
May 23, 2026
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from east at south wall, 1st riser from east at south wall in the 1st room from north at west located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door, 1st closet from north at east wall wall, ceiling in the 1st room from north at west located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from east at south wall in the 2nd room from north at east located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 2nd room from north at east located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly secure the loose wash basin at west wall in the bathroom located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cracked ceramic floor tiles in the bathroom located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at, bathtub , west wall , in the bathroom located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color cracked, buldged ,plaster at ceiling in the 1st room from north at west located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color cracked and loose plaster at walls , at east closet in the 1st room from north at west located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, 1st closet from north at east wall door frame, north wall, south wall, east wall, west wall, 1st window frame from east at south wall in the 1st room from north at west located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cracked wood door in the 1st room from north at west located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color cracked, buldged , plaster at ceiling in the 2nd room from north at east located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the 2nd room from north at east located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at less than 10 sqft 1st window frame from east at south wall in the bathroom located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at west located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall, 1st radiator from east at south wall in the 1st room from north at west located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from north at east wall door in the foyer located at apt 2d, 2nd story, 3rd apartment from east at south , section ''east''
May 23, 2026 · Apt 2D
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of key operated lock at door leading to fire escape in the 1st room from north at west located at apt 6j, 6th story, 3rd apartment from west at north
Dec 10, 2025 · Apt 6J
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 6j, 6th story, 3rd apartment from west at north
Dec 1, 2025 · Apt 6J
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4f, 4th story, 1st apartment from south at west
Nov 2, 2025 · Apt 4F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling and east wall inside closet 1st from west at north, in the 3rd room from north at west located at apt 3g, 3rd story, 1st apartment from west at north , section ''west''
Jul 8, 2025 · Apt 3G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall, inside closet 1st from south at west, in the private hallway located at apt 3g, 3rd story, 1st apartment from west at north , section ''west''
Jul 8, 2025 · Apt 3G
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the heat riser in the 1st room from north at center located at apt 3g, 3rd story, 1st apartment from west at north , section ''west''
Jul 8, 2025 · Apt 3G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west, north, south and east walls in the 1st room from north at center located at apt 3g, 3rd story, 1st apartment from west at north , section ''west''
Jul 8, 2025 · Apt 3G
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the heat riser in the 1st room from north at west located at apt 3g, 3rd story, 1st apartment from west at north , section ''west''
Jul 8, 2025 · Apt 3G
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the heat riser in the kitchen located at apt 3g, 3rd story, 1st apartment from west at north , section ''west''
Jul 8, 2025 · Apt 3G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, in the kitchen located at apt 3g, 3rd story, 1st apartment from west at north , section ''west''
Jul 8, 2025 · Apt 3G
Closed — Violation dismissed
DOB building violations · 37
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 3, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 17, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 10, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 24, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 29, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 22, 2010
Dob violation - resolved
Show 27 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 13, 2009
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 27, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 22, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 2, 2008
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 24, 2008
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 28, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 20, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 15, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 29, 2003
Dob violation - resolved - Elevator elevatorrequired
3p1096
Aug 22, 2002
Dob violation - resolved - Elevator elevatorrequired
3p1096
Aug 27, 2001
Dob violation - resolved - Elevator elevatorrequired
3p1096
Oct 18, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 13, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 8, 1996
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Plumbing none
P-plumbing none
Jul 15, 1993
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 26, 1993
Vp*-violation unserved ecb- dismissed - Elevator elevatoroptional
1
Apr 25, 1991
Dob violation - dismissed - Elevator elevatorrequired
(57)clean pit (37)replace jumped out relay (37)provide service to top floor landing
May 24, 1990
Dob violation - resolved - Elevator elevatorrequired
51-provide access to motor room
Jan 23, 1989
Dob violation - resolved - Elevator elevatorrequired
(51) restore elevator service. (52) repair or renew car flooring (53) properly install car lighting fixture
Oct 6, 1988
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 26, 1988
Dob violation - resolved
ECB violations · 11
- Class - 2
Work without a permit. noted : observed at exposure 4 on flatbush avenue , a business accessory sign was installed with white background ,with wording v a s t , there is no job filing for this sign ., obtain al
Aug 27, 2024
Resolve - Class - 1
Cease use 05-a-10, 40-p-16, 100-m-07. 05-a-10 cease item. door restrictor has been rendeerd inoperative this is a safety device to insure elevator passengers safety remedy; repair restrictor, 40-p-16 provide
Aug 21, 2019 · Penalty $1,250
Resolve - Class - 1
02x10;42n09;67x10;39o02;12q07;70o02;80m07.02x10 alarm system inoperative 42n09 remove wire jumper from #4 fuse,67x10 phone inoperative,39o02 car top dirty,12q07,unguarded car lights,70o02 dirty pit 80m07,missin
Jul 22, 2014 · Penalty $1,000
Resolve - Class - 2
67x10,03x07,16j11,32j10,70o02,70k10,70p16. 67x- car phone. 03x- car ventilation 16j- 4th fl hoist slamming. 32j- excess side play. 70k- pit steel.
Aug 17, 2009 · Penalty $250
Resolve - Non-hazardous
41a10,18i10,31h10,20m07,66e10,66o02,40d06,36d06,08v10.41-repair aeceleration relay.18-repair 2nd fl hall door frame.31-repair guide shoes.20-provide grill (basement)66-repair selected tape shives
Jan 17, 2007 · Penalty $350
Resolve - Non-hazardous
08v,03i,05i,17i,15b,74d,74q,57o,29i. door checks repair, install toe guard, properly secure c.t.w sheave, replace broken c.w.t springs.
Sep 28, 1998
Resolve - Non-hazardous
15e,74m,25,22d,57o,46h,50y,74j,. 25-replace cover over door operator switchs 46- replace hoist cable 74- replace door to sheave room roof top 74- wide opening between car door and cab return when door close.
May 8, 1996 · Penalty $1,000
Resolve - Non-hazardous
14m, 17m, 57o
Oct 27, 1995 · Penalty $1,000
Resolve - Hazardous
37r, 74l. remove jumper on controller-remove jumpers on "a". deflector sheave.
Dec 13, 1994 · Penalty $500
Resolve - Non-hazardous
57o,40j,74b,35p,73#,40 pit. 74 alimiate nosie in shaft. 73 perform 5 year test and properly tag device and file elv#3 form
Jun 27, 1991
Resolve
Show 1 more ↓
- Non-hazardous
73#,return said elevator back to service so that a complete inspectioncan be made by this dept.
Apr 19, 1991 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Oct 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 7, 2026 · Apt BLDG
Close - Water leak
Slow leak
Aug 20, 2026 · Apt 6B
Close - Unsanitary condition
Garbage/recycling storage
May 21, 2026 · Apt 6A
Close - Paint/plaster
Ceiling
May 19, 2026 · Apt 2D
Close - Water leak
Heavy flow
May 19, 2026 · Apt 2D
Close - Paint/plaster
Ceiling
May 19, 2026 · Apt 2D
Close - Flooring/stairs
Floor
May 6, 2026 · Apt 6J
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt 3I
Close - Water leak
Heavy flow
Apr 9, 2026 · Apt 4E
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 3J
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 1
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 3I
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 6F
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 2I
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 6I
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 5, 2026 · Apt 4G
Close - Flooring/stairs
Floor
Feb 4, 2026 · Apt 1J
Close - General
Ventilation system
Feb 4, 2026 · Apt 1J
Close - Paint/plaster
Ceiling
Feb 4, 2026 · Apt 1J
Close - Water leak
Damp spot
Feb 4, 2026 · Apt 1J
Close - Heat/hot water
Entire building
Feb 4, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Feb 4, 2026 · Apt 2B
Close - Door/window
Window frame
Feb 4, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 4E
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt J
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt 4G
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 2, 2025 · Apt 6B
Open - Door/window
Window frame
Dec 2, 2025 · Apt 6B
Open - Door/window
Window frame
Nov 30, 2025 · Apt 6J
Close - Heat/hot water
Apartment only
Nov 30, 2025 · Apt 6J
Close - Door/window
Window frame
Nov 15, 2025 · Apt 6B
Close - Heat/hot water
Apartment only
Nov 15, 2025 · Apt 6B
Close - Heat/hot water
Apartment only
Nov 15, 2025 · Apt 6B
Close - Heat/hot water
Apartment only
Nov 15, 2025 · Apt 6B
Close - Heat/hot water
Apartment only
Nov 13, 2025 · Apt 6B
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 31, 2025 · Apt BLDG
Close - Plumbing
Bathtub/shower
Oct 31, 2025 · Apt 4F
Close - Heat/hot water
Apartment only
Oct 31, 2025 · Apt 4F
Close - Plumbing
Toilet
Oct 22, 2025 · Apt 3I
Close - Plumbing
Bathtub/shower
Oct 20, 2025 · Apt 4F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1926
- Floors
- 6
- Residential units
- 56
- Building area
- 49,930 ft²
- Lot area
- 11,275 ft²
- Zoning
- R7-1
- Community board
- 309
- Council district
- 40
- Block / lot
- 5028 / 6
- Assessed value
- $1,468,350
- Landmark / historic district
- No
HPD registration #301329, last renewed Jul 22, 2025.
Questions about 64 Lincoln Road
Who owns 64 Lincoln Road?
The owner of record in NYC Department of City Planning PLUTO data is Lincoln64 Flats LLC.
Does 64 Lincoln Road have violations?
Yes. NYC HPD has recorded 434 housing violations at this property.
Is 64 Lincoln Road rent stabilized?
NYC Department of Finance tax bills listed 57 rent-stabilized units here in 2024 (about 100% of its 56 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 64 Lincoln Road built?
City records list 1926 as the year it was built.
How many apartments are in 64 Lincoln Road?
It has 56 residential units and 63 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.