1541 New York Avenue
Brooklyn, NY 11210BBL 3-05008-0021Map
Owner of record: Farwood LLC
1541 New York Avenue is an elevator apartment building built in 2022 in Brooklyn, 11210. It has 10 residential units across 6 floors. The owner of record is Farwood LLC. HPD has recorded 7 housing violations here, most recently on June 16, 2025. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 7
- DOB violations
- 1
- ECB violations
- 29
- HPD complaints
- 10
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 7
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at sink in the kitchen located at apt 2, 1st story
Jun 19, 2005 · Apt 2
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at sink in the kitchen located at apt 2, 1st story
Jun 19, 2005 · Apt 2
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in the sink in the bathroom located at apt 2, 1st story
Jun 19, 2005 · Apt 2
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening double cylinder key operated lock at entrance door to bldg.
Jun 19, 2005
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color south & west walls in the 1st room from north at west located at apt 1fl, 1st story
Aug 28, 2003 · Apt 1FL
Closed — Violation closed - ANon-hazardous
Repair the broken or defective rain leader loose connection at gutter at south , roof
Aug 28, 2003
Closed — Violation closed
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed
ECB violations · 29
- Class - 1
Failure to notify the department of an accident incident that resultedin a fatality or an injury.note:a taxicab hit the backside of the arm bucket as per check of the department records the permit holder failed
Apr 17, 2023 · Penalty $5,000
Resolve - Class - 1
Inspection of an 6 story building with work in progress, observed at exposure one man lift with yodock system. upon review department of transportation document there none provide for airlift creating obstructi
Mar 10, 2023 · Penalty $2,500
Resolve - Class - 1
The time of inspection i observed manlift in place for exterior operation on 5th and 6th floor level as per supervisor on site and there were no sidewalk shed in place as per site safety plan and there were no
Mar 10, 2023 · Penalty $2,500
Resolve - Class - 1
Inspection of an 6 story building with work in progress , observed at exposure one a manlift adjacent to construction fence with inadequate yodock system. upon review manufacturer specs for manlift there were n
Mar 10, 2023 · Penalty $2,500
Resolve - Class - 2
At time of inspection observed construction fence in state of disrepair, panels leaning outward and have open space at multiple locations., comply with code
Mar 9, 2023
Resolve - Class - 1
Failure to to maintain record of pre shift safety meeting. pre-shift meeting log does not indicated use of boom lift and work on boom lift bucket., maintain records of pre-shift safety meeting
Mar 9, 2023
Resolve - Class - 1
Failure to safeguard. at time of inspection observed while boom lift in motion boom lift backside arm hit car. stop all use of boom lift and exterior work except safety and housekeeping., safeguard public and p
Mar 9, 2023 · Penalty $10,000
Resolve - Class - 1
Failure to promptly notify the dob of an accident or damage at construction at construction site. fdny requested inspection due boom lift while in motion hit vehicle/car., comply with code
Mar 9, 2023 · Penalty $5,000
Resolve - Class - 2
Failure to permit holder to provide inspection access to and for expose ongoing construction a work on an active jobsite at time of my inspection observed workers working framing up windows working attenion of
Nov 2, 2022 · Penalty $1,250
Resolve - Class - 2
At time of inspection of active jobsite the following was observed, upon researching permits in system, sws that is installed exp.1 has an expired permit on 8/30/22. provide active permit for temp equipmentprov
Sep 13, 2022 · Penalty $625
Resolve
Show 19 more ↓
- Class - 1
I observed active construction site at 5 floor level and supported pipe scaffold on deck and there were no guardrail system around scaffolding. this creates a safety hazard for workers using the scaffolding.sto
Aug 3, 2022 · Penalty $2,500
Resolve - Class - 1
I observed active construction site at 5 floor level and supported pipe scaffold on deck missing cross brace and working deck was not fully plank and tied down. this creates a safety hazard for workers using th
Aug 3, 2022 · Penalty $2,500
Resolve - Class - 1
I observed active construction site at 5 floor level and at rear yard at exp. #3 there were lots of broken cmu and construction debris piled up about 4 to 5 feet. large amount construction debris creates a trip
Aug 3, 2022 · Penalty $625
Resolve - Class - 2
At time of my inspection of a 6 story building 4th floor level under construction working in progress. i observed supported pipe scaffold installed at exp-1 above 40 feet height with did not obtain permit as r
Jul 20, 2022 · Penalty $625
Resolve - Class - 1
Bc 3309.10 failure to provide adequate roof protection at adjacent property.as noted:at time of inspection at an active construction site.observed work being done on second floor approximately 8'above a roof of
Jun 2, 2022 · Penalty $625
Resolve - Class - 1
Bc 3314.9.2 failure to provide base plates/mudsills on supported scaffold.as noted:at time of inspection at an active construction site observed workers on a supported scaffold on first floor/ground level witho
Jun 2, 2022 · Penalty $625
Resolve - Class - 1
Bc 3309.14 protection of windows as noted:at time of my inspection at an active construction site,observed the adjacent property on both sides(exposure 2 and 4)with no protection of windows.work being done is l
Jun 2, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to maintain a record of orientations performed at worksite at 6 stories nb, currrentlyat 1st floor, work in progress, observed site safety origination on site missing record not included as date and tim
Apr 26, 2022 · Penalty $625
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations.note at the time of my inspection on a proposed 6 story newbuilding,i observed cmu walls at exp2 and 4 approx 4ft higher than con
Apr 15, 2022 · Penalty $625
Resolve - Class - 1
Bc3307.7/missing jobsite fence.at time of inspection of an activ jobsite of a 2 story building demolition of roof in progress i observed missing jobsite fence at expo#2 and adjacent property cars parked and dem
Sep 4, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to provide safty zone for demolition operatios.at time of inspection on an active demolition site of a 2 story building demolition of roof in progress i observed no safety zone provided at exp#2 #4.adja
Sep 4, 2019 · Penalty $2,500
Resolve - Class - 1
Bc3303.7/failure to comply with new york city fire code.at time of inspection on an active demolition site of a 2 story building demolition of roof in progress i observed large amounts of combustible materials
Sep 4, 2019 · Penalty $2,500
Resolve - Class - 1
Bc3306.9.3/dust control at time of inspection of an active demolition of a 2 story building demolition of roof in progress i observed large amounts of dust during demolition operations an no dust controlling pr
Sep 4, 2019
Resolve - Class - 1
Bc3306.9.12/removal of materials.at time of inspection on an active emolition site of a 2 story building roof demolition in progress i observed large amounts of debris from roof being thrown off the building(ro
Sep 4, 2019 · Penalty $625
Resolve - Class - 1
Construction superintendent failed to perform his duties.at time of inspection on an active jobsite of a 2 story building roof demolition inprogress superintendent has failed to perform his duties by(1)visiting
Sep 4, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain adequate housekeeping @time of inspection on an active demolition site of a 2sty building demoltion of roof in progress floors & front yard @exp#1 approx. 8 feet high that pose tripping &
Sep 4, 2019 · Penalty $2,500
Resolve - Class - 1
Bc3308.1/failure to provide protection an unenclosed perimeters.at time of inspection on an active demolition site of a 2 story bilding demolition of roof in progress i observed roof removed at exp#1 & 4 and no
Sep 4, 2019 · Penalty $2,500
Resolve - Class - 2
Bc3301.13.13/inadequate construction superintendent log.at time of inspection on an active demolition of a 2 story building roof demolition in progress upon review of construction superintendent log it was obse
Sep 4, 2019 · Penalty $625
Resolve - Class - 1
Bc3301.13.1/no site safety plan.at time of inspection on an active demolition site of a 2 story building demolition of roof in progress.uponrequest for site safety plan none was provided or available at time of
Sep 4, 2019
Resolve
Complaints
- Appliance
Refrigerator
Feb 26, 2025 · Apt 2R
Close - Plumbing
Water supply
Feb 13, 2007 · Apt BLDG
Close - Heating
Heat related
Dec 20, 2006 · Apt 2
Close - Plumbing
Basin/sink
Apr 18, 2005 · Apt 2
Close - General
Locks
Apr 18, 2005 · Apt 2
Close - Plumbing
Bathtub/shower
Jun 7, 2004 · Apt 1FL
Close - Plumbing
Water-leaks
Aug 21, 2003 · Apt 1FL
Close - Plumbing
Water-leaks
Aug 21, 2003 · Apt 1FL
Close - Plumbing
Water-leaks
Aug 21, 2003 · Apt 1FL
Close - General
Windows
Aug 21, 2003 · Apt 1FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (DB)
- Year built
- 2022
- Floors
- 6
- Residential units
- 10
- Building area
- 11,218 ft²
- Lot area
- 3,000 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 45
- Block / lot
- 5008 / 21
- Assessed value
- $886,950
- Landmark / historic district
- No
HPD registration #391371, last renewed Aug 24, 2025.
Questions about 1541 New York Avenue
Who owns 1541 New York Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Farwood LLC.
Does 1541 New York Avenue have violations?
Yes. NYC HPD has recorded 7 housing violations at this property.
Is 1541 New York Avenue rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 70% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1541 New York Avenue built?
City records list 2022 as the year it was built.
How many apartments are in 1541 New York Avenue?
It has 10 residential units and 11 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.