141 East 54 Street
Brooklyn, NY 11203BBL 3-04660-0001Map
Owner of record: Lenox Palace LLC
141 East 54 Street is a walk-up apartment building built in 1927 in Brooklyn, 11203. It has 15 residential units across 4 floors. The owner of record is Lenox Palace LLC. HPD has recorded 1,134 housing violations here, most recently on September 24, 2026. 49 of the 50 most recent violations are still open. City tax records listed 15 rent-stabilized apartments here in 2024.
- HPD violations
- 1,134
- DOB violations
- 6
- ECB violations
- 17
- HPD complaints
- 2,406
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,134
- BHazardous
Properly repair with similar material the broken or defective caulking around bathtub perimeter in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Sep 24, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from north at east located at apt 1a, 1st story, 1st apartment from east at south
Sep 24, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Sep 24, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective latch assembly device at door in the entrance located at apt 1a, 1st story, 1st apartment from east at south
Sep 24, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Sep 24, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Sep 24, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Sep 24, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Sep 24, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north at east located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at all walls and ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Notice of issuance sent to tenant
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at unkeyed ceiling in the 3rd room from north at east located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 4th room from north at east located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east, west, south, and north walls in the 4th room from north at west located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective door lock in the entrance located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Replace the broken or defective water closet in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north at east located at apt 1a, 1st story, 1st apartment from east at south
Sep 19, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3c, 3rd story, 2nd apartment from south at west
Sep 15, 2026 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the south wall and ceiling in the kitchen located at apt 3c, 3rd story, 2nd apartment from south at west
Sep 15, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the kitchen located at apt 3c, 3rd story, 2nd apartment from south at west
Sep 15, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set and assembly at door in the entrance located at apt 1a, 1st story, 1st apartment from north at east
Sep 10, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Remove the torn and/or loose floor covering in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Sep 10, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at the wash basin waste line in the bathroom located at apt 1a, 1st story, 1st apartment from north at east
Sep 10, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Sep 10, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from east located at apt 1a, 1st story, 1st apartment from north at east
Sep 10, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Sep 10, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Sep 10, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 3rd room from east located at apt 1a, 1st story, 1st apartment from north at east
Sep 10, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from north at east
Sep 10, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
M/d law abate the nuisance consisting of furniture blocking fire escape window in the 3rd room from north at west located at apt 2a, 2nd story, 1st apartment from east at south
Sep 9, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Sep 9, 2026 · Apt 2A
Open — Civ14 mailed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures all electrical fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Sep 9, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective locking assembly in the entrance located at apt 2a, 2nd story, 1st apartment from east at south
Sep 9, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Sep 3, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 3rd room from north at east located at apt 1a, 1st story, 1st apartment from east at south
Sep 3, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north at east located at apt 1a, 1st story, 1st apartment from east at south
Sep 3, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 3, 2026
Open — Nov certified on time - BHazardous
Repair the leaky and/or defective faucets at washbasin, in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Aug 25, 2026 · Apt 1A
Open — Civ14 mailed - ANon-hazardous
Cleanse to the satisfaction of this department the visible mold at caulking, grouts joints of the ceramic tiles at east, north and west walls around bathtub, in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Aug 25, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood base cabinet under washbasin in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Aug 25, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Repair the broken or defective connection at the washbasin, in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Aug 25, 2026 · Apt 1A
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges springs, in the entrance located at apt 1a, 1st story, 1st apartment from east at south
Aug 25, 2026 · Apt 1A
Closed — Violation closed
DOB building violations · 6
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 27, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 13, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 23, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 23, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 17
- Class - 2
Work w/o a permit. noted at apt 2b at the 2nd fl. gut renovation work evident installation of new partitions electric & plumbing evident. remedy: stop all work make site safe. obtain all necessary permits.
Feb 14, 2015 · Penalty $800
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35058717r issued on 11/5/14 pursuant to 28-204.4 & 1rcny 102-01. at time of violation the dept reco
Dec 3, 2014 · Penalty $4,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35093342n issued on 5/7/14 pursuant to 28-204.4 & 1rcny 102-01. at time of violation the dept recor
Dec 3, 2014 · Penalty $4,000
Resolve - Class - 1
Failure to comply w/ the comm's order contained in notice of violation#34886812m issued on 11/24/10.work w/o permit @ cellar.rem:comply w/ the comm's order.
Nov 5, 2014 · Penalty $24,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35093342n issued on 5/7/14 pursuant to 28-204.4 & 1rcny 102-01. for occupancy contrary to dob recor
Sep 5, 2014 · Penalty $4,000
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34886812m issued on 11/24/10. for installing bathroom,electrical lines etc at cellar w/o a permit. remedy: comply w/the comm's orde
Sep 5, 2014 · Penalty $6,000
Resolve - Class - 1
Occupancy contrary to dob records. co 149013 & hpd # 269865 indicates bldg to have 15 class "a" apts w/ cellar ordinary ( boiler room & sto rage) illegal occupancy noted : partion. if cellar now converted to cl
May 7, 2014 · Penalty $24,000
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in notice of vio. # 34886812m issued on 11/24/10. for installing bathroom, electrical lines etc @ cellar w/o a permit. remedy: comply w/ the commissioner
May 7, 2014 · Penalty $24,000
Resolve - Class - 2
Failure to comply w/the comm's order to file a c of c w/the dob's for nov #34941520j issued on 3/22/12. remedy: file a c of c.
Dec 4, 2012 · Penalty $8,000
Resolve - Class - 1
Failure to maintain bldg in code complaint manner. noted: (1) boiler room door cannot close,due to obstruction of electrical switch. (2) boiler room: clothes hung on racks for drying. (3) iol tank room has so
Mar 22, 2012 · Penalty $5,000
Resolve
Show 7 more ↓
- Class - 2
Failure to comply w/the comm's order to file a cert of correction w/the dept of bldgs,for nov #34886813y issued on 11-24-10. remedy: comply w/comm's order.
Mar 22, 2012 · Penalty $8,000
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob for nov #34886813y for occupancy contrary - at cellar. remedy: file c/c.
Apr 9, 2011
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a certificate of correction w/the dept of bldgs. respondent failed to correct the violating condition & file a certificate of correction,pursuant to 28-204.2
Feb 3, 2011
Resolve - Class - 1
Work w/o permit.observed:@ cellar level,erected partitions,installed water,waste & electric lines to convert portion of cellar to class"a"apt.with two rooms created as bedrooms & room with shower.note:existing
Nov 24, 2010 · Penalty $1,600
Resolve - Class - 1
Occupancy contrary to that allowed by the c/o or dob records note:c/o#149013,job 301987580 and hpd#269865 indicate premises approved is "a" units fls 1-4, cellar storage/ordinary.observed:portion of cellar cone
Nov 24, 2010 · Penalty $2,400
Resolve - Class - 2
Occupancy contrary to that allowed c of o #149013. at cellar level erected partitions create room,kitchen with stove & sink,3pc bathroom. all conversion done w/o approvals. remedy: discontinue illegal use.
Apr 7, 2009
Resolve - Class - 2
Work w/o apermit noted at cellar level partitions creating room kitchen with stove and sink 3pc bathroom all work completed and done w/o permit remedy: obtain permit or restore legal condition
Apr 7, 2009
Resolve
Complaints
- Plumbing
Toilet
Oct 19, 2026 · Apt 3C
Open - Plumbing
Water supply
Oct 19, 2026 · Apt 3C
Open - Heat/hot water
Apartment only
Oct 7, 2026 · Apt 3C
Close - Heat/hot water
Apartment only
Sep 29, 2026 · Apt 3C
Close - Door/window
Door
Sep 24, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Sep 24, 2026 · Apt 2A
Close - Heat/hot water
Apartment only
Sep 24, 2026 · Apt 2A
Close - Door/window
Door
Sep 24, 2026 · Apt 1A
Close - Unsanitary condition
Mold
Sep 24, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Sep 24, 2026 · Apt 1A
Close
Show 40 more ↓
- Electric
Lighting
Sep 24, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Sep 24, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Sep 24, 2026 · Apt 1A
Close - Safety
Smoke detector
Sep 24, 2026 · Apt 1A
Close - Safety
Carbon monoxide detector
Sep 24, 2026 · Apt 1A
Close - Safety
Window guard broken/missing
Sep 24, 2026 · Apt 1A
Close - Water leak
Slow leak
Sep 15, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Sep 14, 2026 · Apt 1A
Close - Water leak
Heavy flow
Sep 14, 2026 · Apt 3C
Close - Water leak
Damp spot
Sep 11, 2026 · Apt 3C
Close - Water leak
Heavy flow
Sep 11, 2026 · Apt 3C
Close - Heat/hot water
Apartment only
Sep 11, 2026 · Apt 3C
Close - Plumbing
Water supply
Sep 11, 2026 · Apt 3C
Close - Appliance
Electric/gas range
Sep 4, 2026 · Apt 2A
Close - Electric
Outlet/switch
Sep 4, 2026 · Apt 2A
Close - Door/window
Door
Sep 4, 2026 · Apt 2A
Close - Water leak
Heavy flow
Sep 3, 2026 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Aug 31, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Aug 31, 2026 · Apt 1A
Close - Water leak
Damp spot
Aug 31, 2026 · Apt 1A
Close - Water leak
Heavy flow
Aug 24, 2026 · Apt 1A1STF
Close - Paint/plaster
Wall
Aug 17, 2026 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Aug 17, 2026 · Apt 1A
Close - Water leak
Slow leak
Aug 17, 2026 · Apt 1A
Close - Water leak
Heavy flow
Aug 2, 2026 · Apt 1A
Close - Plumbing
Water supply
Jul 31, 2026 · Apt 3C
Close - Unsanitary condition
Pests
Jul 21, 2026 · Apt 1A
Close - Water leak
Heavy flow
Jul 20, 2026 · Apt 4D
Close - Unsanitary condition
Mold
Jul 20, 2026 · Apt 4D
Close - Appliance
Refrigerator
Jul 20, 2026 · Apt 4D
Close - Paint/plaster
Ceiling
Jul 13, 2026 · Apt 4D
Close - Unsanitary condition
Mold
Jul 13, 2026 · Apt 4D
Close - Unsanitary condition
Pests
Jun 27, 2026 · Apt APT1A
Close - Safety
Smoke detector
Jun 15, 2026 · Apt 3C
Close - Safety
Carbon monoxide detector
Jun 15, 2026 · Apt 3C
Close - Safety
Fire escape
Jun 15, 2026 · Apt 1C
Close - Safety
Carbon monoxide detector
Jun 15, 2026 · Apt 1C
Close - Plumbing
Water supply
Apr 7, 2026 · Apt 3A
Close - Water leak
Heavy flow
Apr 7, 2026 · Apt 3A
Close - Paint/plaster
Ceiling
Apr 7, 2026 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 4
- Residential units
- 15
- Building area
- 12,326 ft²
- Lot area
- 5,510 ft²
- Zoning
- R6
- Community board
- 317
- Council district
- 41
- Block / lot
- 4660 / 1
- Assessed value
- $318,150
- Landmark / historic district
- No
HPD registration #307243, last renewed Aug 28, 2025.
Questions about 141 East 54 Street
Who owns 141 East 54 Street?
The owner of record in NYC Department of City Planning PLUTO data is Lenox Palace LLC.
Does 141 East 54 Street have violations?
Yes. NYC HPD has recorded 1,134 housing violations at this property.
Is 141 East 54 Street rent stabilized?
NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 100% of its 15 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 141 East 54 Street built?
City records list 1927 as the year it was built.
How many apartments are in 141 East 54 Street?
It has 15 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.