35 Inspiration Lane
Brooklyn, NY 11207BBL 3-04434-0001Map
Owner of record: Iuv Phase 1b Housing Development Fund Co Rporation
35 Inspiration Lane is an elevator apartment building built in 2025 in Brooklyn, 11207. It has 460 residential units across 14 floors. The owner of record is Iuv Phase 1b Housing Development Fund Co Rporation. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 21
- ECB violations
- 24
- HPD complaints
- 29
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 21
- Construction other optional
C-construction other optional
Jun 1, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - active
Show 11 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 4, 1992
Vw-violation work without permit - active - Construction other optional
C-construction other optional
Nov 4, 1992
Vw-violation work without permit - active - Construction other optional
C-construction other optional
May 20, 1992
Vw-violation work without permit - active - Construction other optional
C-construction other optional
May 20, 1992
Vw-violation work without permit - active - Construction other optional
C-construction other optional
Jun 20, 1990
Dob violation - active - Construction other optional
C-construction other optional
May 11, 1990
Vw-violation work without permit - active - Construction other optional
C-construction other optional
May 11, 1990
Vw-violation work without permit - active - Construction other optional
C-construction other optional
Oct 23, 1989
Vw-violation work without permit - active - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed - Construction other optional
C-construction other optional
Oct 31, 1983
Vw-violation work without permit - active
ECB violations · 24
- Class - 1
Miscellaneous violations.14-story nb building(footprint:25897sq.ft.),the site was closed with no construction activity.after repeatedly calling out and banging on the fence and gates to alert the watchperson,no
Jun 14, 2026 · Penalty $5,000
Resolve - Class - 2
Miscellaneous violations.during an exterior inspection 3314.01.observed supported scaffold at building perimeter not maintained as per code requirements.scaffold with multiple lose netting a hazardous condition
Jun 7, 2026 · Penalty $2,500
Resolve - Class - 2
During audit of cn#431/25 cd#5836 it was determined the equipment userfine line & sons corp.failed to notify the department of a change in the designed lift director as required.lift director logs provided by t
Mar 30, 2026
Resolve - Hazardous
No cert of on site inspection for the boom truck erecting steel on the site.
Nov 17, 2006 · Penalty $1,500
Active - Hazardous
Rotten exterior building doors (1)main entrance from e 101 st. (2) equipment stopage door(exterior shed). remedy: repair/replace doors.
Mar 23, 2006
Resolve - Non-hazardous
50a/38 50b fulton v.t. boiler, 15hp, nb58620, oil, 1989 50a) improper arrangement of the blowdown valves. install a screw-type (slow) valve at the outlet end of the blowdown line for code compliance. 38 no
Mar 22, 2005 · Penalty $350
Active - Non-hazardous
Failure to maintain.defect is first floor boys bathroom #120 partitionis rotten.remedy:replace partitions
Jun 4, 2004
Resolve - Non-hazardous
Failure to maintain.defects are roof leaks in room #321 and in corridor between exit #4 and room #321.remedy:repair roof
Jun 4, 2004
Resolve - Hazardous
Failure to maintain.defects are iron railing outside exit #2 are rotten and broken with sharp edges.remedy:replace iron railings
Jun 4, 2004
Resolve - Non-hazardous
Failure to use panic hardware where required by law. no panic hardware install on auditorium stage exit doors. remedy:install panic hardware
Mar 7, 2003
Resolve
Show 14 more ↓
- Hazardous
Failure to maintain.defects are -boys bathroom metal partitions in gym are rotten and bugling with sharp edges. remedy:replace partitions
Mar 7, 2003
Resolve - Non-hazardous
Failure to provide emergencky lighting fixture within corridor & stair on 2 & 3 floor failure to provide emergency power to lighting fixture within corridor & stair on 2 & 3 floor. remedy: provide emergency pow
Aug 16, 2001
Resolve - Non-hazardous
Failure to maintian building noted defects playyard has broken cracked surface holes
Jun 1, 2001
Resolve - Non-hazardous
Failure to maintian building noted defects cracks in corridor wall outside room 129 109 cracks arond door ( both sided ) exit 6
Jun 1, 2001
Resolve - Non-hazardous
Failure to maintain building:defects concrete paved surface and concrete play accessories in play yard no west of bldg are damaged remedy:maintain building,repair/replace as needed.
Jun 1, 2001
Resolve - Non-hazardous
36,49,51. install 2nd valves in water column and blowdown drains. boiler sealed do not use.
Oct 18, 2000 · Penalty $1,300
Active - Non-hazardous
Failure to maintain bldg.:defects are water damaged and defective ceiling in rm 104. cracked brick on no. side of stage in auditorium, cafeteria gym, crack walls in rm. 313, 309, 131, 327, 325, spalling conc.
May 17, 2000
Resolve - Hazardous
Failure to maintain bldg.:defects are conc. paved surface and conc. play accessories in play yard, no. west of bldg. are damaged reinf. in playyard accessories are exposed.chainlink slide gate at west side of
May 17, 2000 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain. defect: front entrance steps missing grout. peri-meter fence damaged & missing gated and rusted. areaway gratings de- teriorated possible hazard. flagpole rusted & broken hardware. curbing
May 12, 1999
Resolve - Non-hazardous
Failure to maintain. defect: roof leak into rm 309. peeling paint, ceilings and walls all floors. doors, frames and hardware, at least 12interior and 3 exterior doors. non operable. no emergency lighting in
May 12, 1999
Resolve - Non-hazardous
Work w/o a permit. work noted: demolished the structure. remedy: obtain a permit to legalize the demolition of the structure.
Apr 13, 1999 · Penalty $2,500
Active - Non-hazardous
Work without a permit. work noted: demolition of the structure. remedy: obtain a permit to legalize the demolition of the structure.
Feb 23, 1998 · Penalty $2,500
Active - Non-hazardous
Work without a permit. building demolished. remedy: obtain a demolition permit.
May 11, 1990 · Penalty $1,000
Active - Non-hazardous
Work without a permit. erecting partiton wall creating a room approx 10 x 10 and a plywood structure. remedy: obtain a permit if feasible or remove the illegal structure.
Oct 23, 1989 · Penalty $1,000
Active
Complaints
- Door/window
Door
Oct 9, 2018 · Apt 3B
Close - Paint/plaster
Wall
Oct 9, 2018 · Apt 3B
Close - Flooring/stairs
Floor
Oct 9, 2018 · Apt 3B
Close - Unsanitary condition
Mold
Oct 9, 2018 · Apt 3B
Close - Door/window
Window frame
Oct 9, 2018 · Apt 3B
Close - Heat/hot water
Entire building
Mar 15, 2017 · Apt BLDG
Close - Unsanitary condition
Pests
Nov 28, 2015 · Apt 316
Close - Unsanitary condition
Pests
Nov 28, 2015 · Apt 316
Close - Unsanitary condition
Pests
Apr 15, 2015 · Apt 409
Close - Heating
Heat related
Nov 5, 2009 · Apt 1
Close
Show 19 more ↓
- Electric
Electric-supply
Apr 29, 2009 · Apt BSMT
Close - Paint/plaster
Ceiling
Apr 29, 2009 · Apt BSMT
Close - General
Mold
Apr 29, 2009 · Apt BSMT
Close - Nonconst
Vermin
Mar 19, 2009 · Apt 1B
Close - Heating
Heat related
Jan 27, 2009 · Apt 1
Close - Heating
Heat related
Jan 26, 2009 · Apt 1
Close - Heating
Heat related
Nov 12, 2008 · Apt 3A
Close - Heating
Heat related
Oct 25, 2008 · Apt 1
Close - Electric
Electric-supply
Aug 9, 2008 · Apt 1FL
Close - Electric
Electric-supply
Aug 8, 2008 · Apt 1FL
Close - Electric
Electric-supply
Jul 7, 2008 · Apt 1FL
Close - Electric
Electric-supply
Jul 7, 2008 · Apt 1FL
Close - Heating
Heat related
Jan 3, 2008 · Apt 1FL
Close - Electric
Electric-supply
Jan 3, 2008 · Apt 1FL
Close - Electric
Electric-supply
Oct 31, 2007 · Apt BASEM
Close - Appliance
Electric/gas range
Aug 30, 2007 · Apt 3B
Close - Electric
Electric-supply
May 29, 2007 · Apt PVT
Close - Heating
Heat related
Apr 12, 2007 · Apt 3A
Close - Heating
Heat related
Nov 22, 2005 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2025
- Floors
- 14
- Residential units
- 460
- Building area
- 471,294 ft²
- Lot area
- 90,778 ft²
- Zoning
- R7-2
- Community board
- 305
- Council district
- 42
- Block / lot
- 4434 / 1
- Assessed value
- $4,119,750
- Landmark / historic district
- No
Questions about 35 Inspiration Lane
Who owns 35 Inspiration Lane?
The owner of record in NYC Department of City Planning PLUTO data is Iuv Phase 1b Housing Development Fund Co Rporation.
Does 35 Inspiration Lane have violations?
NYC HPD has no housing violations on record for this property.
Is 35 Inspiration Lane rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 35 Inspiration Lane built?
City records list 2025 as the year it was built.
How many apartments are in 35 Inspiration Lane?
It has 460 residential units and 463 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.