roofy

20 Menahan Street

Brooklyn, NY 11221BBL 3-03313-0006Map

Owner of record: Menahan Group LLC

20 Menahan Street is a walk-up apartment building built in 1931 in Brooklyn, 11221. It has 6 residential units across 3 floors. The owner of record is Menahan Group LLC. HPD has recorded 542 housing violations here, most recently on July 14, 2026. 3 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2024.

HPD violations
542
DOB violations
14
ECB violations
4
HPD complaints
964

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Jul 14, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
5
About 83% of the building's 6 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 542

  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Jul 14, 2026 · Apt 1R

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Jul 14, 2026 · Apt 1R

    Open — Civ14 mailed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling and around window recess in the bathroom located at apt 1r, 1st story

    Jul 14, 2026 · Apt 1R

    Open — Violation will be reinspected
  • B

    Trace and repair the source and abate the visible mold condition... at ceiling, east and south walls in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east

    Feb 4, 2026 · Apt 2L

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north

    Jan 22, 2025 · Apt 1L

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system locked door at basement at boiler room

    Jan 22, 2025

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceed the maximum allowable operating temperature of 130 f in the entire apartment located at apt 1l, 1st story, 1st apartment from west at north

    Jan 22, 2025 · Apt 1L

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall in the bathroom located at apt 1l, 1st story, 1st apartment from west at north

    Jan 22, 2025 · Apt 1L

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges on door in vestibule at public hall, 1st story

    Dec 27, 2024

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Oct 15, 2024 · Apt 1R

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Oct 15, 2024 · Apt 1R

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeds maximum temperature of 130 degrees fahrenheit in the kitchen located at apt 1r, 1st story, 1st apartment from south at west

    Apr 15, 2024 · Apt 1R

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate . in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Apr 15, 2024 · Apt 3L

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of door with key operated lock preventing entrance to fire escape window in the 5th room from north located at apt 1r, 1st story, 1st apartment from south at west

    Apr 15, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3l, 3rd story, 1st apartment from north at east

    Apr 15, 2024 · Apt 3L

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of door with key operated lock preventing entrance to fire escape room in the 6th room from north located at apt 3l, 3rd story, 1st apartment from north at east

    Apr 15, 2024 · Apt 3L

    Closed — Violation closed
  • B

    Repair or replace the smoke detector that is missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Apr 15, 2024 · Apt 3L

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). that is missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Apr 15, 2024 · Apt 3L

    Closed — Violation closed
  • B

    Replace with new the missing two doors at mailbox, apts 2r, and 3l, at east wall at vestibule at public hall, 1st story

    Apr 15, 2024

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor [ missing frame ] at public hall, 1st story

    Apr 15, 2024

    Closed — Violation dismissed
  • B

    Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate . in the entire apartment located at apt 1r, 1st story, 1st apartment from south at west

    Apr 15, 2024 · Apt 1R

    Closed — Violation dismissed
  • C

    Remove the illegal double cylinder key operated locking device at door . in the entrance located at apt 1r, 1st story, 1st apartment from south at west

    Apr 15, 2024 · Apt 1R

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective vestibule door at public hall, 1st story

    Dec 15, 2023

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east

    Dec 15, 2023 · Apt 2L

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story

    Dec 13, 2023 · Apt 2R

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2l, 2nd story, 1st apartment from north at east

    Nov 29, 2023 · Apt 2L

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Nov 29, 2023

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east

    Nov 29, 2023 · Apt 2L

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east

    Nov 29, 2023 · Apt 2L

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system boiler room door locked at basement

    Nov 15, 2023

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Nov 15, 2023 · Apt 1R

    Closed — Violation dismissed
  • A

    Provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door .. in the entrance located at apt 2r, 2nd story, 1st apartment from south at west

    Oct 6, 2023 · Apt 2R

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective lower window sash balances in the 1st room from north located at apt 2r, 2nd story, 1st apartment from south at west

    Oct 6, 2023 · Apt 2R

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective apartment entrance door in the entrance located at apt 2r, 2nd story, 1st apartment from south at west

    Oct 6, 2023 · Apt 2R

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective upper and lower sash window glass pane in the 6th room from north located at apt 2r, 2nd story, apartment at west

    Oct 6, 2023 · Apt 2R

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west

    Oct 6, 2023 · Apt 2R

    Closed — Violation closed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Sep 20, 2023

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective door at bottom of stairs to cellar

    Aug 21, 2023

    Closed — Violation closed
  • C

    Properly repair the broken or defective paving defective pavement at south fire passaway

    Aug 21, 2023

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of door for fire exit need key for entrance in the 4th room from north located at apt 1r, 1st story, 1st apartment from east at south

    Aug 21, 2023 · Apt 1R

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Aug 21, 2023 · Apt 1R

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    Aug 21, 2023 · Apt 1R

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective glass pane at door from vestibule to puplic hall , 1st story

    Jul 26, 2023

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective glass pane at vestibule door at lobby

    Jul 26, 2023

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Jun 4, 2023 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective ceiling light fixture in the 2nd room from north located at apt 1r, 1st story, 1st apartment from south at west

    Jun 4, 2023 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at west wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Jun 4, 2023 · Apt 1R

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Jun 4, 2023 · Apt 1R

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Jun 4, 2023 · Apt 1R

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the bathroom located at apt 1r, 1st story, 1st apartment from south at west

    Jun 4, 2023 · Apt 1R

    Closed — Violation closed

DOB building violations · 14

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 11, 2015

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 11, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
Show 4 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 4

  • Class - 1

    Plumbing work without permits. atoi at a 3-story multi dwelling observed multiple gas lined being replaced throughout basement. all work performed without permits, obtain permit

    Jul 24, 2026 · Penalty $2,500

    Resolve
  • Class - 1

    Work w/o permit work noted in cellar a power vent hot water heater installed w/no dob permit filed with the dob. photos were taken at 12:45pm. rmdy: obtain permit or restore to prior legal condition.

    Dec 12, 2014 · Penalty $8,000

    Resolve
  • Class - 1

    Failure to maintain bldg in code compliant maner. in cellar boiler rm chimney is not sealed correctly for smoke pipe entering chimney.boilerroom does not have a fire damper where fresh air should be.rmdy:mainta

    Dec 12, 2014

    Resolve
  • Hazardous

    Failure to maintain building. defect noted: stairway interior between 2nd to roof level trende are loose and also pulling away from wall. remedy maintain building make safe immediately.

    Aug 16, 2002 · Penalty $800

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 18, 2026 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Oct 8, 2026 · Apt 1L

    Open
  • Unsanitary condition

    Pests

    Oct 8, 2026 · Apt 1L

    Open
  • Paint/plaster

    Wall

    Oct 8, 2026 · Apt 1L

    Open
  • Heat/hot water

    Apartment only

    Feb 5, 2026 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Feb 2, 2026 · Apt 1R

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2026 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Dec 4, 2025 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 30, 2025 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2025 · Apt 2R

    Close
  • Heat/hot water

    Entire building

    Nov 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 22, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2025 · Apt 1L

    Close
  • Paint/plaster

    Ceiling

    Jan 21, 2025 · Apt 1L

    Close
  • Paint/plaster

    Window/frame

    Jan 21, 2025 · Apt 1L

    Close
  • Heat/hot water

    Entire building

    Dec 22, 2024 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jul 2, 2024 · Apt 2L

    Close
  • Plumbing

    Water supply

    Jul 2, 2024 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    May 22, 2024 · Apt STAIRW

    Close
  • Flooring/stairs

    Floor

    May 22, 2024 · Apt STAIRW

    Close
  • Unsanitary condition

    Pests

    May 20, 2024 · Apt 2L

    Close
  • Paint/plaster

    Ceiling

    May 20, 2024 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Apr 25, 2024 · Apt THEWHO

    Close
  • Heat/hot water

    Apartment only

    Apr 15, 2024 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Apr 15, 2024 · Apt 3L

    Close
  • Door/window

    Door

    Apr 15, 2024 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Apr 15, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Apr 15, 2024 · Apt 2R

    Close
  • Safety

    Smoke detector

    Apr 15, 2024 · Apt 2R

    Close
  • Safety

    Carbon monoxide detector

    Apr 15, 2024 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Apr 15, 2024 · Apt 1R

    Close
  • Unsanitary condition

    Pests

    Apr 15, 2024 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Dec 15, 2023 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Dec 7, 2023 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Nov 30, 2023 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Nov 28, 2023 · Apt 2L

    Close
  • Heat/hot water

    Apartment only

    Nov 27, 2023 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Nov 13, 2023 · Apt BLDG

    Close
  • General

    Cooking gas

    Oct 17, 2023 · Apt 1L

    Close
  • Electric

    Power outage

    Oct 17, 2023 · Apt 1L

    Close
  • Unsanitary condition

    Pests

    Sep 26, 2023 · Apt 2R

    Close
  • Unsanitary condition

    Pests

    Sep 26, 2023 · Apt 2R

    Close
  • Appliance

    Refrigerator

    Sep 26, 2023 · Apt 2R

    Close
  • Appliance

    Electric/gas range

    Sep 26, 2023 · Apt 2R

    Close
  • Door/window

    Window frame

    Sep 26, 2023 · Apt 2R

    Close
  • Elevator

    Maintenance

    Sep 13, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 13, 2023 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1931
Floors
3
Residential units
6
Building area
5,400 ft²
Lot area
2,188 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3313 / 6
Assessed value
$739,350
Landmark / historic district
No

HPD registration #359435, last renewed Jul 24, 2025.

Questions about 20 Menahan Street

Who owns 20 Menahan Street?

The owner of record in NYC Department of City Planning PLUTO data is Menahan Group LLC.

Does 20 Menahan Street have violations?

Yes. NYC HPD has recorded 542 housing violations at this property.

Is 20 Menahan Street rent stabilized?

NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 83% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 20 Menahan Street built?

City records list 1931 as the year it was built.

How many apartments are in 20 Menahan Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.