roofy

72 Himrod Street

Brooklyn, NY 11221BBL 3-03275-0023Map

Owner of record: 72 Himrod Residence LLC

72 Himrod Street is a walk-up apartment building built in 2014 in Brooklyn, 11221. It has 9 residential units across 4 floors. The owner of record is 72 Himrod Residence LLC. HPD has recorded 13 housing violations here, most recently on August 31, 2026. 2 of the 13 most recent violations are still open.

HPD violations
13
DOB violations
0
ECB violations
12
HPD complaints
42

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Watch
Last violation Aug 31, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 13

  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt 4c, 4th story, 1st apartment from west at north

    Aug 31, 2026 · Apt 4C

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 4c, 4th story, 1st apartment from west at north

    Aug 31, 2026 · Apt 4C

    Open — Civ14 mailed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4b, 4th story, 1st apartment from east at south

    Aug 10, 2024 · Apt 4B

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Aug 10, 2024

    Closed — Violation closed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Aug 10, 2024

    Closed — Violation closed
  • B

    Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing at public hall, 1st story

    Aug 10, 2024

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 10, 2024

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Aug 10, 2024

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at public hall, 4th story

    Aug 10, 2024

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4b, 4th story, 1st apartment from east at south

    Aug 10, 2024 · Apt 4B

    Closed — Violation closed
Show 3 more ↓
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Aug 10, 2024

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4b, 4th story, 1st apartment from east at south

    Nov 24, 2023 · Apt 4B

    Closed — Violation dismissed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling. at public hall, 4th story

    Nov 24, 2023

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 12

  • Class - 1

    Failure to safeguard all persons & property affected by construction operations.note:@ time of my insp.construction work in progress of a 4 story residential new bldg & penthouse.i observed that bldg was approx

    Jul 19, 2014 · Penalty $2,400

    Resolve
  • Class - 1

    Failure to provide sidewalk shed where required.note:@ the time of insp.construction work in progress of 4 story residential with penthouse bldg approx.45'high & approx.10'back from sidewalk edge with & added h

    Jul 19, 2014 · Penalty $4,800

    Resolve
  • Class - 1

    No roof protection,skylight,chimney etc.note: @the time of my insp const work in progress i observed that there were inadequate protection for adjacent property @exp #2 roof & no protection provided for exp #4

    Jul 19, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to institute/maintain safety equipment measures or temp.construction-no guard rails.note:@ the time of my insp.construction work in progress.i observed that there were no guardrails provided @ stairway

    Jul 19, 2014 · Penalty $1,200

    Resolve
  • Class - 1

    Work after hours w/o a variance permit contrary to 28-105.12.5.note: @the time of my insp const work in progress upon request of variance permit for work none was provided.after research was done there were non

    Jul 19, 2014 · Penalty $800

    Resolve
  • Class - 2

    Failure to provide approved/accepted plans @job site @time of insp.note: @the time of my insp const work in progress.after review of plans i observed that there were steel members that were use as framing from

    Jul 19, 2014

    Resolve
  • Class - 1

    3301.2 adequate means of egress.note: @the time of my insp construction work in progress i observed workers working on the 4th flr of const site there were inadequate means of egress provided as worker were see

    Jul 19, 2014 · Penalty $1,600

    Resolve
  • Class - 1

    3307.2.1 temporary walkway does not meet bldg code.note: @the time of my insp const work sidewalk @exp #1,materials that were store fail to maintain sufficient width to accomodate pedestrian traffic (5 ft).widt

    Jul 19, 2014 · Penalty $400

    Resolve
  • Class - 2

    3304.3.1,failure to notify dob w/in 24 to 48 hrs of the start of excavation.noted:@ time of insp there was a full foundation on this site & no rule 52 in the system.rem:comply w/ the notice of violation.

    May 30, 2014

    Resolve
  • Class - 1

    Unlawful continued work while on notice of a stop work order.note at the time of my inspection demolition work in progress i observed two workers demolitioning a one story garage at rear of building on my pervi

    Mar 14, 2014 · Penalty $4,800

    Resolve
Show 2 more ↓
  • Class - 1

    Failure to institute/maintain safety equipment.measures or temporary constrution-no guard rails.note:at time of inspection demolition work in progress i observed that there were no guardrails provided on the la

    Mar 10, 2014 · Penalty $1,200

    Resolve
  • Class - 1

    3301.2 adequate means of egress.note:at time of inspection demolition in progress.i observed that there were no adequate means of egress of ingree at demo site, there were piled of debris that consist of lumber

    Mar 10, 2014 · Penalty $1,600

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Oct 20, 2026 · Apt 2F

    Open
  • Appliance

    Refrigerator

    Oct 20, 2026 · Apt 2F

    Open
  • Electric

    Wiring

    Oct 20, 2026 · Apt 2F

    Open
  • Appliance

    Electric/gas range

    Oct 14, 2026 · Apt APT2F

    Open
  • Door/window

    Door

    Oct 14, 2026 · Apt APT2F

    Open
  • Plumbing

    Bathtub/shower

    Oct 14, 2026 · Apt APT2F

    Open
  • Plumbing

    Bathtub/shower

    Oct 14, 2026 · Apt APT2F

    Open
  • Water leak

    Slow leak

    Aug 28, 2026 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    Aug 28, 2026 · Apt 4C

    Close
  • Door/window

    Door

    Aug 24, 2026 · Apt 4B

    Close
Show 32 more ↓
  • General

    Janitor/super

    Aug 21, 2026 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    Aug 20, 2026 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    Aug 20, 2026 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    Aug 20, 2026 · Apt 4C

    Close
  • Water leak

    Slow leak

    Aug 20, 2026 · Apt 4C

    Close
  • Heat/hot water

    Apartment only

    Apr 8, 2026 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Jan 23, 2026 · Apt 3F

    Close
  • Unsanitary condition

    Pests

    Dec 16, 2025 · Apt 1F

    Close
  • Paint/plaster

    Ceiling

    Aug 9, 2024 · Apt 4B

    Close
  • Water leak

    Heavy flow

    Aug 9, 2024 · Apt 4B

    Close
  • Water leak

    Slow leak

    Nov 27, 2023 · Apt 4B

    Close
  • Paint/plaster

    Ceiling

    Nov 27, 2023 · Apt 4B

    Close
  • Water leak

    Slow leak

    Nov 27, 2023 · Apt 4B

    Close
  • Electric

    Lighting

    Nov 27, 2023 · Apt 4B

    Close
  • Unsanitary condition

    Mold

    Nov 22, 2023 · Apt 4B

    Close
  • Water leak

    Slow leak

    Nov 22, 2023 · Apt 4B

    Close
  • Paint/plaster

    Ceiling

    Nov 22, 2023 · Apt 4B

    Close
  • Paint/plaster

    Ceiling

    Nov 22, 2023 · Apt 4B

    Close
  • Paint/plaster

    Ceiling

    Nov 22, 2023 · Apt 4B

    Close
  • Water leak

    Slow leak

    Nov 22, 2023 · Apt 4B

    Close
  • Paint/plaster

    Ceiling

    Nov 22, 2023 · Apt 4B

    Close
  • Paint/plaster

    Ceiling

    Nov 22, 2023 · Apt 4B

    Close
  • Outside building

    Roofing

    Nov 22, 2023 · Apt 4B

    Close
  • Outside building

    Gutter/leader

    Nov 22, 2023 · Apt 4B

    Close
  • Paint/plaster

    Ceiling

    Nov 22, 2023 · Apt 4B

    Close
  • Water leak

    Slow leak

    Oct 20, 2023 · Apt 4B

    Close
  • Unsanitary condition

    Mold

    Oct 20, 2023 · Apt 1B

    Close
  • Water leak

    Slow leak

    Oct 20, 2023 · Apt 3F

    Close
  • Water leak

    Slow leak

    May 20, 2023 · Apt 4B

    Close
  • Water leak

    Heavy flow

    Apr 29, 2023 · Apt 4B

    Close
  • Heat/hot water

    Entire building

    Oct 4, 2015 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 4, 2015 · Apt 4F

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
2014
Floors
4
Residential units
9
Building area
6,590 ft²
Lot area
3,000 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3275 / 23
Assessed value
$979,200
Landmark / historic district
No

HPD registration #386561, last renewed Aug 30, 2025.

Questions about 72 Himrod Street

Who owns 72 Himrod Street?

The owner of record in NYC Department of City Planning PLUTO data is 72 Himrod Residence LLC.

Does 72 Himrod Street have violations?

Yes. NYC HPD has recorded 13 housing violations at this property.

Is 72 Himrod Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 72 Himrod Street built?

City records list 2014 as the year it was built.

How many apartments are in 72 Himrod Street?

It has 9 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.