roofy

64 Himrod Street

Brooklyn, NY 11221BBL 3-03275-0020Map

Owner of record: 64 Himrod LLC

64 Himrod Street is a walk-up apartment building built in 1931 in Brooklyn, 11221. It has 6 residential units across 3 floors. The owner of record is 64 Himrod LLC. HPD has recorded 116 housing violations here, most recently on May 13, 2026.

HPD violations
116
DOB violations
17
ECB violations
1
HPD complaints
105

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 13, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 116

  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    May 13, 2026 · Apt 1R

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south

    May 13, 2026 · Apt 1R

    Closed — Violation dismissed
  • B

    Refit the door in the entrance located at apt 1r, 1st story, 1st apartment from east at south

    May 13, 2026 · Apt 1R

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system hatch locked at building front yard to cellar at boiler room

    Nov 18, 2022

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Nov 18, 2022 · Apt 3L

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of door with key operated lock preventing entrance to fire escape window at south wall in the 4th room from north at west located at apt 3l, 3rd story, 1st apartment from north at east

    Sep 29, 2022 · Apt 3L

    Closed — Violation dismissed
  • B

    Replace with new the broken or defective ventilating exhaust fan at ceiling in the kitchenette located at apt l3, 3rd story, 1st apartment from north at east

    Sep 29, 2022 · Apt L3

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west, south walls and ceiling in the kitchenette located at apt l3, 3rd story, 1st apartment from north at east

    Sep 29, 2022 · Apt L3

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 29, 2022

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 29, 2022

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective ceramic tiles at floor at public hall, 1st story

    Sep 29, 2022

    Closed — Violation dismissed
  • C

    Remove device preventing door from being self-closing removable door stopper at building front entrance at public hall, 1st story

    Sep 29, 2022

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 29, 2022

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective 5th ceramic tread from bottom at stoop at building front entrance, 1st story

    Sep 29, 2022

    Closed — Violation dismissed
  • A

    Paint or post a sign indicating floors at all stories at public hall

    Sep 22, 2022

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 22, 2022

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 22, 2022

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east

    Mar 25, 2022 · Apt 3L

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglazing in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east

    Mar 25, 2022 · Apt 3L

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration stair erected providing access to illegal room above in the 1st room from north located at apt 3l, 3rd story, 1st apartment from north at east

    Mar 25, 2022 · Apt 3L

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the max temperature of 130 degrees at all hot water fixtures in entire apartment in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Feb 9, 2022 · Apt 3L

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Feb 7, 2022

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Feb 7, 2022 · Apt 3L

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum temperture of 130 degrees at all hot water fixtures in entire apartment in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Feb 7, 2022 · Apt 3L

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of extremly hot water with a temperature of 150f exceeding the recommended temperature of 130f. in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north

    Feb 2, 2022 · Apt 3L

    Closed — Violation closed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of bucket and potted plant at balcony at south exterior wall at fire escape, 2nd story

    Jan 27, 2022

    Closed — Violation dismissed
  • B

    Replace with new the missing knob and latch assembly at entrance door at upper level in the 1st room from north at west located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 27, 2022 · Apt 3L

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood door of wall cabinet at south in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 27, 2022 · Apt 3L

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 4th room from north at west located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 27, 2022 · Apt 3L

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective glaze enamel at bathtub in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 27, 2022 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north at east located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 27, 2022 · Apt 3L

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of key operated lock at interior of entrance door at upper level in the 1st room from north at west located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 27, 2022 · Apt 3L

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from north located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 27, 2022 · Apt 3L

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective pop-up assembly at wash basin waste pipe in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 27, 2022 · Apt 3L

    Closed — Violation dismissed
  • A

    Refit at entrance door at upper level in the 1st room from north at west located at apt 3l, 3rd story, 1st apartment from north at east

    Jan 27, 2022 · Apt 3L

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of lockable door lock leading to fire escape window in the 4th room from north at west located at apt 3l, 3rd story, 1st apartment from north at east

    Dec 28, 2021 · Apt 3L

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximun allowable temperature of 130 degrees. in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Dec 28, 2021 · Apt 3L

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of lockable door lock leading to fire escape window in the 4th room from north at west located at apt 3l, 3rd story, 1st apartment from north at east

    Dec 13, 2021 · Apt 3L

    Closed — Violation dismissed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration high ceiling erected to create additional room above north 1 room (apartment front) creating ceiling and subfloor. in the 1st room from north located at apt 3l, 3rd story, 1st apartment from north at east

    Dec 13, 2021 · Apt 3L

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximun allowable temperature of 130 degrees. in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Dec 13, 2021 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north at west located at apt 3l, 3rd story, 1st apartment from north at east

    Dec 13, 2021 · Apt 3L

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east

    Dec 13, 2021 · Apt 3L

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... approx 1 sq ft at ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east

    Dec 13, 2021 · Apt 3L

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3l, 3rd story, 1st apartment from north at east

    Dec 13, 2021 · Apt 3L

    Closed — Violation closed
  • B

    M/d law abate the nuisance consisting of keyoperated lock installed on door leading to fire escape window in the 4th room from north at west located at apt 3l, 3rd story, 1st apartment from north at east

    Nov 23, 2021 · Apt 3L

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Nov 23, 2021

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Nov 23, 2021 · Apt 3L

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Nov 23, 2021

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system boiler room door locked at cellar

    Nov 23, 2021

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximun allowable temperature of 130 degrees. at all fixtures in the entire apartment located at apt 3l, 3rd story, 1st apartment from north at east

    Nov 23, 2021 · Apt 3L

    Closed — Violation dismissed

DOB building violations · 17

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
Show 7 more ↓
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 16, 1993

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 1, 1993

    Dob violation - dismissed

ECB violations · 1

  • Class - 2

    Work does not conform to approved construction documents &/or approved amendments doe alt ii application#310142315 non conforming work noted @ 3rd flr level plans show storage areas above rear bedroom now stora

    Sep 7, 2010 · Penalty $500

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Dec 10, 2025 · Apt 1R

    Close
  • Heat/hot water

    Apartment only

    Jun 6, 2025 · Apt 3R

    Close
  • Door/window

    Window frame

    Mar 7, 2023 · Apt 3L

    Close
  • Plumbing

    Water supply

    Mar 7, 2023 · Apt 3L

    Close
  • Electric

    Wiring

    Jan 15, 2023 · Apt 1R

    Close
  • Plumbing

    Toilet

    Jan 2, 2023 · Apt 3L

    Close
  • Plumbing

    Toilet

    Jan 2, 2023 · Apt 3L

    Close
  • Appliance

    Electric/gas range

    Jan 2, 2023 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Nov 18, 2022 · Apt 3L

    Close
  • Heat/hot water

    Entire building

    Nov 14, 2022 · Apt 3L

    Close
Show 40 more ↓
  • General

    Ventilation system

    Nov 14, 2022 · Apt 3L

    Close
  • Appliance

    Electric/gas range

    Mar 21, 2022 · Apt 3L

    Close
  • Door/window

    Door

    Mar 21, 2022 · Apt 3L

    Close
  • General

    Cabinet

    Mar 21, 2022 · Apt 3L

    Close
  • Plumbing

    Basin/sink

    Mar 21, 2022 · Apt 3L

    Close
  • Plumbing

    Bathtub/shower

    Mar 21, 2022 · Apt 3L

    Close
  • General

    Ventilation system

    Mar 21, 2022 · Apt 3L

    Close
  • Plumbing

    Radiator

    Mar 21, 2022 · Apt 3L

    Close
  • Unsanitary condition

    Mold

    Mar 21, 2022 · Apt 3L

    Close
  • Plumbing

    Water supply

    Mar 9, 2022 · Apt 3L

    Close
  • Plumbing

    Water supply

    Feb 5, 2022 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Feb 5, 2022 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Feb 3, 2022 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2022 · Apt 3L

    Close
  • General

    Ventilation system

    Jan 21, 2022 · Apt 3L

    Close
  • Unsanitary condition

    Mold

    Jan 21, 2022 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Jan 21, 2022 · Apt 3L

    Close
  • Plumbing

    Basin/sink

    Jan 21, 2022 · Apt 3L

    Close
  • General

    Cabinet

    Jan 21, 2022 · Apt 3L

    Close
  • Appliance

    Electric/gas range

    Jan 21, 2022 · Apt 3L

    Close
  • Door/window

    Door

    Jan 21, 2022 · Apt 3L

    Close
  • Plumbing

    Radiator

    Jan 21, 2022 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Dec 11, 2021 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Dec 3, 2021 · Apt 3L

    Close
  • General

    Bell/buzzer/intercom

    Nov 15, 2021 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Nov 15, 2021 · Apt 3L

    Close
  • Water leak

    Heavy flow

    Oct 26, 2021 · Apt 3L

    Close
  • General

    Mailbox

    Oct 26, 2021 · Apt 3L

    Close
  • Water leak

    Heavy flow

    Oct 26, 2021 · Apt 3L

    Close
  • General

    Bell/buzzer/intercom

    Oct 26, 2021 · Apt 3L

    Close
  • Safety

    Fire escape

    Oct 26, 2021 · Apt 3L

    Close
  • Appliance

    Electric/gas range

    Oct 26, 2021 · Apt 3L

    Close
  • Paint/plaster

    Wall

    Oct 26, 2021 · Apt 3L

    Close
  • Door/window

    Door

    Oct 26, 2021 · Apt 3L

    Close
  • General

    Ventilation system

    Oct 26, 2021 · Apt 3L

    Close
  • Plumbing

    Basin/sink

    Oct 26, 2021 · Apt 3L

    Close
  • Electric

    Lighting

    Oct 26, 2021 · Apt 3L

    Close
  • Paint/plaster

    Ceiling

    Oct 26, 2021 · Apt 3L

    Close
  • Plumbing

    Basin/sink

    Oct 26, 2021 · Apt 3L

    Close
  • Heat/hot water

    Apartment only

    Oct 26, 2021 · Apt 3L

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1931
Floors
3
Residential units
6
Building area
4,345 ft²
Lot area
2,633 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3275 / 20
Assessed value
$665,100
Landmark / historic district
No

HPD registration #321634, last renewed Aug 27, 2025.

Questions about 64 Himrod Street

Who owns 64 Himrod Street?

The owner of record in NYC Department of City Planning PLUTO data is 64 Himrod LLC.

Does 64 Himrod Street have violations?

Yes. NYC HPD has recorded 116 housing violations at this property.

Is 64 Himrod Street rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 64 Himrod Street built?

City records list 1931 as the year it was built.

How many apartments are in 64 Himrod Street?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.