1355 Myrtle Avenue
Brooklyn, NY 11221BBL 3-03256-0001Map
Owner of record: 1355 Myrtle LLC
1355 Myrtle Avenue is a walk-up apartment building built in 2014 in Brooklyn, 11221. It has 8 residential units across 4 floors. The owner of record is 1355 Myrtle LLC. HPD has recorded 40 housing violations here, most recently on May 11, 2025. 4 of the 40 most recent violations are still open.
- HPD violations
- 40
- DOB violations
- 7
- ECB violations
- 7
- HPD complaints
- 24
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 40
- ANon-hazardous
Replace with new the missing electrical outlet cover at west wall at public hall, 2nd story
May 11, 2025
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnatic locking device installed at the building front entrance door , 1st story
Feb 14, 2023
Open — Not complied with - CImmediately hazardous
Provide security in the event of a power outage by mean of an acceptable mechanical heavy duty lock and latch set at building front entrance door , 1st story
Feb 14, 2023
Open — Not complied with - BHazardous
M/d law abate the nuisance consisting of wood panels at west wall at public hall, 1st story
Jul 25, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at public hall stairs, 2nd story
Jul 18, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Jun 13, 2021 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar
Jun 13, 2021
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor at public hall, 1st story
Apr 12, 2021
Closed — Violation dismissed - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy-duty lock and latch set at the building entrance door at public hall, 1st story
Apr 12, 2021
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 3l, 3rd story, 1st apartment from south at west
Apr 12, 2021 · Apt 3L
Closed — Violation dismissed
Show 30 more ↓
- BHazardous
Repair or replace the smoke detector missing located at apt 3l, 3rd story, 1st apartment from south at west
Apr 12, 2021 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 3l, 3rd story, 1st apartment from south at west
Apr 12, 2021 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at the building entrance door at public hall, 1st story
Apr 12, 2021
Open — Not complied with - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 6, 2019
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective warped wood floor in the kitchen located at apt 2b, 2nd story, apartment at north
Jun 13, 2018 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Feb 19, 2017 · Apt 1R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Feb 19, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Feb 19, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Feb 19, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from east at south
Feb 19, 2017 · Apt 1R
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Jan 3, 2017 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective building entrance door glass panel, , 1st story
Jan 3, 2017
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 30, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 29, 2016
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 2b, 2nd story, apartment at north
Nov 6, 2016 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 6, 2016
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing on wall at public hall, 1st story
Nov 6, 2016
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box sign missing at public hall, 1st story
Nov 6, 2016
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Nov 6, 2016
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Nov 6, 2016
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor at entrance to in the 1st room from north at east located at apt 2b, 2nd story, apartment at north
Nov 6, 2016 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 6, 2016
Closed — Violation closed - BHazardous
Abate the nuisance consisting of roaches located at apt 2b, 2nd story, 1st apartment from west at north
Oct 1, 2016 · Apt 2B
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste pipe at sink in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north
Oct 1, 2016 · Apt 2B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the 1st room from north at east located at apt ib, 1st story, 1st apartment from west at north
Sep 22, 2016 · Apt IB
Closed — Violation dismissed - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt ib, 1st story, 1st apartment from west at north
Sep 22, 2016 · Apt IB
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the nuisance consisting of mold ... approximately 1 square foot on the base board at north, at north east cellar
Sep 22, 2016
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the base board at north, at north east cellar
Sep 22, 2016
Closed — Violation dismissed - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections (sleeping at south east cellar)
Sep 22, 2016
Open — First no access to re- inspect violation
DOB building violations · 7
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 29, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 29, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 29, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 22, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 22, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 22, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 22, 2015
Dob violation - dismissed
ECB violations · 7
- Class - 1
Work does not conform to approved construction documents and or approved amendments.noted:@ time of insp.of 4 story new bldg with the height of 35'has sidealk shed plan under permit #340236033-01-eq-sh structur
Apr 30, 2015 · Penalty $1,000
Resolve - Class - 1
Failure to provide sidewalk shed where required.@ time of insp.inspection of 4 story bldg under construction has sidewalk shed not constructive to the lotline and part 5'creating a fall stike situation for publ
Apr 30, 2015 · Penalty $4,800
Resolve - Class - 1
No protection for roof sky light,chimney etc.noted:@ time of insp.of 4 story new bldg under construction has no roof protection for adj.property roof top.141 (standhope st)with new bldg not enclosed and frammi
Apr 30, 2015
Resolve - Class - 2
3307.7 construction site is not enclosed as per code.large sections ofrequired 9'solid fence has not been erected at rear of site.there is also a section fence missing directly adj to 141 stanhope st fron porch
Jan 31, 2015
Resolve - Class - 1
Failure to provide required guard railing where needed. guard railing has not been erected/provided for foundation walls at grade level throughout site. rmdy: erect/provide required guard railing.
Jan 31, 2015
Resolve - Non-hazardous
Failure to remove glass. upon insp. active demo site, partial bldg has been demo before removal of glass as per code. remedy: stop all work, except to remove glass, call best squad for reinspection 212-669-7043
Feb 22, 2006 · Penalty $500
Resolve - Non-hazardous
Failure to safeguard public & property effected by demo operations. upon insp., active demo site, demo in progress, no fence has been provided around demo site to safeguard public from demo site causing hazardo
Feb 22, 2006 · Penalty $1,500
Resolve
Complaints
- Unsanitary condition
Mold
Oct 5, 2026 · Apt 1R
Close - Heat/hot water
Apartment only
Jun 11, 2021 · Apt 1R
Close - General
Ventilation system
Apr 5, 2021 · Apt 3L
Close - Unsanitary condition
Mold
Apr 5, 2021 · Apt 3L
Close - Door/window
Door
Oct 3, 2018 · Apt 2R
Close - Door/window
Door
Oct 3, 2018 · Apt 2R
Close - Door/window
Door
Sep 25, 2018 · Apt 2R
Close - Door/window
Door
Sep 25, 2018 · Apt 2R
Close - Door/window
Door
Sep 25, 2018 · Apt 2R
Close - Door/window
Door
Sep 25, 2018 · Apt 2R
Close
Show 14 more ↓
- Paint/plaster
Ceiling
Feb 8, 2017 · Apt 1R
Close - Paint/plaster
Wall
Feb 8, 2017 · Apt 1R
Close - Paint/plaster
Ceiling
Feb 8, 2017 · Apt 1R
Close - Water leak
Damp spot
Feb 8, 2017 · Apt 1R
Close - Door/window
Door
Feb 8, 2017 · Apt 1R
Close - Unsanitary condition
Mold
Feb 8, 2017 · Apt 1R
Close - Flooring/stairs
Floor
Feb 8, 2017 · Apt 1R
Close - Heat/hot water
Apartment only
Dec 30, 2016 · Apt 4R
Close - Electric
No lighting
Dec 22, 2016 · Apt 4R
Close - Heat/hot water
Apartment only
Dec 22, 2016 · Apt 4R
Close - General
Janitor/super
Dec 22, 2016 · Apt 4R
Close - Heat/hot water
Apartment only
Dec 16, 2016 · Apt 4R
Close - Heat/hot water
Apartment only
Dec 4, 2016 · Apt 4R
Close - Heat/hot water
Apartment only
Oct 18, 2016 · Apt 4R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2014
- Floors
- 4
- Residential units
- 8
- Building area
- 5,391 ft²
- Lot area
- 5,486 ft²
- Zoning
- R6
- Community board
- 304
- Council district
- 37
- Block / lot
- 3256 / 1
- Assessed value
- $801,000
- Landmark / historic district
- No
HPD registration #386504, last renewed Aug 15, 2025.
Questions about 1355 Myrtle Avenue
Who owns 1355 Myrtle Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1355 Myrtle LLC.
Does 1355 Myrtle Avenue have violations?
Yes. NYC HPD has recorded 40 housing violations at this property.
Is 1355 Myrtle Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 1355 Myrtle Avenue built?
City records list 2014 as the year it was built.
How many apartments are in 1355 Myrtle Avenue?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.