roofy

1353 Myrtle Avenue

Brooklyn, NY 11221BBL 3-03256-0005Map

Owner of record: Myrtle Management Realty LLC

1353 Myrtle Avenue is a walk-up apartment building built in 1920 in Brooklyn, 11221. It has 6 residential units across 4 floors. The owner of record is Myrtle Management Realty LLC. HPD has recorded 52 housing violations here, most recently on September 9, 2026. 47 of the 50 most recent violations are still open.

HPD violations
52
DOB violations
18
ECB violations
13
HPD complaints
71

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 9, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 52

  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 9, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Sep 9, 2026

    Open — Nov sent out
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system signage missing at public hall, 1st story

    Sep 9, 2026

    Open — Nov sent out
  • B

    Abate the nuisance consisting of pests. evidence of sewer fly's at public hall

    Sep 9, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north

    Sep 9, 2026 · Apt 1B

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north

    Sep 9, 2026 · Apt 1B

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 50 sq ft aggregate observed at ceiling at public hall

    Sep 9, 2026

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall at public hall

    Sep 9, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at signage missing at public hall, 1st story

    Sep 9, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 9, 2026

    Open — Nov sent out
Show 40 more ↓
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings signage missing

    Sep 9, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox signage missing at public hall, 1st story

    Sep 9, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice at public hall

    Sep 9, 2026

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing

    Jun 15, 2026

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall

    Jun 15, 2026

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall

    Jun 15, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall

    Jun 15, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Jun 15, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story

    Jun 15, 2026

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling at cellar

    Jun 15, 2026

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling at cellar original violation 19008140 issued 15-jun-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Jun 15, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt b, 1st story, 1st apartment from west at north

    Jan 19, 2026 · Apt B

    Open — Nov sent out
  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Jan 19, 2026

    Open — Nov sent out
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration floor breeched, stair installed from 1st story apartment to cellar in the entire apartment located at apt b, 1st story, 1st apartment from north at east

    Feb 2, 2024 · Apt B

    Open — Nov sent out
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections for watercloset and wash basin in the entire apartment located at apt b, 1st story, 1st apartment from north at east

    Feb 2, 2024 · Apt B

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective at public hall stairs, 2nd story

    Sep 26, 2022

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 26, 2022

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Sep 26, 2022

    Open — Nov sent out
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Sep 26, 2022

    Open — Nov sent out
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Sep 26, 2022

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 26, 2022

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 26, 2022

    Open — Nov sent out
  • B

    Abate the infestation consisting of roaches in the entire apartment located at apt b, 1st story, 1st apartment from south at west

    Oct 9, 2021 · Apt B

    Open — Nov sent out
  • B

    Abate the infestation consisting of mice in the entire apartment located at apt b, 1st story, 1st apartment from south at west

    Oct 9, 2021 · Apt B

    Open — Nov sent out
  • C

    Provide seal-up for all accessible openings at all stories at bldg 6 windows at rear of buildingand 1 door at building front

    Dec 21, 2013

    Closed — Violation closed
  • B

    Abate the nuisance consisting of bedbugs in the entire apartment located at apt 3l, 3rd story, 1st apartment from east at south

    Jun 21, 2011 · Apt 3L

    Open — Nov sent out
  • B

    Properly repair the broken or defective window balance lower sash in the kitchen located at apt 3l, 3rd story, 1st apartment from east at south

    Jun 21, 2011 · Apt 3L

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3l, 3rd story

    Jun 21, 2011 · Apt 3L

    Open — Nov sent out
  • C

    Abate the nuisnace consisting of rodents rats at cellar

    Mar 17, 2002

    Open — Nov sent out
  • B

    Properly secure the loose electric outlet at ceiling south , cellar

    Mar 17, 2002

    Open — Nov sent out
  • C

    Repair the leaky and/or defective water supply pipe 2 inches at ceiling south west , cellar

    Mar 17, 2002

    Open — Nov sent out
  • B

    Properly repair the broken or defective bell system in the entrance located at apt 1, 2nd story

    Mar 5, 2002 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the broken or defective ceiling light fixture in the 1st bedroom from north at west located at apt 1, 1st story

    Mar 4, 2002 · Apt 1

    Open — Nov sent out
  • B

    Properly repair the broken or defective upper and lower window sashes west room in the 1st bedroom from east located at apt 1, 1st story

    Mar 4, 2002 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st bedroom 2 from east at south located at apt 1, 1st story

    Mar 4, 2002 · Apt 1

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st bedroom from east located at apt 1, 1st story

    Mar 4, 2002 · Apt 1

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin mice and roaches in the entire apartment located at apt 1, 1st story

    Mar 4, 2002 · Apt 1

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st bedroom 3 from east at south located at apt 1, 1st story

    Mar 4, 2002 · Apt 1

    Open — Nov sent out
  • B

    Replace with new the broken or defective lower window glass in the 1st bedroom from north at west located at apt 1, 1st story

    Mar 4, 2002 · Apt 1

    Open — Nov sent out

DOB building violations · 18

  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - dismissed
  • Construction other optional

    Boro commissioner has ordered all work(plumbing)stopped under permit# 320957112 on 12/01/17 because plumbing contractor withdrawal from project. stop all plumbing work and make site safe remedy: stop all work plumbing work & make site safe. contact the borough commissioner office at 718-802-3677

    Dec 7, 2017

    Dob violation - dismissed
  • Construction other optional

    Stop all work immediately, make the site safe only, contact borough ommissioner's office at 718 802-3677 for information

    Nov 30, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2014 inspection report

    Oct 1, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
Show 8 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 12, 2014

    Dob violation - dismissed
  • Construction other optional

    Severely deteriorated&temporarily shored bldg is leaning towards exp#4 by about 8",has missing wall & ceiling finishes thruout,missing brick nogging @ ext walls,partially collapsed fls & possible pre fire damage owner to obtain permit & repair/replace bldg. start work no later than 3/7/14

    Feb 27, 2014

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Imegncy-immediate emergency anythingoptional

    Dec 23, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 17, 2012

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed

ECB violations · 13

  • Class - 1

    At time of inspection at apt. b: observed cellar is aranged and occupied as bedroom with bed,dresser, walrobe, clothes & personal items for sleeping. c/o #320957112f clearly states electric & gas meter room, la

    Mar 14, 2024 · Penalty $2,500

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by c of o and/or the department of buildings records. floor breeched with stair lead fron the 1 story to cellar. creating an illegal duplex apt. in conjunction with apt. 1 fir

    Feb 2, 2024 · Penalty $1,250

    Resolve
  • Class - 2

    As per class 2 (b265) 28-303.7 failrue to file a complete boiler in spection report as per dob records. submit a current b09 report.

    May 22, 2017 · Penalty $500

    Resolve
  • Class - 1

    Sec. 3501.4.2 failure to post & provide a cert of fitness for handling& use of g&g containers: note at the time of inspection a space heaterwas observed connected to 2 propane gas cylinders on the ground floor

    Jan 30, 2017

    Resolve
  • Class - 2

    Failure to provide approved plans @ job site @ time of insp.observed workers on site partial demo in progress.no approved plans on site.rem:top all work provide approved plans call b.e.s.t squad for reinspectio

    Mar 31, 2014

    Resolve
  • Class - 1

    Failure to comply w/an order of the commissioner for dob violation #022714feu30401ps,with control #275095, which indicates severely deteriorated and temporarily shored building is leaning towards exposure #4 by

    Mar 13, 2014 · Penalty $12,000

    Resolve
  • Class - 1

    Failure to maintain bldg in a code-compliant manner. the bldg is gutted at the 2nd and 3rd flrs. it is in a state of complete disrepair. thebeams in the cellar has been temporary shored but shoring isinadequate

    Dec 21, 2013 · Penalty $5,000

    Resolve
  • Class - 1

    Failure to comply w/an order of the commissioner. noted: rear 2 sty extension occupied contrary to vac 268-10. remedy: comply w/vacate immediately.

    Apr 8, 2013 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to comply w/the commissioner's order to file a certificate of correction with the dept of buildings. noted: respondent failed to comply w/the commissioner's order to correct the violating conditions and

    May 3, 2011 · Penalty $2,000

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner by failing to provide required second means of egress for rooms or space where required: illegal rear extension is occupied as single rooms and/or apts. 4 s

    Jul 12, 2010 · Penalty $1,000

    Resolve
Show 3 more ↓
  • Class - 1

    Failure to correct condditions cited in nov34776116l for work done w/oa permit (extension 20'x25x15'etc)rem:correct conditions cited

    Mar 16, 2010

    Resolve
  • Class - 1

    Failure to comply w/the commissioner's order to obtain a permit per vecb # 34776116l issued on 4/17/09 for work w/o permit at rear of bldg erected a one story extension 20' x 25' s 15' high of bldg erected a

    Oct 9, 2009

    Resolve
  • Class - 1

    Work w/o a permit:work noted:construction a 1 story rear extension approx. 20'wx25'd 15'high at rear,erected partitions creating (5)rooms installed water & waste lines.for (2) 3pc baths,2sinks,2toilets,2shower

    Apr 17, 2009

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Oct 15, 2026 · Apt E

    Close
  • Unsanitary condition

    Pests

    Jul 3, 2026 · Apt 1B

    Close
  • Plumbing

    Water supply

    Jun 25, 2026 · Apt C

    Close
  • Plumbing

    Water supply

    Jun 19, 2026 · Apt C

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 14, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jun 13, 2026 · Apt C

    Close
  • Heat/hot water

    Apartment only

    Jan 17, 2026 · Apt B

    Close
  • Water leak

    Heavy flow

    Jan 17, 2026 · Apt B

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2024 · Apt B

    Close
  • Safety

    Smoke detector

    Jan 21, 2024 · Apt B

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Jan 21, 2024 · Apt B

    Close
  • Appliance

    Electric/gas range

    Oct 31, 2022 · Apt C

    Close
  • Appliance

    Electric/gas range

    Oct 31, 2022 · Apt C

    Close
  • Paint/plaster

    Wall

    Oct 31, 2022 · Apt C

    Close
  • Water leak

    Slow leak

    Oct 31, 2022 · Apt C

    Close
  • Electric

    Outlet/switch

    Oct 31, 2022 · Apt C

    Close
  • Paint/plaster

    Wall

    Sep 23, 2022 · Apt C

    Close
  • Paint/plaster

    Wall

    Sep 23, 2022 · Apt C

    Close
  • Unsanitary condition

    Mold

    Sep 23, 2022 · Apt C

    Close
  • Water leak

    Slow leak

    Sep 23, 2022 · Apt C

    Close
  • Paint/plaster

    Window/frame

    Sep 23, 2022 · Apt C

    Close
  • Door/window

    Door

    Mar 14, 2022 · Apt E

    Close
  • Plumbing

    Basin/sink

    Mar 14, 2022 · Apt E

    Close
  • Door/window

    Window frame

    Dec 16, 2021 · Apt E

    Close
  • Door/window

    Door

    Dec 16, 2021 · Apt E

    Close
  • Door/window

    Door

    Dec 16, 2021 · Apt E

    Close
  • Unsanitary condition

    Mold

    Oct 6, 2021 · Apt B

    Close
  • Unsanitary condition

    Pests

    Oct 6, 2021 · Apt B

    Close
  • Water leak

    Slow leak

    Sep 4, 2021 · Apt B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 2, 2020 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 21, 2020 · Apt BLDG

    Close
  • Plumbing

    Toilet

    Jun 24, 2020 · Apt E

    Close
  • Water leak

    Slow leak

    Jun 24, 2020 · Apt E

    Close
  • Heat/hot water

    Apartment only

    Feb 6, 2019 · Apt E

    Close
  • Heat/hot water

    Apartment only

    Feb 4, 2019 · Apt E

    Close
  • Heat/hot water

    Apartment only

    Feb 3, 2019 · Apt E

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2019 · Apt E

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2019 · Apt E

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2019 · Apt E

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2019 · Apt E

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2018 · Apt E

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2018 · Apt APTE

    Close
  • Heat/hot water

    Apartment only

    Nov 15, 2018 · Apt E

    Close
  • Safety

    Carbon monoxide detector

    Jul 23, 2015 · Apt 1R

    Close
  • Plumbing

    Water supply

    Dec 21, 2013 · Apt 2

    Close
  • General

    Cooking gas

    Dec 21, 2013 · Apt 2

    Close
  • Electric

    Electric-supply

    Dec 21, 2013 · Apt 2

    Close
  • Heating

    Heat related

    Dec 18, 2013 · Apt RSTO

    Close
  • General

    Floor

    Apr 10, 2013 · Apt 3RD

    Close
  • Paint/plaster

    Wall

    Apr 10, 2013 · Apt 3RD

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C2)
Year built
1920
Floors
4
Residential units
6
Building area
4,205 ft²
Lot area
2,075 ft²
Zoning
R6
Community board
304
Council district
37
Block / lot
3256 / 5
Assessed value
$535,500
Landmark / historic district
No

Questions about 1353 Myrtle Avenue

Who owns 1353 Myrtle Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Myrtle Management Realty LLC.

Does 1353 Myrtle Avenue have violations?

Yes. NYC HPD has recorded 52 housing violations at this property.

Is 1353 Myrtle Avenue rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 1353 Myrtle Avenue built?

City records list 1920 as the year it was built.

How many apartments are in 1353 Myrtle Avenue?

It has 6 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.