828 Metropolitan Avenue
Brooklyn, NY 11211BBL 3-02916-0014Map
Owner of record: Upton Metropolitan, LLC
828 Metropolitan Avenue is an elevator apartment building built in 2024 in Brooklyn, 11211. It has 136 residential units across 9 floors. The owner of record is Upton Metropolitan, LLC. HPD has recorded 11 housing violations here, most recently on May 9, 2026. City tax records listed 126 rent-stabilized apartments here in 2024.
- HPD violations
- 11
- DOB violations
- 0
- ECB violations
- 16
- HPD complaints
- 22
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 11
- BHazardous
Properly repair or replace the broken or defective mortise lock at building front entrance door , 1st story
May 9, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
May 9, 2026
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 9i, 9th story, 1st apartment from south at west
Sep 2, 2025 · Apt 9I
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the bathroom located at apt 9i, 9th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9I
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 9i, 9th story, 1st apartment from south at west
Aug 29, 2025 · Apt 9I
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening electromagnetic locking device at building entrance door at public hall, 1st story
Aug 27, 2025
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq feet at ceiling in the bathroom located at apt 9i, 9th story, 1st apartment from south at west original violation 18190098 issued 27-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Aug 27, 2025 · Apt 9I
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq feet at ceiling in the bathroom located at apt 9i, 9th story, 1st apartment from south at west
Aug 27, 2025 · Apt 9I
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 9i, 9th story, 1st apartment from south at west
Aug 27, 2025 · Apt 9I
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6j, 6th story, 5th apartment from east at south
Jun 23, 2025 · Apt 6J
Closed — Violation closed
Show 1 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 16
- Class - 2
Misaligned cab mirror. replace worn gibs where needed. provide explicitly detailed info on how/where to obtain keys to machine room. top and bottom landings are illegal vestibules with no alternate means of egr
Jan 23, 2026
Resolve - Class - 2
Misaligned cab mirror. replace worn gibs where needed. provide explicitly detailed info on how/where to obtain keys to machine room. top landing is an illegal vestibule with no alternate means of egress; make a
Jan 23, 2026
Resolve - Class - 2
Misaligned cab mirror. replace worn gibs where needed. provide explicitly detailed info on how/where to obtain keys to machine room. top landing is an illegal vestibule with no alternate means of egress; make a
Jan 23, 2026 · Penalty $625
Resolve - Class - 1
At time of inspection observed workers at exp.1 1st floor engaged in tiling operations in the elevator area without an after hours variance permit. pswo issued for all afterhours work, obtain after hours varian
May 30, 2024
Resolve - Class - 1
Bc3314.4 supp scaff not as per code.pipe scaff at multiple locations on balconies not as per code, scaff missing tie in to structure while workers tied to scaffold frames, missing debris netting, working level
Mar 4, 2024 · Penalty $5,000
Resolve - Class - 2
Bc 3301.1.1 responsibility for safety. observed two workers working by leading edge and both workers using the same anchorage connector to connect fall arrest system ( harness). this condition pose hazard for a
Mar 4, 2024
Resolve - Class - 2
Observed excessive debris at multiple location thru the site. debris consisting of sheetrock, garbage bags, wood, and other debris and materials, this condition pose tripping hazard, fire hazard and rodent infe
Mar 4, 2024 · Penalty $1,250
Resolve - Class - 1
Bc 3301.1.1- responsibility for safety. observed 9 str nb, topped off, with active work at the leading edges and w/multiple workers walking and/or standing within 6ft of an enclosed perimeter/leading edge, w/ou
Feb 12, 2024 · Penalty $5,000
Resolve - Class - 1
Bc 3314.1. 3 c-hk susp scaf, 1 in use, at exp#3, over adj prop rf. 1 parapet clamp (pc) for pltfm tie-back (tb) cracked&bent, lifeline (ll) & tb lines overlapped, all shackles at pcs & c-hks w/no safety tie, 1
Feb 12, 2024 · Penalty $5,000
Resolve - Class - 2
No en drawing, com/check and architectural drawing approved from dob provided at job site during time of inspection., maintain/display required documents; please go to https://www1.nyc.gov/site/buildings/codes/
Jan 23, 2024 · Penalty $1,250
Resolve
Show 6 more ↓
- Class - 1
Support of excavation. at active 9 story nb site in excavation phase zobserved unsafe excavation for lagging install operation where shear cut over 5 street(approx. 7ft at metropolitan ave . and approx. 6ft nex
Sep 19, 2023 · Penalty $2,500
Resolve - Class - 2
At the time of inspection, observed installed construction fence covered with graffiti and advertisement bills. g.c failed to maintain construction fence in code compliance manner.
May 22, 2023
Resolve - Class - 2
At the time of inspection observed installed temporary sidewalk on roadway of exposure 1. the temporary sidewalk width was not complying to the minimum 5 feet code requirement as per 3307.2.6.
May 22, 2023 · Penalty $2,400
Resolve - Class - 2
At time of my inspection of construction job site, i observed construction fence installed under permit# b00789784-i1-fn, not maintained as per building code, i observed a lot of graffiti, loose/flapping poste
Dec 28, 2022
Resolve - Class - 1
At time of inspection observed a big pile of combustible debris, more than 60 yards approximately; creating a potential fire safety hazardous conditions for adjacent occupied building at expo# 2.
Nov 19, 2022 · Penalty $2,500
Resolve - Class - 2
Work without a permit; noted observed temporary construction fence was erected and part of it is encroaching the entire sidewalk. no active permit on file. dm application # 322103077 was signed off on 05-13-22,
Jun 30, 2022
Resolve
Complaints
- Door/window
Door
Aug 31, 2026 · Apt 5A
Close - General
Ventilation system
Mar 4, 2026 · Apt 7P
Close - Electric
Wiring
Feb 23, 2026 · Apt 5A
Close - Door/window
Door
Feb 1, 2026 · Apt 9B
Close - Door/window
Door
Jan 6, 2026 · Apt 9G
Close - Unsanitary condition
Mold
Aug 28, 2025 · Apt 9I
Close - Unsanitary condition
Mold
Aug 27, 2025 · Apt 9I
Close - Water leak
Heavy flow
Aug 27, 2025 · Apt 9I
Close - Paint/plaster
Ceiling
Aug 27, 2025 · Apt 9I
Close - Unsanitary condition
Mold
Aug 24, 2025 · Apt 9I
Close
Show 12 more ↓
- Unsanitary condition
Mold
Jul 15, 2025 · Apt 9E
Close - General
Ventilation system
Jul 15, 2025 · Apt 9E
Close - Water leak
Heavy flow
Jul 15, 2025 · Apt 9E
Close - Water leak
Slow leak
Jul 6, 2025 · Apt 9E
Close - General
Ventilation system
Jul 6, 2025 · Apt 9E
Close - Heat/hot water
Entire building
Jun 22, 2025 · Apt 6J
Close - Paint/plaster
Ceiling
Dec 28, 2016 · Apt CELLA
Close - Plumbing
Radiator
Dec 13, 2016 · Apt BSMNT
Close - Door/window
Window frame
Dec 13, 2016 · Apt BSMNT
Close - Water leak
Heavy flow
May 3, 2016 · Apt 3
Close - General
Cooking gas
May 15, 2013 · Apt 2
Close - General
Mailbox
May 15, 2013 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2024
- Floors
- 9
- Residential units
- 136
- Building area
- 147,728 ft²
- Lot area
- 23,129 ft²
- Zoning
- R7A
- Community board
- 301
- Council district
- 34
- Block / lot
- 2916 / 14
- Assessed value
- $22,162,050
- Landmark / historic district
- No
HPD registration #391306, last renewed Jul 15, 2025.
Questions about 828 Metropolitan Avenue
Who owns 828 Metropolitan Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Upton Metropolitan, LLC.
Does 828 Metropolitan Avenue have violations?
Yes. NYC HPD has recorded 11 housing violations at this property.
Is 828 Metropolitan Avenue rent stabilized?
NYC Department of Finance tax bills listed 126 rent-stabilized units here in 2024 (about 93% of its 136 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 828 Metropolitan Avenue built?
City records list 2024 as the year it was built.
How many apartments are in 828 Metropolitan Avenue?
It has 136 residential units and 137 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.