roofy

195 Driggs Avenue

Brooklyn, NY 11222BBL 3-02700-0018Map

Owner of record: Driggs Ave Limited Li

195 Driggs Avenue is a walk-up apartment building built in 1905 in Brooklyn, 11222. It has 20 residential units across 5 floors. The owner of record is Driggs Ave Limited Li. HPD has recorded 51 housing violations here, most recently on October 1, 2019. 23 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.

HPD violations
51
DOB violations
1
ECB violations
1
HPD complaints
66

What to know

Concern
6 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Oct 1, 2019

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
16
About 80% of the building's 20 apartments
Down from 18 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 51

  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Oct 1, 2019

    Closed — Violation dismissed
  • C

    Arrange and make self-closing the doors at east entrance to building , 1st story

    Oct 1, 2019

    Closed — Violation dismissed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Sep 10, 2019

    Closed — Violation dismissed
  • B

    Fire escape defective. replace with new the broken, defective and/or missing bent shoe at drop ladder building front.

    Sep 10, 2019

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story

    Sep 10, 2019

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 10, 2019

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing on wall at public hall, 1st story

    Sep 10, 2019

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Sep 10, 2019

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east fire passageway

    Sep 10, 2019

    Closed — Violation dismissed
  • B

    Fire egress defective. remove the obstruction in fireproof passageway consisting of lock installed at east passageway door

    Sep 10, 2019

    Closed — Violation dismissed
Show 40 more ↓
  • B

    Properly repair the broken or defective counter balance upper and lower sash windows in boths windows at north wall in the 1st room from north at east located at apt 3d, 3rd story, 1st apartment from west at north

    May 5, 2019 · Apt 3D

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective counter balances at upper sashes of windows (2 total) at north wall in the 1st room from north at west located at apt 3d, 3rd story, apartment at north

    Nov 27, 2018 · Apt 3D

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the bathroom located at apt 3d, 3rd story, apartment at north

    Nov 27, 2018 · Apt 3D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 3d, 3rd story, apartment at north

    Nov 27, 2018 · Apt 3D

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 3d, 3rd story, apartment at north

    Nov 27, 2018 · Apt 3D

    Closed — Violation dismissed
  • B

    Remove all encumbrances consisting of household items under soffit at east at public hall, 1st story

    Oct 5, 2018

    Closed — Violation dismissed
  • B

    Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at ceiling at public hall, 5th story

    Jul 20, 2018

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department west and south walls at public hall, 5th story

    Jul 20, 2018

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall in the kitchen located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 29, 2018 · Apt 3D

    Open — Invalid certification
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 29, 2018 · Apt 3D

    Open — Invalid certification
  • C

    Trace and repair the source and abate the nuisance consisting of mold ... at ceiling and all walls in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 29, 2018 · Apt 3D

    Open — Nov sent out
  • C

    Replace with new the broken or defective lower sash at 1st window from west in the 1st room from north at west located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 29, 2018 · Apt 3D

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 29, 2018 · Apt 3D

    Open — Invalid certification
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 29, 2018 · Apt 3D

    Open — Invalid certification
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story

    Mar 29, 2018

    Open — Invalid certification
  • B

    Replace with new the broken or defective shoe at drope ladder at building front at fire escape

    Mar 29, 2018

    Open — Invalid certification
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agency?s housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 6, 2015

    Closed — Violation dismissed
  • B

    Replace the broken or defective under sink cabinet at south wall in the kitchen located at apt 3d, 3rd story, 1st apartment from west at north

    Sep 2, 2014 · Apt 3D

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, 1st door from east at south wall, 1st wall cabinet from south at west wall in the kitchen located at apt 3d, 3rd story, 1st apartment from west at north

    Sep 2, 2014 · Apt 3D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, east wall, west wall in the kitchen located at apt 3d, 3rd story, 1st apartment from west at north

    Sep 2, 2014 · Apt 3D

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the kitchen located at apt 3d, 3rd story, 1st apartment from west at north

    Sep 2, 2014 · Apt 3D

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north

    Sep 2, 2014 · Apt 3D

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector defective located at apt 3d, 3rd story, 1st apartment from west at north

    Sep 2, 2014 · Apt 3D

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective located at apt 3d, 3rd story, 1st apartment from west at north

    Sep 2, 2014 · Apt 3D

    Closed — Violation dismissed
  • C

    Replace with new the broken or defective glass at window lower sash at east wall in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north

    Sep 2, 2014 · Apt 3D

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the 1st room from north at west located at apt 3d, 3rd story, 1st apartment from west at north

    Sep 2, 2014 · Apt 3D

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall, 1st window frame from north at east wall in the kitchen located at apt 3d, 3rd story, 1st apartment from west at north

    Sep 2, 2014 · Apt 3D

    Open — Nov certified late
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny ?11-06(b)(2) 1st riser from west at north wall in the bathroom located at apt 3d, 3rd story, 1st apartment from west at north

    Sep 2, 2014 · Apt 3D

    Open — Nov certified late
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 25, 2009 · Apt 3D

    Open — Nov sent out
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 25, 2009 · Apt 3D

    Open — Nov sent out
  • B

    Abate the nuisance consisting of vermin mice in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 25, 2009 · Apt 3D

    Open — Nov sent out
  • A

    M/d law abate the nuisance consisting of disconnected radiator in the 1st bedroom from south located at apt 1-b, 1st story

    Sep 18, 2000 · Apt 1-B

    Open — Nov sent out
  • A

    Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration celotex drop ceiling bathroom 3 sty north apt 3d , section '' ''

    Sep 6, 1995 · Apt 3D

    Open — Nov sent out
  • A

    Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drop ceiling installed bathroom 3 sty north apt 3d. , section '' ''

    Jun 15, 1995 · Apt 3D

    Open — Nov sent out
  • A

    Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling kitchen 3 sty east apt 3d , section '' ''

    May 9, 1995 · Apt 3D

    Open — Nov sent out
  • C

    Remove or cover in a manner approved by the department the peeling lead paint and or plaster ceiling kitchen 3 sty northeast apt 3d wilson 782 2744 er1 95000863 , section '' ''

    Jan 11, 1995 · Apt 3D

    Open — Nov sent out
  • C

    Remove or cover in a manner approved by the department the peeling lead paint and or plaster ceiling bathroom 3 sty northeast apt 3d er1 95000863 , section '' ''

    Jan 11, 1995 · Apt 3D

    Open — Nov sent out
  • A

    Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also chain door guard entrance 3 sty north apt 3d , section '' ''

    Jun 20, 1994 · Apt 3D

    Open — Nov sent out
  • A

    Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also chain door guard 3 sty north apt 3d. , section '' ''

    May 19, 1994 · Apt 3D

    Open — Nov sent out
  • A

    Provide a lock and key to the entrance door of dwelling unit and, if a cl a multiple dwelling, also chain door guard 3 sty north apt 3d , section '' ''

    May 27, 1993 · Apt 3D

    Open — Nov sent out

DOB building violations · 1

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jul 25, 1994

    Dob violation - dismissed

ECB violations · 1

  • Class - 2

    Failure to maintain building in code complaint manner : at time of inspection of a 5 story building observed at expo. # 1 at 2nd fl. one window air condition installed (seated) on the window glass and at 5th fl

    Apr 3, 2023

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Jun 7, 2022 · Apt 5C

    Close
  • Plumbing

    Water supply

    Aug 11, 2020 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Oct 13, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Sep 25, 2019 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Sep 25, 2019 · Apt 1A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 24, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Sep 18, 2019 · Apt 4A

    Close
  • Unsanitary condition

    Pests

    Sep 18, 2019 · Apt 4A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 18, 2019 · Apt 4A

    Close
  • Unsanitary condition

    Pests

    Sep 18, 2019 · Apt 4A

    Close
Show 40 more ↓
  • Unsanitary condition

    Pests

    Sep 7, 2019 · Apt LOBBYA

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 7, 2019 · Apt LOBBYA

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 6, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 6, 2019 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 6, 2019 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Nov 8, 2018 · Apt 3D

    Close
  • Paint/plaster

    Wall

    Nov 8, 2018 · Apt 3D

    Close
  • Door/window

    Window frame

    Nov 8, 2018 · Apt 3D

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 30, 2018 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Sep 30, 2018 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 28, 2018 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Mar 16, 2018 · Apt 3D

    Close
  • Door/window

    Window frame

    Mar 16, 2018 · Apt 3D

    Close
  • Paint/plaster

    Wall

    Mar 16, 2018 · Apt 3D

    Close
  • Water leak

    Heavy flow

    Mar 16, 2018 · Apt 3D

    Close
  • Flooring/stairs

    Floor

    Mar 10, 2018 · Apt 3D

    Close
  • Water leak

    Heavy flow

    Mar 10, 2018 · Apt 3D

    Close
  • Door/window

    Window frame

    Mar 10, 2018 · Apt 3D

    Close
  • Electric

    Power outage

    Jan 27, 2016 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Apr 2, 2015 · Apt 3D

    Close
  • Heat/hot water

    Entire building

    Mar 18, 2015 · Apt 3D

    Close
  • Electric

    Power outage

    Feb 3, 2015 · Apt 3D

    Close
  • Electric

    Power outage

    Feb 3, 2015 · Apt 3C

    Close
  • Electric

    Power outage

    Feb 2, 2015 · Apt 3D

    Close
  • Plumbing

    Basin/sink

    Aug 28, 2014 · Apt 3D

    Close
  • Plumbing

    Bathtub/shower

    Aug 28, 2014 · Apt 3D

    Close
  • General

    Cabinet

    Aug 28, 2014 · Apt 3D

    Close
  • Plumbing

    Basin/sink

    Aug 28, 2014 · Apt 3D

    Close
  • Door/window

    Window frame

    Aug 28, 2014 · Apt 3D

    Close
  • Plumbing

    Steam pipe/riser

    Aug 28, 2014 · Apt 3D

    Close
  • Heating

    Heat related

    Mar 9, 2014 · Apt 3D

    Close
  • Heating

    Heat related

    Mar 8, 2014 · Apt 1B

    Close
  • Heating

    Heat related

    Oct 5, 2011 · Apt 3D

    Close
  • Heating

    Heat related

    Nov 30, 2009 · Apt 4C

    Close
  • Heating

    Heat related

    Oct 7, 2009 · Apt 4A

    Close
  • Heating

    Heat related

    Apr 3, 2009 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Apr 3, 2009 · Apt 3D

    Close
  • Nonconst

    Vermin

    Mar 21, 2009 · Apt 3D

    Close
  • Heating

    Heat related

    Nov 22, 2008 · Apt BLDG

    Close
  • Heating

    Heat related

    Nov 22, 2008 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C4)
Year built
1905
Floors
5
Residential units
20
Building area
11,700 ft²
Lot area
3,271 ft²
Zoning
R6B
Community board
301
Council district
33
Block / lot
2700 / 18
Assessed value
$820,800
Landmark / historic district
No

HPD registration #335968, last renewed Aug 24, 2025.

Questions about 195 Driggs Avenue

Who owns 195 Driggs Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Driggs Ave Limited Li.

Does 195 Driggs Avenue have violations?

Yes. NYC HPD has recorded 51 housing violations at this property.

Is 195 Driggs Avenue rent stabilized?

NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 80% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 195 Driggs Avenue built?

City records list 1905 as the year it was built.

How many apartments are in 195 Driggs Avenue?

It has 20 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.