30 Driggs Avenue
Brooklyn, NY 11222BBL 3-02690-0043Map
Owner of record: 30 Driggs LLC
30 Driggs Avenue is a walk-up apartment building built in 1931 in Brooklyn, 11222. It has 6 residential units across 3 floors. The owner of record is 30 Driggs LLC. HPD has recorded 26 housing violations here, most recently on June 6, 2026. 3 of the 26 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 26
- DOB violations
- 1
- ECB violations
- 0
- HPD complaints
- 87
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 26
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 1r lower level, 1st story, 1st apartment from north at east
Jun 6, 2026 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 1r lower level, 1st story, 1st apartment from north at east
Jun 6, 2026 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
Jun 6, 2026 · Apt 1R
Closed — Violation dismissed - BHazardous
Replace the broken or defective water closet in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
Jun 6, 2026 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from north at east
Apr 22, 2026 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 1r, 1st story, 1st apartment from north at east
Apr 22, 2026 · Apt 1R
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Apr 22, 2026 · Apt 1R
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Apr 22, 2026 · Apt 1R
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1r, 1st story, 1st apartment from north at east
Apr 22, 2026 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the foyer located at apt 1r, 1st story, 1st apartment from north at east
Apr 22, 2026 · Apt 1R
Closed — Violation dismissed
Show 16 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
Apr 22, 2026 · Apt 1R
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north 2 basement ceiling in the 2nd room from north located at apt 1r lower level, 1st story, 1st apartment from north at east
Aug 15, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective outlet at north 1 basement north wall in the 1st room from north located at apt 1r lower level, 1st story, 1st apartment from north at east
Aug 15, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 20 sq ft at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from north at east
Aug 15, 2024 · Apt 1R
Closed — Violation dismissed - BHazardous
Fire egress defective. restore egress by removing locking device and arrange to open readily the gate in fence at lot line electrical line blocking gate door yard
Aug 8, 2024
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 2 sq ft at west wall in the kitchen located at apt 1l, 1st story, 1st apartment from west at north original violation 17176413 issued 08-aug-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 8, 2024 · Apt 1L
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 2 sq ft at west wall in the kitchen located at apt 1l, 1st story, 1st apartment from west at north
Aug 8, 2024 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing kickstand doorstop installed at vestibule door at public hall, 1st story
Dec 30, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 24, 2022
Closed — Violation dismissed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)
Mar 10, 2017
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3l, 3rd story, 1st apartment from south at west
Feb 13, 2017 · Apt 3L
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at lobby, 1st story
Feb 13, 2017
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Feb 1, 2017 · Apt 1L
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 1st apartment from south at west
Feb 1, 2017 · Apt 1L
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 9, 2015
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Nov 9, 2015
Closed — Violation closed
DOB building violations · 1
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Mold
Jul 19, 2026 · Apt 1R
Close - Water leak
Heavy flow
Jul 18, 2026 · Apt 1R1L
Close - Water leak
Heavy flow
Jul 18, 2026 · Apt 1R
Close - Unsanitary condition
Sewage
Jul 18, 2026 · Apt 1R
Close - Unsanitary condition
Sewage
Jul 18, 2026 · Apt 1R
Close - Paint/plaster
Ceiling
Jun 5, 2026 · Apt 1R
Close - Water leak
Slow leak
Jun 5, 2026 · Apt 1R
Close - Heat/hot water
Apartment only
Jun 5, 2026 · Apt 1R
Close - General
Ventilation system
Apr 20, 2026 · Apt 1R
Close - Plumbing
Radiator
Apr 20, 2026 · Apt 1R
Close
Show 40 more ↓
- Unsanitary condition
Pests
Apr 20, 2026 · Apt 1R
Close - Plumbing
Water supply
Apr 20, 2026 · Apt 1R
Close - Paint/plaster
Wall
Apr 20, 2026 · Apt 1R
Close - Unsanitary condition
Pests
Apr 20, 2026 · Apt 1R
Close - General
Signage missing
Feb 23, 2026 · Apt BLDG
Close - Outside building
Porch/balcony
Feb 23, 2026 · Apt FRONTO
Close - Water leak
Slow leak
Nov 23, 2025 · Apt 2R
Close - Water leak
Heavy flow
Aug 17, 2025 · Apt 1R
Close - Water leak
Heavy flow
Aug 17, 2025 · Apt 1R
Close - Water leak
Heavy flow
Aug 13, 2025 · Apt 1R
Close - Unsanitary condition
Mold
Aug 13, 2024 · Apt 1R
Close - General
Ventilation system
Aug 13, 2024 · Apt 1R
Close - Flooring/stairs
Floor
Aug 13, 2024 · Apt 1R
Close - Electric
Outlet/switch
Aug 11, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Aug 11, 2024 · Apt 1R
Close - Flooring/stairs
Floor
Aug 11, 2024 · Apt 1R
Close - General
Ventilation system
Aug 11, 2024 · Apt 1R
Close - Unsanitary condition
Mold
Aug 5, 2024 · Apt 1L
Close - Unsanitary condition
Pests
Aug 5, 2024 · Apt 1L
Close - Unsanitary condition
Pests
Aug 5, 2024 · Apt 1L
Close - Unsanitary condition
Sewage
Jul 23, 2024 · Apt 1L
Close - Unsanitary condition
Mold
Jul 23, 2024 · Apt 1L
Close - Unsanitary condition
Mold
Jul 17, 2024 · Apt 1L
Close - Water leak
Damp spot
Jul 17, 2024 · Apt 1L
Close - Paint/plaster
Door/frame
Jul 17, 2024 · Apt 1L
Close - Flooring/stairs
Floor
Jul 17, 2024 · Apt 1L
Close - Paint/plaster
Wall
Jul 17, 2024 · Apt 1L
Close - Flooring/stairs
Floor
Jul 9, 2024 · Apt 1R
Close - Safety
Carbon monoxide detector
Jul 9, 2024 · Apt 1R
Close - Paint/plaster
Window/frame
Jul 9, 2024 · Apt 1R
Close - Electric
Outlet/switch
Jul 9, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Jul 9, 2024 · Apt 1R
Close - Water leak
Damp spot
Jun 3, 2024 · Apt 1L
Close - Unsanitary condition
Mold
Jun 3, 2024 · Apt 1L
Close - Unsanitary condition
Pests
Jun 3, 2024 · Apt 1L
Close - Door/window
Door
Mar 24, 2024 · Apt BLDG
Close - Electric
Outlet/switch
Mar 24, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Mar 24, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Mar 1, 2024 · Apt ENTIRE
Close - Unsanitary condition
Pests
Dec 18, 2023 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1931
- Floors
- 3
- Residential units
- 6
- Building area
- 4,500 ft²
- Lot area
- 1,969 ft²
- Zoning
- R6B
- Community board
- 301
- Council district
- 33
- Block / lot
- 2690 / 43
- Assessed value
- $540,900
- Landmark / historic district
- No
HPD registration #318843, last renewed Jul 30, 2026.
Questions about 30 Driggs Avenue
Who owns 30 Driggs Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 30 Driggs LLC.
Does 30 Driggs Avenue have violations?
Yes. NYC HPD has recorded 26 housing violations at this property.
Is 30 Driggs Avenue rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 17% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 30 Driggs Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 30 Driggs Avenue?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.