161 Meserole Avenue
Brooklyn, NY 11222BBL 3-02599-0025Map
Owner of record: Sh Meserole LLC
161 Meserole Avenue is an elevator apartment building built in 2023 in Brooklyn, 11222. It has 29 residential units across 8 floors. The owner of record is Sh Meserole LLC. HPD has recorded 1 housing violation here, most recently on May 11, 2026. City tax records listed 9 rent-stabilized apartments here in 2024.
- HPD violations
- 1
- DOB violations
- 1
- ECB violations
- 14
- HPD complaints
- 19
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Closed — Violation dismissed
DOB building violations · 1
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed
ECB violations · 14
- Class - 2
Inadequate work or storage protection: at inspection it was observed: failure to provide mesh/solid protection for public using sidewalk at exp.1, material storage was above yodock on exp.4, high lift and concr
Dec 12, 2023
Resolve - Class - 2
At inspection, it was observed: construction material and debris that are combustible and not contained as per code stored at the first floor exposing public to fire outbreak and electric cables and holes that
Dec 12, 2023
Resolve - Class - 2
Worker sheds,contractor sheds,contractor offices and similar structures: at inspection, it was observed shanti about 256 sq.feet at the cellar fabricated with non-fire rated plywood in close proximity to other
Dec 12, 2023
Resolve - Class - 2
At the time of inspection while responding to a complaint, i observed facade work in progress at exposure #2 has styrofoam falling on sidewalk and adjacent properties yard creating a mess and breathing hazard f
Nov 13, 2023
Resolve - Class - 1
Responding complaint observed: active job site, garbage removal from 7th floor in progress using a boom truck partially blocking roadway and sidewalk contrary to dot regulations, no permit was provided to occup
Sep 22, 2023 · Penalty $625
Resolve - Class - 1
Responding complaint observed: concrete operations in progress using a concrete pump partially blocking roadway and sidewalk contrary to dot regulations, no permit was provided to occupied mcguinness blvd side.
Sep 20, 2023 · Penalty $625
Resolve - Class - 2
Observed ongoing concrete operations on active jobsite performing inadequate washout to the concrete equipment. no protection was provided to active road way from concrete waste due to cleaning equipment. provi
Aug 30, 2023 · Penalty $2,500
Resolve - Class - 2
Observed exposed foundation at exposure 2 of adjacent property @ 1st floor. no pre-construction survey, records for the condition. stop all work within 6 feet of exposure 2 @ 1 floor. provide engineer report f
Aug 30, 2023 · Penalty $1,250
Resolve - Class - 2
Observed inadequate housekeeping on active jobsite on throughout multiple locations on active jobsite. the contents of the inadequate housekeeping consist of construction debris and materials, large amounts of
Aug 30, 2023
Resolve - Class - 2
On active jobsite observed that no fire extinguishers were placed/available on upper levels of jobsite (3rd and 4th floors). this creates a fire hazard to the jobsite due to inadequate housekeeping throughout j
Aug 30, 2023
Resolve
Show 4 more ↓
- Class - 1
At the time of inspection i observed jobsite at excavation phase, i also observed a 2 toilets stored on an unsafe makeshift platform installed inside jobsite at exp#1 upon request, for design drawing for platfo
May 19, 2023
Resolve - Class - 1
At the time of inspection of a demo sign off, observed at exposure #1 & 4 a sidewalk damaged with cracks and unfilled hole which have areas with protruding wood above the surface. this causes a dangerous trippi
Mar 9, 2023 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioner's order to file a cofc with dob.note:previous violation#34781114y issued on 6/19/09 for illegal use of 1st flr in r6 zoning district.dob records indicate:hearing status
Dec 10, 2010 · Penalty $800
Resolve - Class - 2
Illegal use in a residential district (r6-zone) note: at the above mentioned address a tire shop business operating under the name "pepe's" exist observed excessive amounts of rubber tires stored inside establi
Jun 19, 2009 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Jan 29, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 11, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 2, 2021 · Apt 2
Close - Heat/hot water
Entire building
Dec 2, 2021 · Apt 2
Close - Heat/hot water
Entire building
Nov 13, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 5, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
May 5, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2019 · Apt BLDG
Close
Show 9 more ↓
- Heat/hot water
Entire building
Jan 30, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2016 · Apt 2
Close - Heat/hot water
Entire building
Jun 29, 2015 · Apt 2FL
Close - Heat/hot water
Entire building
Mar 30, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2015 · Apt BLDG
Close - Heating
Heat related
Dec 11, 2009 · Apt 2
Close - Heating
Heat related
Nov 23, 2005 · Apt 2
Close - General
Locks
May 26, 2004 · Apt 3
Close - General
Windows
May 26, 2004 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2023
- Floors
- 8
- Residential units
- 29
- Building area
- 29,209 ft²
- Lot area
- 3,750 ft²
- Zoning
- R7A
- Community board
- 301
- Council district
- 33
- Block / lot
- 2599 / 25
- Assessed value
- $3,627,000
- Landmark / historic district
- No
HPD registration #391147, last renewed Oct 11, 2025.
Questions about 161 Meserole Avenue
Who owns 161 Meserole Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Sh Meserole LLC.
Does 161 Meserole Avenue have violations?
Yes. NYC HPD has recorded 1 housing violations at this property.
Is 161 Meserole Avenue rent stabilized?
NYC Department of Finance tax bills listed 9 rent-stabilized units here in 2024 (about 31% of its 29 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 161 Meserole Avenue built?
City records list 2023 as the year it was built.
How many apartments are in 161 Meserole Avenue?
It has 29 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.