60 Wharf Drive

Brooklyn, NY 11222BBL 3-02570-0040Map

Owner of record: West Development B LLC

60 Wharf Drive is an elevator apartment building built in 2020 in Brooklyn, 11222. It has 554 residential units across 40 floors. The owner of record is West Development B LLC. HPD has recorded 34 housing violations here, most recently on February 25, 2026. City tax records listed 554 rent-stabilized apartments here in 2024.

HPD violations
34
DOB violations
0
ECB violations
24
HPD complaints
126

Available now in this building

Show 7 more ↓

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation Feb 25, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
554
About 100% of the building's 554 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 34

  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 911, 9th story, 2nd apartment from east at south

    Feb 25, 2026 · Apt 911

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Feb 25, 2026

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jan 30, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the 2nd room from north located at apt 326, 3rd story, 2nd apartment from south at west

    Jan 30, 2026 · Apt 326

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Jan 30, 2026

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the 1st room from east located at apt 2409, 24th story, 1st apartment from east at south

    Jan 30, 2026 · Apt 2409

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2409, 24th story, 1st apartment from east at south

    Jan 30, 2026 · Apt 2409

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the 1st room from east located at apt 2409, 24th story, 1st apartment from east at south

    Jan 30, 2026 · Apt 2409

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 830, 8th story, 4th apartment from east at south

    Dec 6, 2025 · Apt 830

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at cellar at boiler room

    Dec 6, 2025

    Closed — Violation dismissed
Show 24 more ↓
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1405, 14th story, 3rd apartment from east at south

    Nov 15, 2025 · Apt 1405

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1405, 14th story, 3rd apartment from east at south

    Nov 15, 2025 · Apt 1405

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 2011, 20th story, 1st apartment from north at east

    Aug 5, 2025 · Apt 2011

    Closed — Violation closed
  • A

    Cleanse to the satisfaction of this department the mildew off the grout, at the tile joints and around the bathtub, in the bathroom located at apt 2011, 20th story, 1st apartment from north at east

    Aug 5, 2025 · Apt 2011

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the foyer located at apt 2011, 20th story, 1st apartment from north at east

    Aug 5, 2025 · Apt 2011

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 315, 3rd story, 2nd apartment from north at east

    Feb 2, 2025 · Apt 315

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 315, 3rd story, 2nd apartment from north at east

    Feb 2, 2025 · Apt 315

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3809, 38th story, 1st apartment from east at south , section ''east''

    Jan 25, 2025 · Apt 3809

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system locked door at cellar at boiler room

    Jan 25, 2025

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 615, 6th story, 2nd apartment from north at east

    Jan 22, 2025 · Apt 615

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the 2nd room from north located at apt 315, 3rd story, 2nd apartment from north at east

    Jan 22, 2025 · Apt 315

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 9th story

    Aug 12, 2024

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling at public hall, 9th story

    Aug 12, 2024

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak over the ceiling at public hall, 9th story

    Aug 12, 2024

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 9th story

    Aug 12, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story

    Apr 28, 2024

    Closed — Violation closed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Apr 8, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 8, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Apr 8, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Apr 8, 2024

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Apr 8, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Apr 8, 2024

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Apr 8, 2024

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 325, 3rd story, 2nd apartment from south at west

    Mar 21, 2024 · Apt 325

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 24

  • Class - 1

    Summons issued for failure to provide unobstructed passageway due to the exit doors on the 7th,8th and 9th floors of stairwell f locked, along with the exit door inside the gym was locked., remove obstruction

    Apr 5, 2025 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building: the awning above the front entrance is defective missing fasteners in various locations at 1st floor at time of inspection, repair and/replace

    Nov 25, 2024

    Resolve
  • Class - 1

    At the time of inspection due to an incident reported, i met with mr. jason falqucee, onsite who has been at 60 wharf drive since june 14, 2023 as a site safety manager, but according to dob records, the last s

    Jul 12, 2023 · Penalty $625

    Resolve
  • Class - 1

    At the time of my inspection of a proposed 40 story new building responding to complaint observed supported scaffolds in different locations with following violation condition: 1. not fully plank 2. wood planks

    Jun 13, 2023 · Penalty $625

    Resolve
  • Class - 2

    At the time of my inspection job site , i observed a supported scaffold 12 feet high at exposure 1 not maintained as required, missing guard rails , toe boards, comply with code requirements.maintain supported

    May 16, 2023

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments. observed one 2x10 plank footing when approved drawing requires double also observed outrigger placed on setback w 1 frame ap

    May 16, 2023 · Penalty $2,500

    Resolve
  • Class - 1

    At the time of my inspection of a 40 story new building , currently at bulk head level and fully enclosed, while responding to a incident where a worker fell off a 8 foot a framed ladder , worker fell while se

    May 16, 2023 · Penalty $2,500

    Resolve
  • Class - 2

    Bc 3314.1 miscellaneous violations. failure to maintain temporary construction equipment. at time of inspection on an active jobsite,i observed scaffold at corner of exposure#4 not maintain,scaffold missing gua

    Jan 24, 2023

    Resolve
  • Class - 2

    Working not conform to approved construction document.at the time of inspection proposed 40 stories i observed structural dd approved not reflecting on existing condition using smaller rebar size & different

    Feb 8, 2022 · Penalty $625

    Resolve
  • Class - 1

    Bc3308.6 alternate system not maintained as required.at time of inspection of 40 story nb currently at roof level active jobsite observed cocoon system installed at 37th story level setback exp #1 cocoon system

    Feb 1, 2022

    Resolve
Show 14 more ↓
  • Class - 1

    Failure to maintain and institute safety measures.note:responding to incident reported by site safety manager mr isuf shehy was off loading 4" black iron pip on 9th floor with co-worker who cut the straps that

    Jan 24, 2022

    Resolve
  • Class - 1

    Bc3303.6 escape hatch.note:at time of inspection of 40 story new building construction work in progress observed 40 floor being pour with 37 floor fully girded with tarp and gas heaters inside to keep concrete

    Jan 24, 2022 · Penalty $625

    Resolve
  • Class - 1

    Preshift safety meeting content note:at the time of my inspection of a40 story building at 26th floor level under construction.i observed active jobsite with multiple trades working activity upon request for pr

    Nov 10, 2021

    Resolve
  • Class - 1

    Bc3308.9.3 insps note:atoi of proposed 40stynb@19fl level,i observed cocoon system in place enclosing level 15-19,upon request for vendor signoff letter&maintenance or insp reports none was provided created uns

    Aug 26, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to institute&maintain safety measures&temp const equipment note:atoi of proposed 40stynb,active jobsite w/rebars operations for 19fl,in response to incident where worker (danny miranda) has his finger p

    Aug 26, 2021

    Resolve
  • Class - 1

    Failure to communicate required info during sitesafety orientation or refresher note:atoi of proposed 40stynb@19fl level in response to incident for worker (danny miranda),upon request for worker sitesafety ori

    Aug 26, 2021

    Resolve
  • Class - 1

    Failure to institute&maintain safety measures&temp const equipment note:atoi of proposed 40stynb,active jobsite w/form work&rebars operationfor 19fl in response to incident where worker finger pinched while wor

    Aug 26, 2021

    Resolve
  • Class - 1

    3310-02g concrete safety manager note:atoi of proposed 40stynb@19fl level,const work in progress.i observed concrete safety manager2571 was permanently relieved of duties&concrete safety manager2629 has being p

    Aug 26, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Work doesnt conform to approved const docs &/or approved amendments note atoi of proposed 40stynb@19fl level,i observed screen typical secs (cocoon system) in place b/w 15-19sty.upon reviewing approved drawings

    Aug 26, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to notify the department of an accident/incident that resultedin a fatality or an injury.note a worker slipped and hit a pipe.the worker suffered bruises to his left shin.he was taken to an urgent care

    Aug 11, 2021

    Resolve
  • Class - 1

    Bc3320.7 power buggies responsibilities of employers&workers employers&workers shall have following responsibilities regarding power buggies-stop all use of power buggies in bldg 65privatedr-note:ato my insp of

    Jul 16, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to notify the department of building of an acccident/incident that resulted in a fatality or an injury.note:a worker hit his left index finger and walked to on urgent care center to recieve treatment.as

    Jul 15, 2021

    Resolve
  • Class - 2

    Work does not conform to approved construction documents and/or approved amendments.note at time of my inspection of a 40 story new buildingat 10th floor level under construction,i observed exterior climbing wa

    Jun 25, 2021 · Penalty $625

    Resolve
  • Class - 1

    Failure to maintain a record of orientration preformed at job site adequately-logs missing emergency contact informations.note:at the time of my inspection of an active job site under construction at the 7th fl

    Jun 1, 2021

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    May 17, 2026 · Apt 3109

    Close
  • Appliance

    Electric/gas range

    Apr 15, 2026 · Apt 430

    Close
  • Electric

    Lighting

    Apr 15, 2026 · Apt 430

    Close
  • Paint/plaster

    Wall

    Apr 15, 2026 · Apt 430

    Close
  • General

    Cabinet

    Apr 15, 2026 · Apt 430

    Close
  • Door/window

    Window frame

    Mar 17, 2026 · Apt 714

    Close
  • Heat/hot water

    Apartment only

    Feb 22, 2026 · Apt 404

    Close
  • Heat/hot water

    Apartment only

    Feb 22, 2026 · Apt 911

    Close
  • Heat/hot water

    Entire building

    Feb 22, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 22, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Feb 22, 2026 · Apt 2210

    Close
  • Heat/hot water

    Apartment only

    Feb 3, 2026 · Apt 3109

    Close
  • Door/window

    Door

    Feb 2, 2026 · Apt 1609

    Close
  • Heat/hot water

    Apartment only

    Feb 2, 2026 · Apt 2206

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt 2506

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt 1505

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 28, 2026 · Apt 326

    Close
  • Heat/hot water

    Apartment only

    Jan 28, 2026 · Apt 226HEA

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 326

    Close
  • Heat/hot water

    Apartment only

    Jan 27, 2026 · Apt 3901

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jan 26, 2026 · Apt 2409

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 25, 2026 · Apt 516

    Close
  • Heat/hot water

    Apartment only

    Dec 29, 2025 · Apt 404

    Close
  • Heat/hot water

    Apartment only

    Dec 27, 2025 · Apt APT911

    Close
  • Heat/hot water

    Apartment only

    Dec 27, 2025 · Apt 411

    Close
  • Heat/hot water

    Apartment only

    Dec 27, 2025 · Apt 404

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2025 · Apt 811

    Close
  • Heat/hot water

    Apartment only

    Dec 16, 2025 · Apt 911

    Close
  • Heat/hot water

    Apartment only

    Dec 15, 2025 · Apt 911

    Close
  • Heat/hot water

    Apartment only

    Dec 13, 2025 · Apt 911

    Close
  • Heat/hot water

    Apartment only

    Dec 10, 2025 · Apt 918

    Close
  • Heat/hot water

    Apartment only

    Dec 7, 2025 · Apt 930

    Close
  • Heat/hot water

    Apartment only

    Dec 3, 2025 · Apt 930

    Close
  • Heat/hot water

    Apartment only

    Nov 19, 2025 · Apt 1410

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2025 · Apt 1405

    Close
  • Heat/hot water

    Entire building

    Oct 24, 2025 · Apt 2708

    Close
  • Unsanitary condition

    Sewage

    Jul 31, 2025 · Apt 2011

    Close
  • Unsanitary condition

    Mold

    Jul 31, 2025 · Apt 2011

    Close
  • Water leak

    Slow leak

    Jul 31, 2025 · Apt 2011

    Close
  • Unsanitary condition

    Mold

    Jul 31, 2025 · Apt 2011

    Close
  • Water leak

    Heavy flow

    Jul 31, 2025 · Apt 2011

    Close
  • Unsanitary condition

    Mold

    Jul 26, 2025 · Apt 516

    Close
  • Unsanitary condition

    Mold

    Jul 26, 2025 · Apt 912

    Close
  • Electric

    Outlet/switch

    Feb 16, 2025 · Apt 612

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2025 · Apt 315

    Close
  • Heat/hot water

    Apartment only

    Jan 30, 2025 · Apt 915

    Close

Sales history

DatePriceTypeUnits
Mar 30, 2026Non-market transferRentals - elevator apartments556

Building details

Building type
Elevator apartment building (D7)
Year built
2020
Floors
40
Residential units
554
Building area
630,112 ft²
Lot area
65,305 ft²
Zoning
R8
Community board
301
Council district
33
Block / lot
2570 / 40
Assessed value
$73,105,650
Landmark / historic district
No

HPD registration #390735, last renewed Jul 10, 2026.

Questions about 60 Wharf Drive

Who owns 60 Wharf Drive?

The owner of record in NYC Department of City Planning PLUTO data is West Development B LLC.

Does 60 Wharf Drive have violations?

Yes. NYC HPD has recorded 34 housing violations at this property.

Is 60 Wharf Drive rent stabilized?

NYC Department of Finance tax bills listed 554 rent-stabilized units here in 2024 (about 100% of its 554 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 60 Wharf Drive built?

City records list 2020 as the year it was built.

How many apartments are in 60 Wharf Drive?

It has 554 residential units and 556 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.