300 South 3 Street
Brooklyn, NY 11211BBL 3-02436-0006Map
Owner of record: 300 South Realty Corp
300 South 3 Street is a walk-up apartment building built in 1913 in Brooklyn, 11211. It has 24 residential units across 6 floors. The owner of record is 300 South Realty Corp. HPD has recorded 412 housing violations here, most recently on September 30, 2026. 49 of the 50 most recent violations are still open. City tax records listed 10 rent-stabilized apartments here in 2024.
- HPD violations
- 412
- DOB violations
- 3
- ECB violations
- 6
- HPD complaints
- 460
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 412
- BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2d, 4th story, 1st apartment from north at east
Sep 30, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective bottom panel inside sink base cabinet in the kitchen located at apt 2d, 4th story, 1st apartment from north at east
Sep 30, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Replace with new the missing escutcheon plate at riser pipe in the 1st room from north located at apt 2d, 4th story, 1st apartment from north at east
Sep 30, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective doorbell at door in the entrance located at apt 2d, 4th story, 1st apartment from north at east
Sep 30, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 2d, 4th story, 1st apartment from north at east
Sep 30, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2d, 4th story, 1st apartment from north at east
Sep 30, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective latch set at vestibule door at public hall, 1st story
Sep 17, 2026
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 17, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at fire exit to west yard at public hall, 1st story
Sep 17, 2026
Open — First no access to re- inspect violation - ANon-hazardous
Paint or post a sign indicating floors at all stories at public hall
Sep 17, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Remove all encumbrances consisting of discarded range at public hall, 1st story
Sep 17, 2026
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration plywood shelf created over stairs to street to store assorted household items at fire passage way
Sep 17, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 10, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch and its assemblies at vestibule door at public hall at 1st story
Sep 10, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony at building front north fire escape
Sep 10, 2026
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 3rd room from north at east located at apt 1b, 2nd story, 1st apartment from east at south
Sep 10, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard
Sep 1, 2026
Open — Nov certified on time - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2d, 3rd story, 1st apartment from east at south
Sep 1, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2d, 3rd story, 1st apartment from east at south
Sep 1, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets drain at wash basin in the bathroom located at apt 2d, 3rd story, 1st apartment from east at south
Sep 1, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt e1, 4th story, 1st apartment from south at west
Sep 1, 2026 · Apt E1
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt e1, 4th story, 1st apartment from south at west
Sep 1, 2026 · Apt E1
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective wash basin in the bathroom located at apt e1, 4th story, 1st apartment from south at west
Sep 1, 2026 · Apt E1
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective marble saddle in the bathroom located at apt e1, 4th story, 1st apartment from south at west
Sep 1, 2026 · Apt E1
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east,west walls and ceiling in the bathroom located at apt e1, 4th story, 1st apartment from south at west
Sep 1, 2026 · Apt E1
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt e1, 4th story, 1st apartment from south at west
Sep 1, 2026 · Apt E1
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub and wash basin in the bathroom located at apt 2d, 3rd story, 1st apartment from east at south
Sep 1, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the bathroom located at apt 2d, 3rd story, 1st apartment from east at south
Sep 1, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east and south walls in the bathroom located at apt 2d, 3rd story, 1st apartment from east at south
Sep 1, 2026 · Apt 2D
Open — Civ14 mailed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet observed at ceiling and east wall in the bathroom located at apt 2d, 3rd story, 1st apartment from east at south
Sep 1, 2026 · Apt 2D
Open — Notice of issuance sent to tenant - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 2d, 3rd story, 1st apartment from east at south
Sep 1, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east located at apt 2d, 3rd story, 1st apartment from east at south
Sep 1, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2d, 3rd story, 1st apartment from east at south
Sep 1, 2026 · Apt 2D
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt e1, 4th story, 1st apartment from south at west
Sep 1, 2026 · Apt E1
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt e1, 4th story, 1st apartment from south at west
Sep 1, 2026 · Apt E1
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt e1, 4th story, 1st apartment from south at west
Sep 1, 2026 · Apt E1
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt e1, 4th story, 1st apartment from south at west
Sep 1, 2026 · Apt E1
Open — Violation will be reinspected - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft observed at south wall in the bathroom located at apt 1b, 2nd story, 1st apartment from east at south
Aug 15, 2026 · Apt 1B
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1b, 2nd story, 1st apartment from east at south
Aug 15, 2026 · Apt 1B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 1b, 2nd story, 1st apartment from east at south
Aug 15, 2026 · Apt 1B
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective buzzer and return voice intercom system from building's entrance to east wall panel in the foyer located at apt 1d, 1st story, 1st apartment from east at south
Aug 7, 2026 · Apt 1D
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective latch set and assemblies at vestibule door , 1st story
Aug 7, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door (from vestibule to public hall) , 1st story
Aug 7, 2026
Open — Not complied with - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1d, 1st story, 1st apartment from east at south
Aug 7, 2026 · Apt 1D
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1d, 4th story, 1st apartment from south at west
Jul 19, 2026 · Apt 1D
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling, west, east and north walls in the bathroom located at apt 1d, 4th story, 1st apartment from south at west
Jul 19, 2026 · Apt 1D
Open — Notice of issuance sent to tenant - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pot's at building front at fire escape, 2nd story
Jun 23, 2026
Open — Nov certified on time - BHazardous
Remove all encumbrances consisting of flower pot's at building front at fire escape, 4th story
Jun 23, 2026
Open — Nov certified on time - ANon-hazardous
Replace with new the missing garbage lids yard
Jun 23, 2026
Open — Nov certified on time - BHazardous
Remove all encumbrances consisting of household items. at public hall, 2nd story
Jun 23, 2026
Open — Nov certified on time
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 6
- Class - 2
Observed large amount of garbage , what appears to be steps to lower alleyway of building at exp 1, repair and/or replace
Mar 31, 2026 · Penalty $6,250
Active - Class - 2
Permanent dwelling used/converted for other than permanent residentialpurposes.department of buildings records indicates building has been used transiently having 2 guests for short term less than 30 days w/o h
Sep 4, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner.lack of number of meanse of egress for every floor per bc1021.1 and 27-366 for transient uwe at apt-3a.rem:discontinue illegal use.
Sep 4, 2019
Resolve - Class - 1
Failure to maintain building in code compliant manner.lack of an automatic sprinkler system where's required as per bc903.2 and 27-954 for transient use at apt 3a.rem:discontinue illegal use.
Sep 4, 2019 · Penalty $312
Resolve - Class - 1
Bc907.2.8/failure to provide fire alarm system for transient use at apt 3a.rem:discontinue illegal use.
Sep 4, 2019 · Penalty $625
Resolve - Non-hazardous
Exit passageway width decreased by obstruction passageway from rear fire escape decreased to approx 1i/2 feet from approx 4'-0" by more than 6 garbage cans at left egress side to street. also wooden stair threa
Sep 25, 1996 · Penalty $500
Resolve
Complaints
- Water leak
Slow leak
Oct 12, 2026 · Apt D4
Open - Unsanitary condition
Pests
Oct 12, 2026 · Apt D4
Open - Water leak
Slow leak
Sep 23, 2026 · Apt 2D
Close - Safety
Carbon monoxide detector
Sep 23, 2026 · Apt 2D
Close - Paint/plaster
Wall
Sep 23, 2026 · Apt 2D
Close - Unsanitary condition
Garbage/recycling storage
Sep 10, 2026 · Apt D4
Close - Unsanitary condition
Pests
Sep 10, 2026 · Apt D4
Close - Unsanitary condition
Pests
Sep 10, 2026 · Apt D4
Close - Door/window
Door
Sep 10, 2026 · Apt D4
Close - Water leak
Slow leak
Sep 10, 2026 · Apt 4F
Close
Show 40 more ↓
- Unsanitary condition
Pests
Sep 10, 2026 · Apt 4F
Close - Unsanitary condition
Garbage/recycling storage
Aug 25, 2026 · Apt BLDG
Close - Door/window
Door
Aug 21, 2026 · Apt D4
Close - General
Bell/buzzer/intercom
Aug 21, 2026 · Apt D4
Close - Unsanitary condition
Pests
Aug 21, 2026 · Apt D4
Close - Plumbing
Toilet
Aug 7, 2026 · Apt 2D
Close - Paint/plaster
Wall
Aug 7, 2026 · Apt 2D
Close - Water leak
Heavy flow
Aug 7, 2026 · Apt 2D
Close - Water leak
Slow leak
Aug 3, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Aug 3, 2026 · Apt 1B
Close - Water leak
Slow leak
Jul 28, 2026 · Apt E1
Close - Paint/plaster
Ceiling
Jul 26, 2026 · Apt 4F
Close - Water leak
Damp spot
Jul 26, 2026 · Apt 4F
Close - Unsanitary condition
Pests
Jul 26, 2026 · Apt 4F
Close - Unsanitary condition
Mold
Jul 16, 2026 · Apt 1D
Close - Water leak
Slow leak
Jul 13, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Jul 13, 2026 · Apt 1B
Close - Paint/plaster
Wall
Jul 13, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Jun 22, 2026 · Apt A3
Close - Unsanitary condition
Pests
Jun 17, 2026 · Apt 1B
Close - Water leak
Slow leak
Jun 17, 2026 · Apt 1B
Close - Plumbing
Toilet
Jun 11, 2026 · Apt 1B
Close - Plumbing
Basin/sink
Apr 14, 2026 · Apt 1D
Close - Electric
Outlet/switch
Apr 14, 2026 · Apt 1D
Close - General
Ventilation system
Apr 14, 2026 · Apt 1D
Close - Unsanitary condition
Pests
Apr 14, 2026 · Apt 1D
Close - Unsanitary condition
Mold
Apr 14, 2026 · Apt 1D
Close - General
Mailbox
Mar 19, 2026 · Apt 1C
Close - Water leak
Slow leak
Mar 19, 2026 · Apt 1C
Close - Electric
Outlet/switch
Mar 19, 2026 · Apt 1C
Close - Unsanitary condition
Garbage/recycling storage
Mar 19, 2026 · Apt 1C
Close - Plumbing
Bathtub/shower
Mar 5, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Mar 5, 2026 · Apt 1A
Close - Flooring/stairs
Floor
Mar 5, 2026 · Apt 1A
Close - General
Cabinet
Mar 5, 2026 · Apt 1A
Close - Unsanitary condition
Mold
Mar 5, 2026 · Apt 1A
Close - Door/window
Door
Mar 5, 2026 · Apt 1A
Close - Water leak
Slow leak
Mar 5, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Mar 5, 2026 · Apt 1A
Close - Electric
Wiring
Mar 5, 2026 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1913
- Floors
- 6
- Residential units
- 24
- Building area
- 19,680 ft²
- Lot area
- 3,800 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2436 / 6
- Assessed value
- $805,950
- Landmark / historic district
- No
HPD registration #356614, last renewed Aug 28, 2025.
Questions about 300 South 3 Street
Who owns 300 South 3 Street?
The owner of record in NYC Department of City Planning PLUTO data is 300 South Realty Corp.
Does 300 South 3 Street have violations?
Yes. NYC HPD has recorded 412 housing violations at this property.
Is 300 South 3 Street rent stabilized?
NYC Department of Finance tax bills listed 10 rent-stabilized units here in 2024 (about 42% of its 24 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 300 South 3 Street built?
City records list 1913 as the year it was built.
How many apartments are in 300 South 3 Street?
It has 24 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.