245 South 3 Street
Brooklyn, NY 11211BBL 3-02421-0037Map
Owner of record: 245 South 3rd Owner LLC
245 South 3 Street is a walk-up apartment building built in 1910 in Brooklyn, 11211. It has 8 residential units across 4 floors. The owner of record is 245 South 3rd Owner LLC. HPD has recorded 23 housing violations here, most recently on August 29, 2024. 1 of the 23 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 23
- DOB violations
- 6
- ECB violations
- 2
- HPD complaints
- 44
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 23
- CImmediately hazardous
Remove device preventing door from being self-closing hook and eye installed at building entrance door at public hall, 1st story
Aug 29, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of rodents evidence of rat droppings at basement
Aug 29, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents rats at rear yard
Nov 4, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling rear at cellar
Nov 4, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents rats at cellar
Nov 4, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice yard at north
Sep 7, 2022
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front
Jun 30, 2022
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wire at building front
Jun 30, 2022
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Mar 26, 2022 · Apt 1R
Closed — Violation dismissed
Show 13 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1r, 1st story, 1st apartment from west at north
Mar 26, 2022 · Apt 1R
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 2, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 14, 2015
Closed — Violation dismissed - BHazardous
§ 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition opening created east wall kitchen 4 sty west apt to adjoining apt decreasing occupancy of bldg.
Dec 8, 1988
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code refit door front entrance to bldg.
Mar 27, 1987
Closed — Violation closed - BHazardous
D26-10.01, 10.05 adm code arrange and make self-closing the doors front entrance to bldg.
Mar 27, 1987
Closed — Violation closed - BHazardous
D26-10.01, 10.05 adm code and dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes 3 sty balcony front.
Mar 27, 1987
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code properly secure the loose metal fence front of bldg.
Mar 27, 1987
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code properly repair the broken or defective metal fence front of bldg.
Mar 27, 1987
Closed — Violation closed - ANon-hazardous
D26-10.01 adm code replace with new the missing mortise lock front entrance door to bldg.
Mar 27, 1987
Closed — Violation closed - BHazardous
D26-10.01 adm code replace with new the missing ceramic tile floor 2 sty pub hall.
Jun 18, 1984
Closed — Violation closed - BHazardous
D26-10.01 adm code properly secure the loose 2 tread from bottom of stairs 1 to 2 sty pub hall.
Jun 18, 1984
Closed — Violation closed - ANon-hazardous
D26-21.03 adm code paint or post a sign indicating floors on wall near stairs pub hall all stys.
Jun 18, 1984
Closed — Violation closed
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 2
- Class - 1
At exposure 4, masonry wall has areas around 1st + 2nd floor windows with missing mortar, degradation of mortar and bricks appear to be loose., maintain exterior building wall
Mar 9, 2022 · Penalty $2,500
Resolve - Class - 2
Failure to provide appoved/accepted construction documents at job site at time of inspection.upon inspection observed work in progress on all floors by aprox 6 workers under active/posted permit #b00621029-i1-g
Feb 8, 2022
Resolve
Complaints
- Water leak
Heavy flow
Aug 3, 2026 · Apt 3R
Close - Unsanitary condition
Mold
Aug 3, 2026 · Apt 3R
Close - Water leak
Slow leak
Aug 3, 2026 · Apt 3R
Close - General
Janitor/super
Jun 13, 2025 · Apt GF
Close - Unsanitary condition
Garbage/recycling storage
Jun 13, 2025 · Apt GF
Close - Unsanitary condition
Garbage/recycling storage
Aug 13, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Aug 13, 2024 · Apt 1R
Close - General
Janitor/super
Apr 12, 2024 · Apt 1R
Close - Unsanitary condition
Sewage
Apr 11, 2024 · Apt 1R
Close - Plumbing
Sewer
Apr 8, 2024 · Apt 1R
Close
Show 34 more ↓
- Heat/hot water
Entire building
Mar 29, 2024 · Apt 1R
Close - Heat/hot water
Apartment only
Feb 18, 2024 · Apt 1R
Close - Heat/hot water
Apartment only
Jan 21, 2024 · Apt 1R
Close - General
Janitor/super
Jan 17, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Jan 17, 2024 · Apt 1R
Close - Unsanitary condition
Garbage/recycling storage
Jan 17, 2024 · Apt 1R
Close - General
Janitor/super
Dec 11, 2023 · Apt 1R
Close - General
Janitor/super
Oct 20, 2023 · Apt 1R
Close - Heat/hot water
Apartment only
Oct 9, 2023 · Apt 1R
Close - Heat/hot water
Apartment only
Oct 8, 2023 · Apt 1R
Close - Unsanitary condition
Pests
Jan 12, 2023 · Apt 1L
Close - Heat/hot water
Apartment only
Dec 14, 2022 · Apt 1R
Close - Heat/hot water
Apartment only
Nov 19, 2022 · Apt 1R
Close - Heat/hot water
Apartment only
Nov 18, 2022 · Apt 1R
Close - Heat/hot water
Apartment only
Nov 17, 2022 · Apt 1R
Close - Unsanitary condition
Pests
Oct 18, 2022 · Apt 1R
Close - Heat/hot water
Apartment only
Oct 3, 2022 · Apt 1R
Close - Unsanitary condition
Pests
Aug 31, 2022 · Apt 1R
Close - Electric
Power outage
Jun 29, 2022 · Apt 1R
Close - Heat/hot water
Apartment only
May 14, 2022 · Apt 1R
Close - Heat/hot water
Apartment only
Mar 28, 2022 · Apt 1R
Close - Heat/hot water
Entire building
Mar 27, 2022 · Apt 1R
Close - Unsanitary condition
Pests
Mar 24, 2022 · Apt 1R
Close - Heat/hot water
Entire building
Mar 22, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2022 · Apt 1R
Close - Heat/hot water
Entire building
Mar 21, 2022 · Apt BLDG
Close - Unsanitary condition
Pests
Mar 19, 2022 · Apt 1R
Close - Unsanitary condition
Pests
Mar 19, 2022 · Apt 1R
Close - Heat/hot water
Entire building
Mar 5, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2022 · Apt 1R
Close - Heat/hot water
Entire building
Mar 4, 2022 · Apt 1R
Close - Heat/hot water
Entire building
Oct 26, 2020 · Apt 1
Close - Heat/hot water
Entire building
Oct 25, 2020 · Apt 2
Close - Heating
Heat related
Mar 13, 2008 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1910
- Floors
- 4
- Residential units
- 8
- Building area
- 6,000 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2421 / 37
- Assessed value
- $1,536,750
- Landmark / historic district
- No
HPD registration #358969, last renewed Jul 23, 2026.
Questions about 245 South 3 Street
Who owns 245 South 3 Street?
The owner of record in NYC Department of City Planning PLUTO data is 245 South 3rd Owner LLC.
Does 245 South 3 Street have violations?
Yes. NYC HPD has recorded 23 housing violations at this property.
Is 245 South 3 Street rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 13% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 245 South 3 Street built?
City records list 1910 as the year it was built.
How many apartments are in 245 South 3 Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.