223 South 3 Street
Brooklyn, NY 11211BBL 3-02420-0037Map
Owner of record: Tifereth Rlty Corp
223 South 3 Street is a walk-up apartment building built in 1916 in Brooklyn, 11211. It has 36 residential units across 6 floors. The owner of record is Tifereth Rlty Corp. HPD has recorded 163 housing violations here, most recently on May 5, 2026. 5 of the 50 most recent violations are still open. City tax records listed 36 rent-stabilized apartments here in 2024.
- HPD violations
- 163
- DOB violations
- 17
- ECB violations
- 0
- HPD complaints
- 178
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 163
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 3, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 5b, 2nd story, 2nd apartment from west at north
Mar 7, 2026 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 5b, 2nd story, 2nd apartment from west at north
Mar 7, 2026 · Apt 5B
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of lockable knob at door preventing entrance to fire escape in the 1st room from north at west located at apt 5b, 2nd story, 2nd apartment from west at north
Mar 7, 2026 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Mar 7, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6b, 2nd story, 1st apartment from north at east
Mar 7, 2026 · Apt 6B
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at , at front areaway, 1st story
Feb 20, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule entrance , 1st story
Nov 19, 2025
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of wood wedge placed at vestibule door
Nov 3, 2025
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 6th story
Aug 2, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 6th story
Aug 2, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 2, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 6th story
Aug 2, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set door leading into court yard at public hall, 1st story
Jun 17, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at 1st public hall bulkhead from east, 6th story
Jun 17, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4f, 6th story, 2nd apartment from south at west
Jun 17, 2025 · Apt 4F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 6d, 4th story, 1st apartment from east at south
Jun 17, 2025 · Apt 6D
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at door to east yard at public hall, 1st story
Jun 10, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5b, 2nd story, 1st apartment from east at south
Jun 10, 2025 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of hasp and latch at bulkhead door at public hall, 6th story
Jun 10, 2025
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of plexi glass at skylight at public hall, 6th story
Jun 10, 2025
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective concrete staircase west at fire passage way
Jun 10, 2025
Open — Certification postponment denied - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6f, 6th story, 1st apartment from north at east
Jun 10, 2025 · Apt 6F
Open — Nov certified late - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at door at boiler room
Jun 10, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6b, 2nd story, 1st apartment from north at east
Jun 10, 2025 · Apt 6B
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st story
Jun 6, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at public hall, 1st story
Jun 6, 2025
Closed — Violation closed - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front yard
Jun 6, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
Apr 3, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire ratardant plaster at east wall at public hall stairs, 4th story
Apr 3, 2025
Open — Certification postponment denied - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall at public hall stairs, 4th story
Apr 3, 2025
Open — Certification postponment denied - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 26, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 11, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Mar 6, 2024
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3a, 1st story, 2nd apartment from west at north
Mar 6, 2024 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 2c, 3rd story, 1st apartment from south at west
Apr 12, 2023 · Apt 2C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2c, 3rd story, 1st apartment from south at west
Apr 12, 2023 · Apt 2C
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2c, 3rd story, 1st apartment from south at west
Apr 12, 2023 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 2c, 3rd story, 1st apartment from south at west
Apr 10, 2023 · Apt 2C
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum allowable temperature of 130 degrees in the entire apartment located at apt 2c, 3rd story, 1st apartment from south at west
Apr 10, 2023 · Apt 2C
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling (approx. 1 sq. ft.) in the bathroom located at apt 2c, 3rd story, 1st apartment from south at west
Apr 10, 2023 · Apt 2C
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling (approx. 1 sq. ft.) in the bathroom located at apt 2c, 3rd story, 1st apartment from south at west original violation 15913699 issued 10-apr-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 10, 2023 · Apt 2C
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroom located at apt 2c, 3rd story, 1st apartment from south at west
Apr 10, 2023 · Apt 2C
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and south wall in the bathroom located at apt 2c, 3rd story, 1st apartment from south at west
Apr 10, 2023 · Apt 2C
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approximately 1 sq.ft at ceiling in the bathroom located at apt 2c, 3rd story, 2nd apartment from east at south original violation 15907360 issued 06-apr-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Apr 6, 2023 · Apt 2C
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Apr 6, 2023
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 6, 2023
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 6, 2023
Closed — Violation closed
DOB building violations · 17
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active
Show 7 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Entire building
Apr 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 31, 2025 · Apt 5E
Close - Plumbing
Bathtub/shower
May 17, 2025 · Apt 3A
Close
Show 40 more ↓
- Heat/hot water
Entire building
Apr 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2024 · Apt BLDG
Close - Plumbing
Toilet
Aug 4, 2023 · Apt 3A
Close - Flooring/stairs
Floor
Jul 28, 2023 · Apt 3A
Close - Plumbing
Toilet
Jul 25, 2023 · Apt 3A
Close - Plumbing
Basin/sink
Jul 25, 2023 · Apt 3A
Close - Flooring/stairs
Floor
Jul 25, 2023 · Apt 3A
Close - Heat/hot water
Entire building
May 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
May 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
May 21, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
May 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 27, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 26, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2023 · Apt BLDG
Close - Electric
Lighting
Apr 7, 2023 · Apt 2C
Close - Water leak
Slow leak
Apr 7, 2023 · Apt 2C
Close - Paint/plaster
Wall
Apr 7, 2023 · Apt 2C
Close - Unsanitary condition
Mold
Apr 7, 2023 · Apt 2C
Close - Electric
Lighting
Apr 3, 2023 · Apt 2C
Close - Paint/plaster
Wall
Apr 3, 2023 · Apt 2C
Close - Unsanitary condition
Mold
Apr 3, 2023 · Apt 2C
Close - Paint/plaster
Wall
Apr 3, 2023 · Apt 2C
Close - Water leak
Slow leak
Apr 3, 2023 · Apt 2C
Close - Heat/hot water
Entire building
Mar 30, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 29, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
May 8, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 23, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 22, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 1, 2021 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 11, 2021 · Apt 6E
Close - Unsanitary condition
Pests
Jul 13, 2021 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1916
- Floors
- 6
- Residential units
- 36
- Building area
- 31,290 ft²
- Lot area
- 5,960 ft²
- Zoning
- R6
- Community board
- 301
- Council district
- 34
- Block / lot
- 2420 / 37
- Assessed value
- $1,353,600
- Landmark / historic district
- No
HPD registration #328649, last renewed Jul 1, 2025.
Questions about 223 South 3 Street
Who owns 223 South 3 Street?
The owner of record in NYC Department of City Planning PLUTO data is Tifereth Rlty Corp.
Does 223 South 3 Street have violations?
Yes. NYC HPD has recorded 163 housing violations at this property.
Is 223 South 3 Street rent stabilized?
NYC Department of Finance tax bills listed 36 rent-stabilized units here in 2024 (about 100% of its 36 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 223 South 3 Street built?
City records list 1916 as the year it was built.
How many apartments are in 223 South 3 Street?
It has 36 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.