55 Wythe Avenue
Brooklyn, NY 11249BBL 3-02283-0001Map
Owner of record: William Vale Owner LLC
55 Wythe Avenue is a hotel built in 2017 in Brooklyn, 11249. The owner of record is William Vale Owner LLC. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 41
- ECB violations
- 57
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 41
- Construction other optional
Borough commissioner has ordered all work stopped under permit #b00763013-i1 on 4/17/26, due to applicant withdrawal.
Apr 21, 2026
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 1, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 16, 2021
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed
Show 31 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 22, 2020
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 3, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Elevator elevatorrequired
Cease use
Jan 4, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 4, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 13, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2018
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 24, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 2017
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 17, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 11, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 25, 2015
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 20, 2010
Dob violation - dismissed
ECB violations · 57
- Class - 1
Failure to file evidence of compliance with workers comp law and/or disability benefits law.note:observed suspended scaffold opertions in progress with 3 scaffold platform in a raised position from ground 6 wor
May 3, 2021
Resolve - Class - 1
Illegaly engaging in any business or occupation without a required license or ther authorization.note:i observed suspended scaffold operation in progress with rigging foreman jesus more no enforcing caz at exp3
May 3, 2021
Resolve - Class - 2
Failure to maintain/display on site documents required by bc chapter33note:observed suspended scaffold operations exp3(north 13 street)with caz enfored by rigging foreman jesus moreno.upon request for designate
May 3, 2021 · Penalty $625
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
May 31, 2020 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
May 31, 2020 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
May 31, 2020 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
May 31, 2020 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
May 31, 2020 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
May 31, 2020 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
May 31, 2020 · Penalty $1,250
Resolve
Show 40 more ↓
- Class - 1
No door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dlm a
May 31, 2020 · Penalty $1,250
Resolve - Class - 1
05x10 repair door zone restrictor
Feb 11, 2019 · Penalty $3,125
Resolve - Class - 1
05x10,16x10. 05x10-repair door zone restrictor; 16x10-repair door positions monitoring.
Mar 21, 2018 · Penalty $1,250
Resolve - Class - 2
Bc3308.3 vertical safety netting not per code,damaged or inadequate.@ time of inspection noticed safety netting is missing & damaged in several place.rem provide the missing v safety netting & replace the damag
Nov 24, 2015
Resolve - Class - 2
Sidewalk shed doesnt meet code specification.@ time of inspection noted the side walk shed is not hunter green color.(covered by painted signage) all over the sidewalk parapet.rem follow the code
Nov 24, 2015 · Penalty $400
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.@ time of inspection observed all types of construction debris @ edge of bldg outside of vertical netting.pswo 10'away from edge from 1st to 22
Nov 5, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations.note:at the time of my inspection of a 21 story new building up to 21 story,i observed that there were workers (2) working on per
Sep 1, 2015 · Penalty $2,400
Resolve - Class - 1
3310.10.2 failure to provide osha 10.note:at the time of my inspectionof a 21 story building up to 21 story.observed two workers working on perimeter edge without and harness or safety measures in place.upon re
Sep 1, 2015 · Penalty $1,600
Resolve - Class - 2
3301.6 design.note:at the time of my inspection of 21 story new bulding at 21 story.i observed a steel c channal bolting onto the wall of elevator shaft with rope attached onto it for safety lifeline or elevato
Sep 1, 2015
Resolve - Class - 1
3303.7.2 fire extinguisher as per fire code.note:at the time of my inspection of a 21 story new building,at 21 story i observed that there were no fire extinguishers from the 21st floor to the 15th floor and th
Sep 1, 2015 · Penalty $1,600
Resolve - Class - 2
3301.4 inspection.note:at time of my inspection of a 21 srory new building up to 21 story.i observed concrete embedded straps installed from4th floor to 19th floor,and were being used by window installers & car
Sep 1, 2015
Resolve - Class - 2
Posting of unlawful signs,information,pictorial representation,business or advertising messages on protective structure. note: at the time of my inspection,i observed an advertising sign made of netting & secur
Aug 29, 2015 · Penalty $1,200
Resolve - Class - 1
Unlawfully continued work while on notice at a stop work order. as noted: at time of inspection on an active construction site,observe concrete deck at floor #11. continued to work while on notice of partial
Jun 26, 2015 · Penalty $1,600
Resolve - Class - 2
Bc28-104.7 submittal of construction documents as noted.@ time of inspection @ an active construction site details were observed that were not available on plans.insufficient (splie) length of (rebar) (dovvels)
Jun 24, 2015
Resolve - Class - 1
Unlawfully continued work while on notice of a stop work order. note: at the time of inspection of a 21 sty concrete bldg up to 11 fl level,i observed concrete pouring operation in progress at exp#4(wythe avenu
Jun 23, 2015
Resolve - Class - 1
Sec. 1906.2 inspection. note: at the time of inspection of a 21 sty bldg up to 11 sty. i observed workers on 11 fl repairing rebars & formwork & workers on the lower level 10 fl removing concrete in black garba
Jun 23, 2015 · Penalty $400
Resolve - Class - 1
Failure to provide protection at sides of excavation - at time of inspection at the above mentioned address i observed an active nb in progress. there are 2 areas along exp1 of the blg that have been excavated
Jun 16, 2015 · Penalty $800
Resolve - Class - 1
Bc1906.6 reshores in proximity to facade within 10',not secured - at time of inspection at the above mentioned address.i observed an activenb in progress. reshores installed at exp3 of the bldg on the 7th flr
Jun 16, 2015 · Penalty $800
Resolve - Class - 1
Failure to provide sidewalk shed where required - at time of inspection at the above mentioned address i observed an active nb in progress. building erected to the 11th flr working deck which according to eleva
Jun 16, 2015 · Penalty $4,800
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments. noted: at time of inspection of 21story steel encsed concrete bldg at 9thr has no overhead protection at exp1, which shows a
May 11, 2015 · Penalty $5,000
Resolve - Class - 1
Bc3303.8 standpipe during construction alteration or demolition: not maintained according to rules promulgated by the commissioner. at timeof insepction of proposed 21story bldg concrete forming 9flr has stand
May 11, 2015 · Penalty $1,600
Resolve - Class - 1
Use of supported scaffold w/o a scaffold uses certificate.noted: at time of inspection of 21story proposed concrete and steel bldg has formsat 9story for columns,has 2 workers on 4th flr interior at stairwell
May 11, 2015 · Penalty $1,600
Resolve - Class - 1
Bc3307.3,3307.6,2,3301.2 overhead protector for walkway and sidewalk. at time of inspection of 21styconcrete and steel bldg at 9th flr no overhead protection provided for workers on site at interior center plaz
May 11, 2015 · Penalty $1,600
Resolve - Class - 1
Bc3301.7 design required by the provision of chapter 33.noted:at time of inspection of 21 story proposed new bldg at 9th floor has 2 men working on shores holding in alumnium outrigger beams installed at 8th fl
May 11, 2015 · Penalty $1,600
Resolve - Class - 1
Bc3314.8 guardrail and toeboard.noted a 21story proposed concrete and steel bldg has 2stage supported scaffold at 4th flr interior at staircase with two workers on scaffold w/no guardrail or toeboards observed.
May 11, 2015 · Penalty $1,200
Resolve - Class - 1
33140902 foundation.at time of inspection of proposed 21 story concrete bldg at 9 sty has 2 stage supported pipe scaffold erected at interior of bldg of 4 flr has no baseplate foundation for supported pipe sca
May 11, 2015 · Penalty $400
Resolve - Class - 1
Work does not conform to approved construction documents &/or approvedamendments: as noted: at time of inspection observed elevator shaft platforms not build as per p.e. design #8 rebar to be spaced @ 12"oc on
May 5, 2015 · Penalty $1,000
Resolve - Class - 1
Failure to institute/maintain safety equipment or temporary construction.(no guardrails) as noted: at time of inspection at an active construction site observed at floor 8 opening in concrete slab & at grade
May 5, 2015 · Penalty $1,200
Resolve - Class - 1
Work does not conform to approved construction documents or approved amendments as noted: at time of inspection at an active construction site observed at floor #7 cantilever working platform missing secondary
May 5, 2015 · Penalty $1,000
Resolve - Class - 2
Failure to provide approved structural plans at construction site. observed temporary steel construction(shoring)for major structural elements w/no approved structural plans/details on site. remedy: issue parti
May 5, 2015
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. as noted: at time of inspection at an active construction site observe 2 workers at edge of concrete slab not wearing hardiness,
May 5, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements: asnoted: at time of inspection at active construction site at 7th & 8th fl inadequate housekeeping excessive debris/material wood,forms,pipe
May 5, 2015 · Penalty $2,400
Resolve - Class - 2
Sec. 28-104.7 submittal of construction documents as noted: at time ofinspection at an active construction site details were observed that were not available on plans: lack of beam to column rein forcement obse
May 5, 2015
Resolve - Class - 1
Sec. 1906.6.1.2 failure to secure reshores in 10ft proximity to the facade. as noted: at time of inspection at active construction site concrete reshores on 6th fl not secured to underside of deck w/i 10feet of
May 5, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. as noted: at time of inspection at active construction site no overhead protection at set back staging area,no overhead protectio
May 5, 2015 · Penalty $2,400
Resolve - Class - 2
Sec. 28-104.7 submittal of construction documents. reinspectoin call ceu at 212-393-2730 as noted: at time of inspecton on an active construction site observed 1)structural slab on 1st fl saw cut w/exposed stru
Mar 31, 2015 · Penalty $400
Resolve - Class - 1
Failure to safeguard all persons & property affected by const operating.as noted:@ time of insp @ an active const site observe concrete placement @ fl #2 perimeter walls.concrete pump operator standing @ edge o
Dec 4, 2014 · Penalty $12,000
Resolve - Class - 2
3301.7 failure to provide p.e. apprvd design drawings.as noted:at timeof inspec at an active construc site, concrete placement at floor #2 perimeter walls. observe a worker clening at edge of slab tie-off to an
Dec 4, 2014 · Penalty $4,000
Resolve - Class - 2
Bc28-105.5 forms filed w/dob do not have required signatures. as notedat time of inspn at an active construction site; concrete placement at2/f slab with 6,000 psi conc: tr1,tr2,tr3-technical reports for specia
Dec 2, 2014 · Penalty $4,000
Resolve - Class - 1
Sec. 1905.12 failure to provide cold weather protection for concrete. as noted: at time of inspection at an active construction site observed concrete placement at floor #2 slab,outside temp of 29f failure to
Nov 18, 2014 · Penalty $8,000
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- Hotel (HB)
- Year built
- 2017
- Floors
- 22
- Residential units
- —
- Building area
- 185,141 ft²
- Lot area
- 50,000 ft²
- Zoning
- M1-2
- Community board
- 301
- Council district
- 33
- Block / lot
- 2283 / 1
- Assessed value
- $48,745,350
- Landmark / historic district
- No
Questions about 55 Wythe Avenue
Who owns 55 Wythe Avenue?
The owner of record in NYC Department of City Planning PLUTO data is William Vale Owner LLC.
Does 55 Wythe Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 55 Wythe Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 55 Wythe Avenue built?
City records list 2017 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.