133 Lafayette Avenue
Brooklyn, NY 11205BBL 3-02102-0069Map
Owner of record: J.o.j. Holdings LLC
133 Lafayette Avenue is a mixed residential and retail building built in 1870 in Brooklyn, 11205. It has 6 residential units across 4 floors. The owner of record is J.o.j. Holdings LLC. HPD has recorded 369 housing violations here, most recently on April 22, 2026. 8 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2024.
- HPD violations
- 369
- DOB violations
- 30
- ECB violations
- 19
- HPD complaints
- 378
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 369
- BHazardous
Properly repair or replace the broken or defective glass pane at lower sash at 2nd window from north at west wall in the 1st room from north at west located at apt 4r, 4th story, 1st apartment from west at north
Apr 22, 2026 · Apt 4R
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electric wires at light fixture at ceiling in the 1st room from north at west located at apt 4r, 4th story, 1st apartment from west at north
Apr 22, 2026 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 4r, 4th story, 1st apartment from west at north
Apr 22, 2026 · Apt 4R
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Apr 22, 2026 · Apt 4R
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation , 1st riser from north at east wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Apr 22, 2026 · Apt 4R
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department , east wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Apr 22, 2026 · Apt 4R
Closed — Violation dismissed - BHazardous
Replace the broken or defective water closet tank cover in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Apr 22, 2026 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective radiator at north wall in the kitchen located at apt 4r, 4th story, 1st apartment from west at north
Apr 22, 2026 · Apt 4R
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet . in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Apr 22, 2026 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic watertank cover in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Mar 13, 2026 · Apt 4R
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4r, 4th story, 1st apartment from west at north
Mar 13, 2026 · Apt 4R
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective radiator valve cover at north wall in the kitchen located at apt 4r, 4th story, 1st apartment from west at north
Feb 8, 2026 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective water closet tank cover in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Feb 8, 2026 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door lock to basement at boiler room
Feb 8, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from north at west located at apt 4r, 4th story, 1st apartment from west at north
Feb 8, 2026 · Apt 4R
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from north at west located at apt 4r, 4th story, 1st apartment from west at north
Feb 8, 2026 · Apt 4R
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective radiator shut-off knob at north in the kitchen located at apt 4r, 4th story, 1st apartment from west at north
Oct 29, 2025 · Apt 4R
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4r, 4th story, 1st apartment from west at north
Dec 24, 2024 · Apt 4R
Open — Not complied with - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Dec 24, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash window at north wall. in the kitchen located at apt 4r, 4th story, 1st apartment from west at north
Oct 28, 2024 · Apt 4R
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 28, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Oct 28, 2024
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt 2f, 2nd story, 1st apartment from south at west
Oct 4, 2024 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the private hallway located at apt 4r, 4th story, 1st apartment from west at north
Aug 27, 2024 · Apt 4R
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from north at east wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Aug 27, 2024 · Apt 4R
Open — Defect letter issued - BHazardous
Provide operable knob at door at west wall allowing re-entry from roof to public hall stairs
Aug 27, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective catch at window at west wall in the kitchen located at apt 2f, 2nd story, 1st apartment from south at west
Aug 27, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
Aug 27, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west
Aug 27, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash window at 1st and 2nd window from west at north wall in the 1st room from north at east located at apt 4r, 4th story, 1st apartment from west at north
Aug 27, 2024 · Apt 4R
Closed — Violation closed - BHazardous
Provide approved metal screen below skylight at roof
Aug 27, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west
Aug 27, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance at window at west wall in the bathroom located at apt 2f, 2nd story, 1st apartment from south at west
Aug 27, 2024 · Apt 2F
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective lock and latch set at door in the entrance located at apt 4r, 4th story, 1st apartment from west at north
Aug 27, 2024 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Properly secure the loose upper base cabinets at east wall in the kitchen located at apt 4r, 4th story, 1st apartment from west at north
Aug 27, 2024 · Apt 4R
Closed — Violation closed - BHazardous
Properly secure the loose faucet at bathtub in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Aug 27, 2024 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door , 1st story
Mar 22, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building front entrance door , 1st story
Mar 12, 2024
Closed — Violation closed - BHazardous
§27-2033.3(b) correct failure to install an internet capable temperature reporting device in one living room in apartment ... located at apt 4r, 4th story, 1st apartment from west at north
Nov 8, 2023 · Apt 4R
Closed — Violation dismissed - BHazardous
Replace with new the missing wooden base cabinet door at east wall in the kitchen located at apt 4r, 4th story, 1st apartment from west at north
Nov 8, 2023 · Apt 4R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Nov 8, 2023 · Apt 4R
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at east wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Nov 8, 2023 · Apt 4R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 4th story
Oct 8, 2023
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 4th story
Oct 8, 2023
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4r, 4th story, 1st apartment from west at north
Oct 8, 2023 · Apt 4R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 1st room from north at west located at apt 4r, 4th story, 1st apartment from west at north
Oct 8, 2023 · Apt 4R
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from north at west located at apt 4r, 4th story, 1st apartment from west at north
Oct 8, 2023 · Apt 4R
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Oct 8, 2023 · Apt 4R
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 2 sq ft at ceiling and north wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north
Oct 8, 2023 · Apt 4R
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approx 2 sq ft at ceiling and north wall in the bathroom located at apt 4r, 4th story, 1st apartment from west at north original violation 16295174 issued 08-oct-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 8, 2023 · Apt 4R
Closed — Violation closed
DOB building violations · 30
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Construction other optional
Failure to maintain building in code complaint manner/provide maintain fire stopping
Oct 13, 2020
Dob violation - dismissed - Construction other optional
Failure to maintain building in code complaint manner/make all necessa ry repairs throughout provide structural engineer report
Oct 13, 2020
Dob violation - dismissed - Construction other optional
Failure to maintain building wall(s) or appurentances/make all necessa ry repairs provide structural engineer report
Oct 13, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed - Construction other optional
Failure to comply with commissioner order # 315720 issued on 6-5-19 for the evaluation of the building and legalization of shoring at cellar level under permit no later than 7-3-19. no permit has been obtained as of 7-10-19. comply with commissioner order # 315720 immediately
Jul 10, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed
Show 20 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 9, 2019
Dob violation - dismissed - Construction other optional
Ftm:lndmrk mixed use.at cellar level was observed that non-engineered structural work was done without permit.temporary posts and 1st floor joist and 1fl plank-diaphragm were installed.owner has to engage pe& endorsed contr to eval whole bldg.obtain permits to repair/legalize work n/l/than 7/3/19. permit sign off no later than 8/26/19
Jun 5, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 31, 2018
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jan 22, 2014
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jan 22, 2014
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jan 22, 2014
Dob violation - dismissed - Landmark none
Landmk-landmark none
Jan 22, 2014
Dob violation - active - Construction other optional
Work without a permit remedy; stop all work immediately, make site safe at 1st flr. repair/s hore bowed an dsplit wood ceiling joists
Nov 23, 2009
Vw*-violation - work w/o permit dismissed - Landmark none
Landmk-landmark none
Oct 9, 2009
Dob violation - active - Landmark none
Landmk-landmark none
Sep 28, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Landmark none
Landmk-landmark none
Aug 11, 2000
Dob violation - active - Landmark none
Landmk-landmark none
Feb 27, 1998
Dob violation - dismissed - Landmark none
Landmk-landmark none
Feb 27, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - active - Landmark none
Landmrk-landmark none
May 14, 1984
Dob violation - dismissed - Landmark none
Landmk-landmark none
May 14, 1984
Dob violation - dismissed
ECB violations · 19
- Class - 2
Failure to maintain building walls or appurtenances at 2nd fl lvl in corner one hole in brick wall.at cumberland st 2nd lvl one vertical crack approx 2'-0" long in groun level crack in ground(horizontal crack)a
Jul 28, 2020 · Penalty $625
Resolve - Class - 1
Failure to maintain building in a class complaint manner. @time of inspection, @cellar lvl wood joist @first fl lvl was been observed improperly & inadeqautely vertically supported with 2*3 & 2-4 make shift
Nov 6, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in a code compliant manner: no fire stopping per bc 712.3; 27-345. @time of inspection missing fire stopping observed through out cellar lvl. leaving wooden joist exposed hazardous
Nov 6, 2019 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in a code compliant maner. @time of inspection missing mortar observed @mortar joins on the chimeny stack rear elevation northern side of the building @exp#3. leaving gaps between
Nov 6, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply withe the commissioner order contained in summons/violation #35484674m issued on 4-86-2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-10.for failure to maintain
Jul 17, 2019
Resolve - Class - 2
Failure to comply with the commissioners order contaiend in summons/violation 335384572z issued on 4-08-2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.comply with commissione
Jul 17, 2019
Resolve - Class - 2
Failure to comply with the commissioners order contaiend in summons/violation #35384573k issued on 4-08-2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.comply with commissione
Jul 7, 2019
Resolve - Class - 1
Failure to maintain building in code compliant manner:at time of inspection observed beams shoring installed inadequate using 2x4 wood at cellar also observe busten beams at cellar causing structure defect from
Apr 8, 2019
Resolve - Class - 1
Failure to maintain building in code compliant manner:no fire storing per bc 712.3;27-345 at time of inspection observed missing fire stopping material throughout at ceiling at cellar.provide fire stopping mate
Apr 8, 2019
Resolve - Class - 1
Failure to maintain building wall:at time of inspection observed multiple crack at brick wall at exposure 2.also observed crack at brick wall at exposure 3 and also at chimney at exposure 3.provide report for
Apr 8, 2019
Resolve
Show 9 more ↓
- Class - 1
An unlawful act,failure to comply with an order of the commissioner.failure to correct summons #35346177l issued on 8/9/18 for (having)open 1900 boxes and other boxes uncover and for missing cover on the elctri
Sep 25, 2018
Resolve - Class - 1
Unapproved/unsafe/unsuitable electrical equipments,apparatus,materialsdevices,appliances or wiring in use. observed in the basement meters missing covers to its live section, many open 1900 boxes it the ceilin
Aug 9, 2018
Resolve - Class - 2
Fail to maintain bldg in code-compliant manner re:installation/maintenance of plumbing materials/equipment per pc 102.3;27-902.i observed incommercial space which is prohibited & not code-compliant *photo taken
May 30, 2018
Resolve - Class - 2
Work without a permit. observed: in the cellar of four story building at exposure #2 at rear installed wood beam to support floor on 1st floor of the building. constructed two columns from concrete blocks below
May 24, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner.i observed gas turned off entire bldg due to multiple leaks that were found by utility company.gas was turned off on 04/3/18 & no permits on file or pre-filed w
Apr 13, 2018 · Penalty $312
Resolve - Class - 1
Failure to maintain building in code complaint manner.observed floor joist under(1st)floor (cellar ceiling)are defective and structurally compromised,also observed cellar ceiling leaking point of (loft expo #1
Mar 12, 2018
Resolve - Class - 1
Failure to maintain bldg code compliant manner.at time of inspection observed in expo#2the cellar door is sloping and making a gap between ground and bldg.front of car is limo office can collapse in use w/any
Mar 10, 2018
Resolve - Class - 1
Failure to maintain building in code-complaint manner. note: 10-15 wood flr joints are bowed,split severely & out of plumb approx 3 1/2 inches at 2nd flr (visible from 1st flr commercial) in danger of colloapse
Nov 23, 2009
Resolve - Non-hazardous
B4a/50a. (50a) holes in boiler room walls and ceilings need repair.
Jul 8, 2005
Resolve
Complaints
- Plumbing
Toilet
Feb 7, 2026 · Apt 4R
Close - Plumbing
Radiator
Feb 7, 2026 · Apt 4R
Close - Heat/hot water
Apartment only
Feb 7, 2026 · Apt 4R
Close - Heat/hot water
Apartment only
Dec 4, 2025 · Apt 4R
Close - Heat/hot water
Apartment only
Oct 28, 2025 · Apt 4R
Close - Electric
Power outage
Jul 17, 2025 · Apt 4R
Close - Electric
Outlet/switch
Jul 17, 2025 · Apt 4R
Close - Plumbing
Toilet
Jul 17, 2025 · Apt 4R
Close - Plumbing
Toilet
Jul 17, 2025 · Apt 4R
Close - General
Mailbox
Jul 9, 2025 · Apt 4R
Close
Show 40 more ↓
- Plumbing
Toilet
Jul 9, 2025 · Apt 4R
Close - Unsanitary condition
Mold
Jul 9, 2025 · Apt 4R
Close - Door/window
Door
Jul 9, 2025 · Apt 4R
Close - Plumbing
Toilet
Jul 9, 2025 · Apt 4R
Close - Door/window
Door
Jul 9, 2025 · Apt 4R
Close - Unsanitary condition
Mold
Jul 9, 2025 · Apt 4R
Close - Electric
Power outage
Jun 24, 2025 · Apt 4R
Close - Heat/hot water
Entire building
Jan 9, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 21, 2024 · Apt 4R
Close - Plumbing
Bathtub/shower
Sep 26, 2024 · Apt 2F
Close - Plumbing
Bathtub/shower
Sep 26, 2024 · Apt 2F
Close - Plumbing
Basin/sink
Sep 26, 2024 · Apt 2F
Close - Plumbing
Bathtub/shower
Sep 21, 2024 · Apt 2F
Close - Heat/hot water
Entire building
Apr 9, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 5, 2024 · Apt 4R
Close - Water leak
Slow leak
Oct 3, 2023 · Apt 4R
Close - Electric
Power outage
Sep 3, 2023 · Apt 2F
Close - Electric
Power outage
Jul 27, 2023 · Apt 4R
Close - Electric
Power outage
Jul 26, 2023 · Apt 4R
Close - Electric
Power outage
Apr 22, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 15, 2023 · Apt 4R
Close - General
Signage missing
Jan 30, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jan 30, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 26, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Dec 14, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Nov 16, 2022 · Apt 4R
Close - Door/window
Door
Sep 29, 2022 · Apt 3F
Close - Door/window
Door
Sep 29, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Mar 3, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Feb 26, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Feb 26, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Feb 22, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Feb 14, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Feb 11, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Feb 7, 2022 · Apt 3R
Close - Heat/hot water
Apartment only
Feb 7, 2022 · Apt 4B
Close - Plumbing
Water supply
Feb 4, 2022 · Apt 2F
Close - Heat/hot water
Apartment only
Jan 26, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Jan 15, 2022 · Apt 4RAPT
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1870
- Floors
- 4
- Residential units
- 6
- Building area
- 7,000 ft²
- Lot area
- 1,950 ft²
- Zoning
- R6B
- Community board
- 302
- Council district
- 35
- Block / lot
- 2102 / 69
- Assessed value
- $1,836,900
- Landmark / historic district
- Fort Greene Historic District
HPD registration #314626, last renewed Jan 14, 2026.
Questions about 133 Lafayette Avenue
Who owns 133 Lafayette Avenue?
The owner of record in NYC Department of City Planning PLUTO data is J.o.j. Holdings LLC.
Does 133 Lafayette Avenue have violations?
Yes. NYC HPD has recorded 369 housing violations at this property.
Is 133 Lafayette Avenue rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2024 (about 83% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 133 Lafayette Avenue built?
City records list 1870 as the year it was built.
How many apartments are in 133 Lafayette Avenue?
It has 6 residential units and 8 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.