286 Clinton Avenue
Brooklyn, NY 11205BBL 3-01915-0063Map
Owner of record: 5535 - 286-290 Clinton Avenue Brooklyn L Lc
286 Clinton Avenue is a walk-up apartment building built in 1871 in Brooklyn, 11205. It has 35 residential units across 5 floors. The owner of record is 5535 - 286-290 Clinton Avenue Brooklyn L Lc. HPD has recorded 144 housing violations here, most recently on September 9, 2026. 8 of the 50 most recent violations are still open. City tax records listed 15 rent-stabilized apartments here in 2024.
- HPD violations
- 144
- DOB violations
- 36
- ECB violations
- 21
- HPD complaints
- 263
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 144
- BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 1, 1st story, 1st apartment from north at east
Sep 9, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Sep 9, 2026 · Apt 1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from north at east
Sep 9, 2026 · Apt 1
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 1, 1st story, 1st apartment from north at east
Sep 9, 2026 · Apt 1
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet obsered at east and south wall at south closet in the private hallway located at apt 1, 1st story, 1st apartment from north at east
Sep 9, 2026 · Apt 1
Open — Notice of issuance sent to tenant - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Aug 16, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door
Aug 16, 2026
Closed — Violation closed - BHazardous
Refit door in the entrance located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective air valve at radiator in the 2nd room from north located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood cabinet at west wall in the kitchen located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at sink in the kitchen located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective air valve at radiator in the 1st room from north located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective at radiator in the 1st room from north located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective at radiator in the 2nd room from north located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator and heat riser in the 1st room from north located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator in the 2nd room from north located at apt 4a, 4th story, 1st apartment from south at west
Feb 1, 2024 · Apt 4A
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 17, 2022
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Aug 17, 2022
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective paited sprinkler head in the kitchen located at apt 3b, 3rd story, 2nd apartment from east at south
Aug 10, 2022 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Aug 10, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 3b, 3rd story, 2nd apartment from east at south
Aug 10, 2022 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors , in the entrance located at apt 3b, 3rd story, 1st apartment from south at west
Sep 3, 2021 · Apt 3B
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate located at apt 1b, 1st story, 2nd apartment from west at north
Aug 27, 2021 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors in the entrance located at apt 1b, 1st story, 2nd apartment from west at north
Aug 27, 2021 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Code: arrange and make self-closing the doors in the entrance located at apt 1c, 1st story, 1st apartment from west at north
Aug 27, 2021 · Apt 1C
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate located at apt 1c, 1st story, 1st apartment from west at north
Aug 27, 2021 · Apt 1C
Open — Not complied with - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 3b, 3rd story, 2nd apartment from east at south
Mar 29, 2021 · Apt 3B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 3b, 3rd story, 2nd apartment from east at south
Mar 29, 2021 · Apt 3B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 1st room from north located at apt 5b, 5th story, 1st apartment from south at west
Feb 16, 2021 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entrance located at apt 5b, 5th story, 1st apartment from south at west
Feb 16, 2021 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 3c, 3rd story, 2nd apartment from south at west
Feb 3, 2021 · Apt 3C
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at 1st and 4th stories at public hall
Oct 2, 2020
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors at entrance located at apt 3a, 3rd story, 1st apartment from east at south
Aug 26, 2020 · Apt 3A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at entrance located at apt 2b, 2nd story, 2nd apartment from east at south
Aug 26, 2020 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors at entrance located at apt 2c, 2nd story, 1st apartment from south at west
Aug 26, 2020 · Apt 2C
Closed — Violation closed - BHazardous
§ 185, 240 m/d law properly fire retard in accordance with the rules and regulations of this department the cellar ceiling east
Aug 26, 2020
Open — First no access to re- inspect violation - CImmediately hazardous
Arrange and make self-closing the doors at building entrance , 1st story
Aug 6, 2020
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, walls and trims throughout in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Jul 30, 2020 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing electrical ceiling fixture in the 1st room from north at east located at apt 3a, 3rd story, 1st apartment from north at east
Jul 30, 2020 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at the ceiling in the 1st room from north at east located at apt 3a, 3rd story, 1st apartment from north at east
Jul 30, 2020 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Jul 30, 2020 · Apt 3A
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Feb 10, 2020
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Feb 10, 2020
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entrance located at apt 4a, 4th story, 1st apartment from east at south
Dec 10, 2019 · Apt 4A
Closed — Violation dismissed
DOB building violations · 36
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 7, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 24, 2019
Dob violation - dismissed - Construction other optional
Failure to comply: masn bearing wall w/wood joist tenement bldg on jan 2018 western brick bearing wall facing dekalb ave became unsafe bldgto be vacated& shor& exist wall removed& reconst owner has not complied with the self rescind emerg by not reconstruct wall remedy:comply with code immediately comply with violation
Dec 6, 2018
Dob violation - dismissed - Construction other optional
Failure to comply:3525287r 5st masonry bearing wall with wood joist tenement bldg on jan 2018 western brick bearing wall facing dekalb ave became unsafe building to be vacated&shored&existing wall removed and reconstructed owner has not complied with the self declared emergency by not reconst wall remedy:comply with code immediately with violation
Dec 6, 2018
Dob violation - dismissed - Construction other optional
Fail to comp w/comm order.on 1/27/18 bldg ownership,thru engr's t tomasetti notified dob that unsafe cond exist on side wall of 290 clinton ave,masonry bear wall unstable&bldg own vacate bldg.as of 5/22/18,no rpr drgs prep by t/t have been perm.remedy:immed reconcile drgs ensure perm for emerg rprs undertaken wall be removed&replaced
May 22, 2018
Dob violation - dismissed - Construction other optional
Fail to comp w/comm order.on 1/27/18 bldg ownership thru engr's t tomasetti,notified dob that unsafe cond exist on sidewall of 290 clinton ave.masonry bear wall unstable&bldg own vacate bldg.as of 5/22/18 no rpr drgs prep by tt been perm.remedy:immed reconcile drgs ensure perm for emerg rprs undertaken so wall can be removed&replaced
May 22, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 2, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 10, 2018
Dob violation - dismissed - Immediate emergency anythingoptional
Ftm/sws
Sep 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 23, 2014
Dob violation - dismissed
Show 26 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Landmark none
Landmk-landmark none
Sep 28, 2007
Dob violation - dismissed - Landmark none
Landmk-landmark none
Sep 28, 2007
Dob violation - dismissed - Landmark none
Landmk-landmark none
Sep 28, 2007
Dob violation - dismissed - Landmark none
Landmk-landmark none
Sep 28, 2007
Dob violation - dismissed - Landmark none
Landmk-landmark none
Sep 28, 2007
Dob violation - dismissed - Landmark none
Landmk-landmark none
Sep 28, 2007
Dob violation - dismissed - Landmark none
Landmk-landmark none
Sep 28, 2007
Dob violation - dismissed - Landmark none
Landmk-landmark none
Sep 28, 2007
Dob violation - dismissed - Landmark none
Landmk-landmark none
Sep 28, 2007
Dob violation - dismissed - Landmark none
Landmk-landmark none
Sep 28, 2007
Dob violation - dismissed - Landmark none
Landmk-landmark none
Sep 28, 2007
Dob violation - dismissed - Landmark none
Landmk-landmark none
Sep 28, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 21
- Class - 2
Sec. 3314.1 supported scaffold does not meet code specification. note:@ time of inspection i observed supported scaffold w/the following objections. loose unsecured planks-not fully planked-missing guardrails.
Aug 7, 2019
Resolve - Class - 2
Sec. 3307.1 sidewalk shed does not meet code specification. note: at time of inspection i observed sidewalk shed w/the following objections. items left on deck items include scaffold counter weights,decorative
Aug 7, 2019
Resolve - Class - 2
Failure to maintain adequate housekeeping per requirements. note: @ time of inspection i observed housekeeping/egress objections-plywood/sheetrock in hallways-power tools & electrical cords in walking areas.
Aug 7, 2019
Resolve - Class - 2
Failure to comply with the commissioners order contaiend in summons/violation #35416536pissued on 4-30-2019 and to file a certificate of co rrection pursuant to 28-201.1 and 1rcny 102-01.comply with commissione
Jul 17, 2019 · Penalty $625
Resolve - Class - 1
Failure to provide sidewalk shed where required at time of inspection observed 2 workers at front corner of exposure 4 working repointing brick facade off a suspended scaffold w/no sidewalk shed over adjacent
May 8, 2019 · Penalty $10,000
Resolve - Class - 2
Failure to notify dept prior to installation off removal of suspended scaffold. at time of inspection observed worker repointing brick work at exposure 4 working off a suspended scaffold upon checking dob data
May 8, 2019 · Penalty $2,500
Resolve - Class - 1
Unlawfully continued work while under a particial stop work ordr four man found violating order #042119c02rf01, 042119c02rf02, 042119c02rf03.working @the scaffold erected @backyard, working on 04/29/2019.
Apr 30, 2019 · Penalty $5,000
Resolve - Class - 2
Work without a permit. expired permit. observed sidewalk shed erected at exposure 2 on the dekalb ave sidwalk with permit # booo59863 expired on 3-31-19 remedy: renew permit.
Apr 21, 2019
Resolve - Class - 2
Work without permit. expired permit. observed construction fence erected on dekalb ave (exposure 2 with permit # booo71276 expired 3-31-19. renew permit.
Apr 21, 2019
Resolve - Class - 2
Work without a permit. expired permit. observed pipe scaffold erected at exposure 2 and 3 to full height of 5 story building under permit # booo59872 permit expired on 3-31-19. remedy: renew permit.stop all
Apr 21, 2019
Resolve
Show 11 more ↓
- Class - 1
Failure to maintain:290 clinton ave bklyn,is a 5 story multiple dwelling,located on clinton ave & dekalb ave.on 1/25/18 owner eng notified dept of unsafe wall on dekalb ave side.on 1/26/18 the writer visited th
Jan 26, 2018 · Penalty $1,000
Resolve - Class - 2
Failure to comply w/comm's order contained in summ/vio#35263392k issued on 10/17/17 and to file and cofc pursuant to 28-201.1 &1rcny 102-01.failure to maintain bldg walls and or appurtenances.note;at 1st floor
Nov 25, 2017 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. noted: at 1st fl of bldg at exp#2,large cracks appear at side door & window also noted large bulge in wall appears at 1st fl exp#2 w/large separations of wall &
Oct 17, 2017 · Penalty $1,000
Resolve - Class - 2
Failure to maintain exterior bldg wall in that on left side of bldg at1st flr entrance door.section of brickwork is cracked and bulging.rem:make safe immediately make all necessary repairs,maintain building.
Mar 7, 2017 · Penalty $500
Resolve - Class - 2
Underside lit. pedestrian protection does not meet code specifications. lighting is required at all times either natural or illumination. note: at time of inspection 3am i observed sidewalk shed in place or exp
Dec 8, 2016 · Penalty $2,400
Resolve - Class - 2
Failure to maintain bldg. noted: at 3rd tier,left side front of bldg,found brick facade section approx 2ft x 6ft bulging,out of plumb for approx 2in. remedy: repair defects forthwith & maintain bldg.
Sep 29, 2016 · Penalty $500
Resolve - Class - 2
B254,36,16
May 27, 2015 · Penalty $1,250
Resolve - Class - 2
B254,15,32a,34b,24b,16
May 27, 2015 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35091316k issued on 4/27/14 pursuant to 28-204.4 & 1rcny 102-01. (s.o.) masonry wall bulge & vertic
Jul 31, 2014 · Penalty $2,000
Resolve - Class - 1
Failure to maintain bldg wall(s) @ the south elevation 1st fl level masonry wall is bulging w/vertical crack above window lentel (n/e corner window) approx 2'l x 1/8" wide. previous viol written 070912cz2sh01 (
Apr 27, 2014 · Penalty $500
Resolve - Class - 3
Failure exterior building wall on the south wall exposure 2 observed bulging over 1st windos cracked brick also observed some area defects observed (1) on the dekalb ave side of structure. remedy: make site
Jul 9, 2012 · Penalty $250
Resolve
Complaints
- Electric
Power outage
Aug 13, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 13, 2026 · Apt BLDG
Close - Electric
Power outage
Aug 13, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Aug 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 8, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 8, 2025 · Apt 2C
Close - Unsanitary condition
Pests
Jun 12, 2024 · Apt 3A
Close - Unsanitary condition
Pests
Jan 23, 2024 · Apt 4A
Close - General
Cabinet
Jan 23, 2024 · Apt 4A
Close - Safety
Carbon monoxide detector
Jan 23, 2024 · Apt 4A
Close
Show 40 more ↓
- Flooring/stairs
Floor
Jan 23, 2024 · Apt 4A
Close - Paint/plaster
Wall
Jan 23, 2024 · Apt 4A
Close - Appliance
Electric/gas range
Dec 9, 2023 · Apt 2B
Close - Heat/hot water
Entire building
Feb 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2022 · Apt 2A
Close - Heat/hot water
Entire building
Jan 18, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt 2C
Close - Heat/hot water
Apartment only
Nov 2, 2021 · Apt 2C
Close - Heat/hot water
Entire building
Oct 26, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2021 · Apt 3B
Close - Heat/hot water
Apartment only
Feb 1, 2021 · Apt 3C
Close - Heat/hot water
Apartment only
Jan 21, 2021 · Apt 3C
Close - Heat/hot water
Entire building
Sep 30, 2020 · Apt 5B
Close - Heat/hot water
Apartment only
Feb 4, 2020 · Apt 2B
Close - Heat/hot water
Apartment only
Feb 3, 2020 · Apt 2B
Close - Plumbing
Water supply
Nov 8, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 23, 2019 · Apt 4A
Close - Heat/hot water
Entire building
Oct 15, 2019 · Apt 2A
Close - Electric
No lighting
Jun 18, 2019 · Apt 3B
Close - General
Ventilation system
May 20, 2019 · Apt 3B
Close - Heat/hot water
Entire building
Feb 3, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2019 · Apt 2A
Close - Heat/hot water
Entire building
Jan 26, 2019 · Apt 3A
Close - Paint/plaster
Wall
Jul 31, 2018 · Apt 1B
Close - Paint/plaster
Ceiling
Jul 31, 2018 · Apt 1B
Close - Paint/plaster
Wall
Jul 23, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
May 27, 2018 · Apt 5B
Close - Heat/hot water
Entire building
May 19, 2018 · Apt 5B
Close - Heat/hot water
Entire building
Apr 29, 2018 · Apt 2C
Close - Heat/hot water
Entire building
Apr 19, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 18, 2018 · Apt 1B
Close - Heat/hot water
Entire building
Apr 6, 2018 · Apt 4B
Close - Heat/hot water
Entire building
Apr 6, 2018 · Apt 2B
Close - Heat/hot water
Entire building
Mar 27, 2018 · Apt 1B
Close - Heat/hot water
Entire building
Mar 27, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 25, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 24, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 19, 2018 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1871
- Floors
- 5
- Residential units
- 35
- Building area
- 17,968 ft²
- Lot area
- 7,844 ft²
- Zoning
- R6B
- Community board
- 302
- Council district
- 35
- Block / lot
- 1915 / 63
- Assessed value
- $2,385,000
- Landmark / historic district
- Clinton Hill Historic District
HPD registration #313379, last renewed Jul 10, 2025.
Questions about 286 Clinton Avenue
Who owns 286 Clinton Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 5535 - 286-290 Clinton Avenue Brooklyn L Lc.
Does 286 Clinton Avenue have violations?
Yes. NYC HPD has recorded 144 housing violations at this property.
Is 286 Clinton Avenue rent stabilized?
NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 43% of its 35 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 286 Clinton Avenue built?
City records list 1871 as the year it was built.
How many apartments are in 286 Clinton Avenue?
It has 35 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.