roofy

14 Spencer Court

Brooklyn, NY 11205BBL 3-01778-0021Map

Owner of record: Zev Goldstein LLC

14 Spencer Court is a walk-up apartment building built in 1899 in Brooklyn, 11205. It has 10 residential units across 5 floors. The owner of record is Zev Goldstein LLC. HPD has recorded 76 housing violations here, most recently on May 5, 2026.

HPD violations
76
DOB violations
1
ECB violations
4
HPD complaints
95

What to know

Good
No open Class C

No open immediately-hazardous violations among recent records.

Good
Last violation May 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

No rent-stabilized units in 2018–2024 tax bills

Some apartments can still be regulated. Use the rent-stabilized checker or request the rent history from HCR.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 76

  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 5, 2026

    Closed — Violation dismissed
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots, 2nd story balcony, at building front at fire escape

    Sep 11, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    May 13, 2025

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    May 13, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    May 13, 2025

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    May 13, 2025

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    May 13, 2025

    Closed — Violation dismissed
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    May 13, 2025

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 13, 2021

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective wood floor at radiator, sinking at south wall in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from south at west

    Apr 19, 2013 · Apt 2

    Closed — Violation closed
Show 40 more ↓
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster board ceiling over radiator in the 1st room from north at west located at apt 1fl, 1st story

    Apr 19, 2013 · Apt 1FL

    Closed — Violation closed
  • C

    Properly repair the source and abate the evidence of a water leak cascading water leak from above the ceiling in the 1st room from north at west located at apt 1fl, 1st story

    Apr 19, 2013 · Apt 1FL

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all walls ceiling and trim throughout in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from south at west

    Apr 19, 2013 · Apt 2

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color unkeyed plaster board ceiling in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from south at west

    Apr 19, 2013 · Apt 2

    Closed — Violation closed
  • C

    Repair the broken or defective connection hot water and steam is escaping at the supply lines to west radiator in the 1st room from north at west located at apt 2, 2nd story, 1st apartment from south at west

    Apr 19, 2013 · Apt 2

    Closed — Violation closed
  • C

    Remove all obstructions and repair all defects in the house plumbing, waste line at sink in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Apr 19, 2013 · Apt 2

    Closed — Violation closed
  • C

    Replace with new the broken or defective wood door installed in the entrance located at apt 2, 2nd story, 1st apartment from south at west

    Apr 19, 2013 · Apt 2

    Closed — Violation closed
  • C

    Repair the broken or defective connection the waste line under sink in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Apr 19, 2013 · Apt 2

    Closed — Violation closed
  • C

    Properly repair the broken or defective hot water heater at boiler room

    Apr 19, 2013

    Closed — Violation closed
  • B

    § 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition , a class (a) dwelling unit created increasing occupancy from (3) to (4), unit unoccupied at cellar

    Aug 22, 2012

    Closed — Violation closed
  • B

    Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections bathroom and kitchen fixtures installed and functional, at a class (a) apt created at cellar

    Aug 22, 2012

    Closed — Violation closed
  • C

    Provide seal all accessible door and window openings throughout in the entire apartment located at apt 3, 3rd story, 1st apartment from south at west

    Aug 22, 2012 · Apt 3

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration wood and plaster boaed partitians creating a class (a) dwelling at cellar

    Aug 22, 2012

    Closed — Violation closed
  • C

    Trace and repair the source and abate the nuisance consisting of mold ... and mildew throughout lower walls at cellar

    Aug 22, 2012

    Closed — Violation dismissed
  • C

    Properly repair and abate unsafe electric wiring condition consisting of illegal wire tampering at electircal meters at basement

    Aug 17, 2012

    Closed — Violation closed
  • B

    Repair the leaky and/or defective faucets at bath tub in the bathroom located at apt 2, 2nd story, apartment at west

    Aug 17, 2012 · Apt 2

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiliing in the 3rd room from east at north located at apt 2, 2nd story, apartment at west

    Aug 17, 2012 · Apt 2

    Closed — Violation closed
  • C

    Provide seal up at all openings in the entire apartment located at apt 3, 3rd story, apartment at west

    Aug 17, 2012 · Apt 3

    Closed — Violation closed
  • C

    Repair the roof so that it will not leak at ceiling in the 3rd room from east at south located at apt 3, 3rd story, apartment at west

    Aug 17, 2012 · Apt 3

    Closed — Violation closed
  • C

    Trace and repair the source and abate the nuisance consisting of mold ... at entire north wall at basement

    Aug 17, 2012

    Closed — Violation closed
  • C

    Remove the illegal fastening , double cylinder key operated lockset at metal wrought iron gate from street entrance to building

    Aug 30, 2011

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of a concealed water leak from above ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Aug 23, 2011 · Apt 2

    Closed — Violation closed
  • C

    Fire escape defective. replace with new the broken, defective and/or missing goose neck brace, north side at west fire escape at roof rear

    Aug 23, 2011

    Closed — Violation closed
  • C

    Remove the illegal fastening (2) padlockable hasp's installed and padlocked at scuttle to roof at 3rd. sty. at public hall

    Aug 23, 2011

    Closed — Violation closed
  • C

    Repair the roof so that it will not leak at skylite, 1st from south at east at roof

    Aug 23, 2011

    Closed — Violation closed
  • C

    Repair the roof so that it will not leak at skylite, (1) at north center at roof

    Aug 23, 2011

    Closed — Violation closed
  • C

    Repair the leaky and/or defective faucets consistantly running cold water, heavy flow at showerbody in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Aug 23, 2011 · Apt 2

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the unkeyed plaster board ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from south at west

    Aug 23, 2011 · Apt 2

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective cement stucco coat 3'' to 6'' below cammel back at south exterior wall, from east to west at roof level

    Aug 23, 2011

    Closed — Violation closed
  • B

    Replace with new the broken or defective lower sash, window 1st from north at east in the 1st room from east located at apt 2, 2nd story

    Aug 23, 2011 · Apt 2

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of concealed water leak from above ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Aug 23, 2011 · Apt 2

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the plaster board ceiling, unkeyed in the bathroom located at apt 2, 2nd story, 1st apartment from south at west

    Aug 23, 2011 · Apt 2

    Closed — Violation closed
  • C

    Remove the illegal fastening double cylinder lock at building entrance metal door at public hall, 1st story

    May 19, 2011

    Closed — Violation closed
  • B

    Properly repair the broken or defective mechanical ventilation at bathroom, 1st story, apartment

    May 19, 2011 · Apt 1

    Closed — Violation closed
  • B

    Repair or replace the smoke detector missing at entire apartment, 1st story, apartment

    May 19, 2011 · Apt 1

    Closed — Violation closed
  • B

    Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. at entire apartment, 1st story, apartment

    May 19, 2011 · Apt 1

    Closed — Violation closed
  • B

    Abate the nuisance consisting of mice at entire apartment, 1st story, apartment

    May 19, 2011 · Apt 1

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard

    May 19, 2011

    Closed — Violation closed
  • B

    Properly repair the broken or defective lock at vestibule door at public hall, 1st story

    May 19, 2011

    Closed — Violation closed
  • C

    Remove the illegal fastening chain with padlock at the metal gate leading in to the basement at rear yard

    May 19, 2011

    Closed — Violation closed

DOB building violations · 1

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 21, 2011

    Dob violation - dismissed

ECB violations · 4

  • Class - 2

    Failure to file a special inspection statement of responsibility prior to permit issuance and prior to start of work under special inspection requirements.at the time of insp.it was observed that there was no s

    May 12, 2015

    Resolve
  • Class - 2

    Work does not conform to approved construction documents &/or approvedamendments.@ time of inspection it was observed that the excavation inthe cellar was not according to the plan.the plan didnt show the remov

    May 12, 2015 · Penalty $250

    Resolve
  • Class - 2

    Occupancy contrary to that allowed by c/o and dob's records. class 'a'apt created at cellar, partitions erected creating rooms for living. full kitchenw/gas range & kitchen sink,also full 3 pc bathroom present

    Aug 22, 2012 · Penalty $6,000

    Resolve
  • Class - 1

    Occupancy contrary to that allowed by c/o & dob records class 'a' apt created at basement. partitions erected creating rooms. kitchen & bathrm fixtures present. remedy: discontinue illegal use of amended c/o.

    May 19, 2011 · Penalty $12,000

    Resolve

Complaints

  • Appliance

    Electric/gas range

    Sep 3, 2025 · Apt 3A

    Close
  • Water leak

    Slow leak

    Feb 1, 2025 · Apt 5B

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2024 · Apt 4A

    Close
  • Door/window

    Window frame

    Jan 18, 2024 · Apt 5B

    Close
  • Door/window

    Window frame

    Jan 18, 2024 · Apt 5B

    Close
  • Electric

    No lighting

    Aug 29, 2023 · Apt 5B

    Close
  • General

    Cooking gas

    Aug 29, 2023 · Apt 5B

    Close
  • Plumbing

    Basin/sink

    Aug 29, 2023 · Apt 5B

    Close
  • Unsanitary condition

    Mold

    Aug 11, 2022 · Apt 4A

    Close
  • Paint/plaster

    Wall

    Aug 21, 2013 · Apt 1

    Close
Show 40 more ↓
  • Nonconst

    Vermin

    Aug 21, 2013 · Apt 1

    Close
  • Nonconst

    Vermin

    Aug 21, 2013 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Aug 21, 2013 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Aug 21, 2013 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Aug 21, 2013 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Aug 21, 2013 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Aug 21, 2013 · Apt 1

    Close
  • Plumbing

    Water-leaks

    May 8, 2013 · Apt 2

    Close
  • Plumbing

    Water-leaks

    May 8, 2013 · Apt 2

    Close
  • General

    Doors

    Apr 3, 2013 · Apt 2

    Close
  • General

    Floor

    Apr 3, 2013 · Apt 2

    Close
  • General

    Mold

    Apr 3, 2013 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    Apr 3, 2013 · Apt 2

    Close
  • Plumbing

    Basin/sink

    Apr 3, 2013 · Apt 2

    Close
  • Nonconst

    Rubbish

    Aug 15, 2012 · Apt 1

    Close
  • General

    Mold

    Aug 15, 2012 · Apt 1

    Close
  • Nonconst

    Vermin

    Aug 15, 2012 · Apt 1

    Close
  • General

    Mold

    Aug 15, 2012 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    Aug 15, 2012 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Aug 15, 2012 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Aug 15, 2012 · Apt 1

    Close
  • Plumbing

    Water-leaks

    Aug 15, 2012 · Apt 1

    Close
  • Nonconst

    Vermin

    Aug 15, 2012 · Apt 1

    Close
  • General

    Doors

    May 17, 2011 · Apt 1

    Close
  • General

    Locks

    May 17, 2011 · Apt 1

    Close
  • Plumbing

    Shower-stall

    May 17, 2011 · Apt 1

    Close
  • Plumbing

    Shower-stall

    May 17, 2011 · Apt 1

    Close
  • Plumbing

    Shower-stall

    May 17, 2011 · Apt 1

    Close
  • General

    Ventilation system

    May 17, 2011 · Apt 1

    Close
  • General

    Windows

    May 17, 2011 · Apt 1

    Close
  • Plumbing

    Water-leaks

    May 17, 2011 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    May 17, 2011 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    May 17, 2011 · Apt 1

    Close
  • Electric

    Lighting

    May 17, 2011 · Apt 1

    Close
  • Paint/plaster

    Ceiling

    May 17, 2011 · Apt 1

    Close
  • Paint/plaster

    Wall

    May 17, 2011 · Apt 1

    Close
  • General

    Windows

    May 17, 2011 · Apt 1

    Close
  • Nonconst

    Vermin

    May 17, 2011 · Apt 1

    Close
  • Plumbing

    Bathtub/shower

    Mar 29, 2010 · Apt 1

    Close
  • Plumbing

    Toilet

    Mar 29, 2010 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1899
Floors
5
Residential units
10
Building area
5,884 ft²
Lot area
1,975 ft²
Zoning
R7A
Community board
303
Council district
36
Block / lot
1778 / 21
Assessed value
$602,100
Landmark / historic district
No

HPD registration #358048, last renewed Jul 1, 2025.

Questions about 14 Spencer Court

Who owns 14 Spencer Court?

The owner of record in NYC Department of City Planning PLUTO data is Zev Goldstein LLC.

Does 14 Spencer Court have violations?

Yes. NYC HPD has recorded 76 housing violations at this property.

Is 14 Spencer Court rent stabilized?

No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.

When was 14 Spencer Court built?

City records list 1899 as the year it was built.

How many apartments are in 14 Spencer Court?

It has 10 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.