771 Monroe Street
Brooklyn, NY 11221BBL 3-01638-0074Map
Owner of record: Nostrand 2 Monroe, LLC
771 Monroe Street is a walk-up apartment building built in 1931 in Brooklyn, 11221. It has 8 residential units across 4 floors. The owner of record is Nostrand 2 Monroe, LLC. HPD has recorded 117 housing violations here, most recently on September 2, 2026. 27 of the 50 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 117
- DOB violations
- 19
- ECB violations
- 1
- HPD complaints
- 123
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 117
- BHazardous
Repair the roof so that it will not leak over ceiling in the 1st room from north located at apt 4a, 4th story, 1st apartment from south at west
Sep 2, 2026 · Apt 4A
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 4a, 4th story, 1st apartment from south at west
Sep 2, 2026 · Apt 4A
Open — Civ14 mailed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing post
Aug 30, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing post , 1st story
Aug 30, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective counter top at sink base cabinet in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east
Aug 30, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallway located at apt 2b, 2nd story, 1st apartment from north at east
Aug 30, 2026 · Apt 2B
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the private hallway located at apt 2b, 2nd story, 1st apartment from north at east
Aug 30, 2026 · Apt 2B
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets at sink in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east
Aug 30, 2026 · Apt 2B
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 2b, 2nd story, 1st apartment from north at east
Aug 30, 2026 · Apt 2B
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 4a, 4th story, 1st apartment from south at west
Jul 12, 2026 · Apt 4A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 4a, 4th story, 1st apartment from south at west
Jul 12, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 7, 2026
Open — Nov certified on time - BHazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 2a, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective plastic baseboard at west wall in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Jun 7, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective baseboard radiator cover at south and west wall in the 5th room from north located at apt 1a, 1st story, 1st apartment from south at west
May 1, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 1st story
May 1, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor at in the 5th room from north located at apt 1a, 1st story, 1st apartment from south at west
May 1, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 5th room from north located at apt 1a, 1st story, 1st apartment from south at west
May 1, 2026 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
May 1, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter top at sink in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west
Apr 16, 2026 · Apt 2A
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 16, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 2a, 2nd story, 1st apartment from south at west
Apr 16, 2026 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Apr 16, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 1st story
Apr 16, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings at all stories at public hall
Oct 1, 2025
Closed — Violation dismissed - BHazardous
Replace the broken or defective sink at west in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west
Oct 1, 2025 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the private hallway located at apt 2a, 2nd story, 1st apartment from south at west
Oct 1, 2025 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of permanently installed hook and eye at building entrance door , 1st story
Sep 25, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective aluminum saddle stripe in the kitchenette located at apt 1a, 1st story, 1st apartment from south at west
Sep 25, 2025 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchenette located at apt 1a, 1st story, 1st apartment from south at west
Sep 25, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west
Aug 5, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercom system at building entrance to east wall in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west
Aug 5, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye door stopper at vestibule entrance , 1st story
Aug 5, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west
Aug 5, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye door stopper at building entrance , 1st story
Aug 5, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 2a, 2nd story, 1st apartment from south at west
Aug 5, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the kitchen located at apt 2a, 2nd story, 1st apartment from south at west
Aug 5, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at washbasin in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west
Aug 5, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from south at west
Aug 5, 2025 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Jul 18, 2025 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective counter top for base cabinet at north and west wall in the kitchen located at apt 1a, 1st story, 1st apartment from south at west
Jul 18, 2025 · Apt 1A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Jul 18, 2025 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Jul 18, 2025 · Apt 1A
Closed — Violation dismissed
DOB building violations · 19
- Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Oct 1, 2019
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 18, 1999
Dob violation - dismissed
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Construction other optional
Hazardous
Sep 17, 1998
Vp*-violation unserved ecb- dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 1
- Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025 · Penalty $6,250
Active
Complaints
- Electric
Lighting
Aug 18, 2026 · Apt 2B
Open - Plumbing
Basin/sink
Aug 18, 2026 · Apt 2B
Open - Electric
Lighting
Aug 18, 2026 · Apt 2B
Close - Plumbing
Basin/sink
Aug 18, 2026 · Apt 2B
Close - Paint/plaster
Ceiling
Aug 13, 2026 · Apt 4A
Close - Flooring/stairs
Floor
Aug 13, 2026 · Apt 4A
Close - Unsanitary condition
Mold
Aug 13, 2026 · Apt 4A
Close - Plumbing
Toilet
Aug 13, 2026 · Apt 4A
Close - General
Cabinet
Aug 13, 2026 · Apt 4A
Close - Appliance
Refrigerator
Jul 24, 2026 · Apt 2A
Close
Show 40 more ↓
- Water leak
Heavy flow
Jul 4, 2026 · Apt 4A
Close - General
Cabinet
Jul 4, 2026 · Apt 4A
Close - Unsanitary condition
Pests
Jun 1, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Jun 1, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Jun 1, 2026 · Apt 2A
Close - Flooring/stairs
Floor
Jun 1, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Jun 1, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Jun 1, 2026 · Apt 2A
Close - Paint/plaster
Wall
Jun 1, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Mar 16, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Mar 16, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Mar 16, 2026 · Apt 2A
Close - Plumbing
Radiator
Feb 13, 2026 · Apt 1A
Close - General
Cabinet
Feb 13, 2026 · Apt 1A
Close - Flooring/stairs
Floor
Feb 13, 2026 · Apt 1A
Close - Water leak
Slow leak
Feb 11, 2026 · Apt 4A
Close - Electric
Wiring
Feb 11, 2026 · Apt 4A
Close - Paint/plaster
Ceiling
Feb 11, 2026 · Apt 4A
Close - Electric
Lighting
Feb 11, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 1B
Close - Electric
Power outage
Feb 8, 2026 · Apt 1B
Close - Plumbing
Water supply
Feb 8, 2026 · Apt 1B
Close - Water leak
Slow leak
Feb 3, 2026 · Apt 4A
Close - General
Cabinet
Feb 3, 2026 · Apt 4A
Close - Unsanitary condition
Mold
Feb 3, 2026 · Apt 4A
Close - Plumbing
Bathtub/shower
Feb 3, 2026 · Apt 4A
Close - Flooring/stairs
Floor
Jan 12, 2026 · Apt A1
Close - Plumbing
Radiator
Jan 12, 2026 · Apt A1
Close - Heat/hot water
Entire building
Jan 6, 2026 · Apt 1A
Close - Flooring/stairs
Floor
Nov 26, 2025 · Apt 1A
Close - General
Cabinet
Nov 26, 2025 · Apt 1A
Close - Flooring/stairs
Floor
Sep 22, 2025 · Apt 1A
Close - Paint/plaster
Ceiling
Jul 30, 2025 · Apt 2A
Close - Plumbing
Water supply
Jul 30, 2025 · Apt 2A
Close - Flooring/stairs
Floor
Jul 30, 2025 · Apt 2A
Close - Unsanitary condition
Mold
Jul 30, 2025 · Apt 2A
Close - Paint/plaster
Wall
Jul 30, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Jul 30, 2025 · Apt 2A
Close - Water leak
Slow leak
Jul 30, 2025 · Apt 2A
Close - Unsanitary condition
Pests
Jul 30, 2025 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 8
- Building area
- 7,110 ft²
- Lot area
- 3,000 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 41
- Block / lot
- 1638 / 74
- Assessed value
- $786,600
- Landmark / historic district
- No
HPD registration #337337, last renewed Aug 25, 2025.
Questions about 771 Monroe Street
Who owns 771 Monroe Street?
The owner of record in NYC Department of City Planning PLUTO data is Nostrand 2 Monroe, LLC.
Does 771 Monroe Street have violations?
Yes. NYC HPD has recorded 117 housing violations at this property.
Is 771 Monroe Street rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 771 Monroe Street built?
City records list 1931 as the year it was built.
How many apartments are in 771 Monroe Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.