Violations at 75 Lewis Avenue
Brooklyn, NY 11206 · BBL 3-01592-0001 · Back to the property
HPD housing violations
27 HPD violations, newest first.
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at laundry room door at laundry room, 5th story
Oct 13, 2026
Open — Violation will be reinspected - BHazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 529, 5th story, 1st apartment from east at south
Oct 13, 2026 · Apt 529
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door to boiler room locked at roof
Oct 12, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 615, 6th story, 1st apartment from west at north
Oct 12, 2026 · Apt 615
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the 2nd room from north at east located at apt 611, 2nd story, 4th apartment from west at north
Sep 22, 2026 · Apt 611
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at south east and west walls in the 2nd room from north located at apt 401, 4th story, 7th apartment from east at south
Sep 5, 2026 · Apt 401
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 608, 6th story, 9th apartment from west at north
Aug 18, 2026 · Apt 608
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 608, 6th story, 9th apartment from west at north
Aug 18, 2026 · Apt 608
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the kitchen located at apt 330, 3rd story, 1st apartment from east at south
Apr 30, 2026 · Apt 330
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective fan at ventilation system in the bathroom located at apt 324, 3rd story, 7th apartment from east at south , section ''3rear''
Mar 12, 2026 · Apt 324
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at west located at apt 504, 5th story, 4th apartment from east at south
Mar 12, 2026 · Apt 504
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at west located at apt 504, 5th story, 4th apartment from east at south
Mar 12, 2026 · Apt 504
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from north at east located at apt 609, 6th story, 8th apartment from west at north
Mar 12, 2026 · Apt 609
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north at east located at apt 609, 6th story, 8th apartment from west at north
Mar 12, 2026 · Apt 609
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from north at west located at apt 609, 6th story, 8th apartment from west at north
Mar 12, 2026 · Apt 609
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north at west located at apt 609, 6th story, 8th apartment from west at north
Mar 12, 2026 · Apt 609
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at ceiling in the bathroom located at apt 206, 2nd story, 2nd apartment from east at south
Feb 20, 2026 · Apt 206
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 504, 5th story, 4th apartment from east at south
Feb 20, 2026 · Apt 504
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north at west located at apt 504, 5th story, 4th apartment from east at south
Feb 20, 2026 · Apt 504
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at ceiling in the bathroom located at apt 609, 6th story, 8th apartment from west at north
Jan 31, 2026 · Apt 609
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 609, 6th story, 8th apartment from west at north
Jan 31, 2026 · Apt 609
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 504, 5th story, 4th apartment from east at south
Jan 31, 2026 · Apt 504
Open — Nov sent out - BHazardous
Refit upper and lower sash 1st window from north at east wall in the kitchen located at apt 130, 1st story, 1st apartment from east at south
Jan 31, 2026 · Apt 130
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective intercom system from building front to south wall in the foyer located at apt aptc32, 5th apartment from west at north
Jan 22, 2026 · Apt APTC32
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum allowable temperature of 130 degreef at all water fixtures in the bathroom located at apt aptc32, 5th apartment from west at north
Jan 22, 2026 · Apt APTC32
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mechanical ventilation at ceiling in the bathroom located at apt 104, 1st story, 4th apartment from east at south
Jan 8, 2026 · Apt 104
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Closed — Violation dismissed
DOB building violations
The newest 50 of 67 DOB violations. The city keeps the complete history.
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2022
Apr 22, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 27, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator - failure to file category 1 2017 inspection/test
Apr 5, 2019
Dob violation - dismissed - Elevator elevatorrequired
Cease use
Aug 10, 2018
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2017
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2016
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2016
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2016
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2016
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 6, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 18, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 15, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed
ECB violations
37 ECB violations, newest first.
- Class - 1
Failure to institute/maintain safety equipment measure or temporary construction - no handrails. as noted: at time of inspection at an active jobsite for a proposed 8 story building observed at exposure #1 1st
Dec 15, 2023 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction - no guardrails as noted: at time of inspection at an active jobsite for a proposed 8 story building observed series of opening
Dec 15, 2023 · Penalty $5,000
Resolve - Class - 1
I observed after hours work. noted, several workers pouring grout over newly installed planks at 1st fl, along willoughby ave. w/ assist of concrete mixer & hoist with outriggers., obtain after hours variance
Nov 15, 2023
Resolve - Class - 1
I observed several workers on the 1st fl deck grouting, adj uncapped rebars, causing an impalement hazard, & in viol of osha 1926.701.; 3301.1, comply with code
Nov 15, 2023
Resolve - Class - 1
I observed missing guardrails at 1st fl level, along willoughby ave open to basement below, posing a danger to workers not tied off near edge, working on a slippery surface., provide guard rails
Nov 15, 2023
Resolve - Class - 1
Noted workers grouting 1st fl planks, w/ inadequate access & lighting to work area. 2 ladders, unsecured w/ inadequate platform clearance, creating a danger to workers.; 3301.2, comply with code
Nov 15, 2023
Resolve - Class - 1
I observed construction debris and materials strewn about the site (mtl, netting, rebars, precast conc, 5-gal cont, plastic tarps, & wood) causing a hazard to workers (trips, slips, falls, & tears)., maintain a
Nov 15, 2023
Resolve - Class - 1
Missing guardrail system.observed missing guardrails at 1st fl level aong willoughby ave open to basement below posing danger to workers not tied-off near edge working on slippery surface.remedy:provide guardra
Nov 15, 2023
Resolve - Class - 1
Work w/o an after hours variance permit.observed after hours work.noted several workers pouring grout over newly installed planks at 1st fl,along willoughby ave w/assist of concrete mixer & hoist w/ outriggers.
Nov 15, 2023 · Penalty $1,250
Resolve - Class - 2
At time of inspection on an active 5 story alt jobsite i observed the sidewalk shed at exp.1 at the left end side no full parapet panel installed. stop all work at exp.1 and 2 corner.maintain sidewalk shed to c
Dec 22, 2022 · Penalty $2,400
Resolve - Class - 2
At time of inspection on an active 5 story alt jobsite i observed reshoring installed on 5th floor supported roof of building. when asking the competent person for the manufacturer specifications for the reshor
Dec 22, 2022
Resolve - Class - 2
At exp.1 supported scaffolding installed half on the sws deck and half to the ground - observed 3 foot frame used which is not shown on design drawings - design drawings shows only 7 foot frames throughout. de
Dec 22, 2022
Resolve - Class - 1
Failure to notify dept of accident incident that resulted in fatality or injury.note:worker injured standing on bucket lost balance fell suffered back & neck injuries taken to hospital as per check of dept reco
Aug 15, 2022 · Penalty $5,000
Resolve - Class - 1
At the time of my inspection observed that there were no safety measures provided (working platform, ladder, scaffolding) and scope of work was not adequately communicated on pre shift safety meeting. failure t
Jul 26, 2022 · Penalty $10,000
Resolve - Class - 1
At the time of my inspection observed stairecases between first and second floors with no safety measure in place( handrails) which create a hazardous falling condition. stop use staircases. provide handrails.
Jul 26, 2022 · Penalty $2,500
Resolve - Class - 1
At the time of my inspection observed temporary platform installed on the first floor. upon request from completent person design drawing none were provided which create an unsafe conditions for personnel acces
Jul 26, 2022 · Penalty $625
Resolve - Class - 1
At the time of my inspection observed supported scaffold at exp#1 with following violation conditions: 1. not fully planked working plarforms 2. missing toeboards, midrails and top rails 3. wood planks not tied
Jul 26, 2022 · Penalty $625
Resolve - Class - 2
Work doesnt conform to approved const docs &/or amendments.ato my inspi observed that supported scf@exp1&2 had 3levels plus planked deck.approved plans provided state 2fully osha planked decks(max) stop all use
Feb 15, 2022
Resolve - Class - 2
Bc3314.4.5.1 training for supported scf insps.atoi i observed daily insps for supported scfs were performed by konstantinos amakas who didntprovide 32hr training card.stop all use of supported scfs comply w/cod
Feb 15, 2022
Resolve - Class - 2
Failure to perform concrete washout procedures@site,collection of containment.as noted ato my insp@active jobsite observe concrete pump truck washout water&concrete beam dump onsite&buried,also concrete truck w
Jan 20, 2022 · Penalty $2,500
Resolve - Class - 1
Bc1905.12 2104.3 failure to implement cold weather const provision forconcrete.as noted ato my insp on active jobsite.observed concrete panel@exp4 aprx15'h&aprx30'l w/(illegible) temp aprx36degreef on enquiring
Jan 20, 2022 · Penalty $2,500
Resolve - Class - 2
Bc3301.7-failure to provide approved p.w. construction documents as noted at the time of my inspection at an active construction site observed steel stair case installed in teh existing building upon request
Jul 15, 2021
Resolve - Class - 1
Failure to notify (incident) in response to incident where worker got injured i asked competent person if they called dept hotline used for incidents or accidents he stated no worker was taken to hospital by em
Jul 15, 2021
Resolve - Class - 1
Failure to notify (incident) in response to incident where worker gut injured on alt1 active jobsite i asked competent person if they calleddob.hotline used for incidents/accidents he stated no worker was taken
Jul 15, 2021
Resolve - Class - 1
Fail to institute&maintain safety measures note:in response to incident where worker got injured@alt1 active jobsite.it was reported worker wilson was carrying 4x8 sheet plywood going up stairs when he lost his
Jul 15, 2021
Resolve - Class - 1
Failure to maintain onsite documents required by bc chapter 33 providedocuments upon request from the commissioner note at the time of my inspection of a proposed 8 story building under an act upon request to r
May 26, 2021
Resolve - Class - 2
Work does not conform to approved construction documents note at the time of my inspection of prposed 8 story building an active jobsite under an act upon request for the site safety plan i observed on the expo
May 26, 2021
Resolve - Class - 1
Permit holder failed to designated a competent person to conduct pre-shift safety meeting or to ensure that each competent person conducted the pre-shift meeting:at time of inspection at an active alt2 for stru
Mar 12, 2021
Resolve - Class - 1
Permiy holder failed to ensure worker attend pre-shift safety meeting prior to commencement of work.at time of inspection at an active jobsite alt2 for structural demolition of exisiting 5 story building it was
Mar 12, 2021 · Penalty $5,000
Resolve - Class - 1
Const super failed to perform duties as per code:@time of insp@active jobsite alt2 for structure demo of existing 5stybldg,it was observed active demo work by 5workers@jobsite&upon request for const super or co
Mar 12, 2021
Resolve - Class - 2
Bc3301.1.2 failure to comply w/nyc fire codes @time of my insp,i observed several conditions that pose maj fire hazard:(1)expired,uninspected portable fire extinguishers on multiple fls;(2)missing/removed fl#,n
Feb 25, 2021
Resolve - Class - 2
Work contrary to const drawings @time of my insp,i observed temo shoring in celler of sec of bldg@exp2(willoughby ave)const w/4"x4" wood posts instead of steel rm-shoping jacks as shown on drawings on pgdm-202.
Feb 25, 2021
Resolve - Class - 1
At time of inspection observed, erected 2-debris chutes inadequate manner in centre yard which are active at time of inspection. no permit in dob record. stop use erected inadequate debris chutes., obtain permi
Mar 2, 2020
Resolve - Class - 1
At time of inspection observed, interior demolition in progress 4th & 5th floor level and debris dumping to center yard with 2-inadequate chutes and approved plan mention 1-chute with pipe scaffold staging whic
Mar 2, 2020
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements. const material debris not properly stored or remove from site. noted at time of inspection observed interior demolition in progress at 3rd fl
Mar 2, 2020
Resolve - Non-hazardous
Failure to maintain: note: the driveway for parking lot located at theeast side of lot is sinking, and consist of pot holes that is retaining still water at various location. at the s/east corner of lot. remedy
Sep 19, 2005 · Penalty $2,500
Resolve - Non-hazardous
73m,74l,(73)five year test propertag and file elv# form (74) mognetized relays
Aug 14, 1991
Resolve