75 Lewis Avenue
Brooklyn, NY 11206BBL 3-01592-0001Map
Owner of record: Roman Catholic Church
75 Lewis Avenue is an elevator apartment building built in 2021 in Brooklyn, 11206. It has 205 residential units across 8 floors. The owner of record is Roman Catholic Church. HPD has recorded 27 housing violations here, most recently on October 13, 2026. 15 of the 27 most recent violations are still open.
- HPD violations
- 27
- DOB violations
- 67
- ECB violations
- 37
- HPD complaints
- 106
Available now in this building
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 27
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at laundry room door at laundry room, 5th story
Oct 13, 2026
Open — Violation will be reinspected - BHazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 529, 5th story, 1st apartment from east at south
Oct 13, 2026 · Apt 529
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door to boiler room locked at roof
Oct 12, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 615, 6th story, 1st apartment from west at north
Oct 12, 2026 · Apt 615
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the 2nd room from north at east located at apt 611, 2nd story, 4th apartment from west at north
Sep 22, 2026 · Apt 611
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at south east and west walls in the 2nd room from north located at apt 401, 4th story, 7th apartment from east at south
Sep 5, 2026 · Apt 401
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 608, 6th story, 9th apartment from west at north
Aug 18, 2026 · Apt 608
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 608, 6th story, 9th apartment from west at north
Aug 18, 2026 · Apt 608
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water above 130 degrees in the kitchen located at apt 330, 3rd story, 1st apartment from east at south
Apr 30, 2026 · Apt 330
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective fan at ventilation system in the bathroom located at apt 324, 3rd story, 7th apartment from east at south , section ''3rear''
Mar 12, 2026 · Apt 324
Closed — Violation dismissed
DOB building violations · 67
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed
ECB violations · 37
- Class - 1
Failure to institute/maintain safety equipment measure or temporary construction - no handrails. as noted: at time of inspection at an active jobsite for a proposed 8 story building observed at exposure #1 1st
Dec 15, 2023 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction - no guardrails as noted: at time of inspection at an active jobsite for a proposed 8 story building observed series of opening
Dec 15, 2023 · Penalty $5,000
Resolve - Class - 1
I observed after hours work. noted, several workers pouring grout over newly installed planks at 1st fl, along willoughby ave. w/ assist of concrete mixer & hoist with outriggers., obtain after hours variance
Nov 15, 2023
Resolve - Class - 1
I observed several workers on the 1st fl deck grouting, adj uncapped rebars, causing an impalement hazard, & in viol of osha 1926.701.; 3301.1, comply with code
Nov 15, 2023
Resolve - Class - 1
I observed missing guardrails at 1st fl level, along willoughby ave open to basement below, posing a danger to workers not tied off near edge, working on a slippery surface., provide guard rails
Nov 15, 2023
Resolve - Class - 1
Noted workers grouting 1st fl planks, w/ inadequate access & lighting to work area. 2 ladders, unsecured w/ inadequate platform clearance, creating a danger to workers.; 3301.2, comply with code
Nov 15, 2023
Resolve - Class - 1
I observed construction debris and materials strewn about the site (mtl, netting, rebars, precast conc, 5-gal cont, plastic tarps, & wood) causing a hazard to workers (trips, slips, falls, & tears)., maintain a
Nov 15, 2023
Resolve - Class - 1
Missing guardrail system.observed missing guardrails at 1st fl level aong willoughby ave open to basement below posing danger to workers not tied-off near edge working on slippery surface.remedy:provide guardra
Nov 15, 2023
Resolve - Class - 1
Work w/o an after hours variance permit.observed after hours work.noted several workers pouring grout over newly installed planks at 1st fl,along willoughby ave w/assist of concrete mixer & hoist w/ outriggers.
Nov 15, 2023 · Penalty $1,250
Resolve - Class - 2
At time of inspection on an active 5 story alt jobsite i observed the sidewalk shed at exp.1 at the left end side no full parapet panel installed. stop all work at exp.1 and 2 corner.maintain sidewalk shed to c
Dec 22, 2022 · Penalty $2,400
Resolve
Complaints
- Heat/hot water
Entire building
Oct 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2026 · Apt PHE
Close - Heat/hot water
Entire building
Oct 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2026 · Apt 315
Close - Heat/hot water
Entire building
Oct 13, 2026 · Apt 523
Close - Heat/hot water
Entire building
Oct 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 12, 2026 · Apt 315
Close - Heat/hot water
Entire building
Oct 12, 2026 · Apt 536
Close - Heat/hot water
Apartment only
Oct 12, 2026 · Apt 529
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2021
- Floors
- 8
- Residential units
- 205
- Building area
- 175,042 ft²
- Lot area
- 40,050 ft²
- Zoning
- R6B
- Community board
- 303
- Council district
- 36
- Block / lot
- 1592 / 1
- Assessed value
- $14,787,000
- Landmark / historic district
- No
HPD registration #391525, last renewed Sep 30, 2026.
Questions about 75 Lewis Avenue
Who owns 75 Lewis Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Roman Catholic Church.
Does 75 Lewis Avenue have violations?
Yes. NYC HPD has recorded 27 housing violations at this property.
Is 75 Lewis Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 75 Lewis Avenue built?
City records list 2021 as the year it was built.
How many apartments are in 75 Lewis Avenue?
It has 205 residential units and 206 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.