26 Gunther Place
Brooklyn, NY 11233BBL 3-01566-0035Map
Owner of record: Mcintosh, Sydney S
26 Gunther Place is a two-family home built in 1901 in Brooklyn, 11233. It has 2 residential units across 2 floors. The owner of record is Mcintosh, Sydney S. HPD has recorded 28 housing violations here, most recently on September 10, 2026. 25 of the 28 most recent violations are still open.
- HPD violations
- 28
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 15
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 28
- BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed elictrical wire at ceiling at public hall, 1st story
Sep 10, 2026
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed elictrical wire at ceiling at public hall, 2nd story
Sep 10, 2026
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of wires hanging from electrical panel box at east wall in the bathroom located at apt 2ndflo, 2nd story, 1st apartment from east at south
Mar 13, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from east at south
Mar 13, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the west wall in the kitchen located at apt 2ndflo, 2nd story, 1st apartment from east at south
Mar 13, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 2ndflo, 2nd story, 1st apartment from east at south
Mar 13, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 2ndflo, 2nd story, 1st apartment from east at south
Mar 13, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 2ndflo, 2nd story, 1st apartment from east at south
Mar 13, 2025 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceiling at public hall, 2nd story
Mar 13, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 2nd story
Mar 13, 2025
Open — Nov sent out
Show 18 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 2nd story
Mar 13, 2025
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of electrical wire hanging from ceiling at public hall, 2nd story
Mar 13, 2025
Open — Nov sent out - BHazardous
Replace with new the missing electrical light fixture at ceiling at public hall, 2nd story
Mar 13, 2025
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in uniform color the south wall, ceiling, south wall, ceiling in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Aug 14, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st radiator from south at west wall, 1st radiator from south at west wall in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from south at west
Aug 14, 2024 · Apt 2
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Aug 14, 2024 · Apt 2
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the kitchen , the foyer located at apt 2, 2nd story, 1st apartment from south at west
Aug 14, 2024 · Apt 2
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st door frame from south at west wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from south at west
Aug 14, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, 1st window frame from south at west wall in the 4th room from east at south located at apt 2, 2nd story, 1st apartment from south at west
Aug 14, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the bathroom located at apt 2, 2nd story, 1st apartment from south at west
Aug 14, 2024 · Apt 2
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2, 2nd story, 1st apartment from south at west
Aug 14, 2024 · Apt 2
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
May 20, 2024
Open — Info nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east at south located at apt 2floor, 2nd story, 1st apartment from south at west
May 17, 2024 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2floor, 2nd story, 1st apartment from south at west
May 17, 2024 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the 1st room from east at north, the kitchen located at apt 2floor, 2nd story, 1st apartment from south at west
May 17, 2024 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from south at west
May 17, 2024 · Apt 2FLOOR
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2floor, 2nd story, 1st apartment from south at west
May 17, 2024 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of ..exposed electrical wires at ceiling at public hall, 1st story
Jan 14, 2023
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Electric
No lighting
Aug 3, 2026 · Apt 1
Close - Electric
No lighting
Jul 28, 2026 · Apt 2NDFLO
Close - Water leak
Slow leak
Jan 27, 2026 · Apt 2
Close - Electric
No lighting
Dec 28, 2024 · Apt 2NDFLO
Close - Electric
Wiring
Dec 28, 2024 · Apt 2NDFLO
Close - Flooring/stairs
Floor
Dec 28, 2024 · Apt 2NDFLO
Close - Electric
Outlet/switch
Dec 28, 2024 · Apt 2NDFLO
Close - Paint/plaster
Wall
Aug 12, 2024 · Apt 2
Close - Door/window
Window frame
May 30, 2024 · Apt 2FL
Close - Flooring/stairs
Floor
May 30, 2024 · Apt 2FL
Close
Show 5 more ↓
- Flooring/stairs
Floor
May 16, 2024 · Apt 2FLOOR
Close - Flooring/stairs
Floor
May 16, 2024 · Apt 2FLOOR
Close - Paint/plaster
Wall
May 16, 2024 · Apt 2FLOOR
Close - Door/window
Door
May 16, 2024 · Apt 2FLOOR
Close - Heat/hot water
Apartment only
Jan 12, 2023 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B1)
- Year built
- 1901
- Floors
- 2
- Residential units
- 2
- Building area
- 1,440 ft²
- Lot area
- 1,313 ft²
- Zoning
- R5
- Community board
- 316
- Council district
- 41
- Block / lot
- 1566 / 35
- Assessed value
- $59,640
- Landmark / historic district
- No
Questions about 26 Gunther Place
Who owns 26 Gunther Place?
The owner of record in NYC Department of City Planning PLUTO data is Mcintosh, Sydney S.
Does 26 Gunther Place have violations?
Yes. NYC HPD has recorded 28 housing violations at this property.
Is 26 Gunther Place rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 26 Gunther Place built?
City records list 1901 as the year it was built.
How many apartments are in 26 Gunther Place?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.