860 Macon Street
Brooklyn, NY 11233BBL 3-01498-0021Map
Owner of record: Fc 860 LLC
860 Macon Street is a walk-up apartment building built in 1899 in Brooklyn, 11233. It has 6 residential units across 4 floors. The owner of record is Fc 860 LLC. HPD has recorded 54 housing violations here, most recently on February 25, 2022. 3 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 54
- DOB violations
- 1
- ECB violations
- 5
- HPD complaints
- 21
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 54
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 25, 2022
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 5, 3rd story, 1st apartment from north at east
Oct 19, 2021 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 5, 3rd story, 1st apartment from north at east
Oct 19, 2021 · Apt 5
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective plastered surfaces with fire retardant material at ceiling at public hall, 3rd story
Sep 1, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 5, 3rd story, 1st apartment from north at east
Sep 1, 2021 · Apt 5
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 5, 3rd story, 1st apartment from north at east
Sep 1, 2021 · Apt 5
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 5, 3rd story, 1st apartment from north at east
Sep 1, 2021 · Apt 5
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 5, 3rd story, 1st apartment from north at east
Sep 1, 2021 · Apt 5
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 3rd story
Aug 24, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the entrance located at apt 5, 3rd story, 1st apartment from west at north
Aug 24, 2021 · Apt 5
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling at public hall, 3rd story
Aug 24, 2021
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at public hall, 3rd story
Aug 24, 2021
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling at public hall, 3rd story original violation 14515921 issued 24-aug-21 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 24, 2021
Open — Defect letter issued - BHazardous
Properly repair the source and abate the evidence of a water leak at.. ceiling in the entrance located at apt 5, 3rd story, 1st apartment from west at north
Aug 24, 2021 · Apt 5
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the entrance located at apt 5, 3rd story, 1st apartment from west at north
Aug 24, 2021 · Apt 5
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective located at apt 5, 3rd story, 1st apartment from west at north
Aug 24, 2021 · Apt 5
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 5, 3rd story, 1st apartment from west at north
Aug 24, 2021 · Apt 5
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2021
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 13, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Sep 13, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 13, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 13, 2019
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 13, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 13, 2019
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective gasket at refrigerator door in the kitchen located at apt 6, 4th story, 1st apartment from north at east
Sep 13, 2019 · Apt 6
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Aug 22, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 22, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 22, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 22, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 22, 2019
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4, 2nd story, 1st apartment from east at south
Apr 16, 2019 · Apt 4
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5, 3rd story, 1st apartment from north at east
Mar 29, 2019 · Apt 5
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... 1 sq feet at east wall in the 2nd room from north located at apt 5, 3rd story, 1st apartment from north at east
Mar 29, 2019 · Apt 5
Closed — Violation dismissed - ANon-hazardous
Properly repair the broken or defective electrical light switch at north wall in the 4th room from north at east located at apt unit6, 4th story, 1st apartment from north at east
Dec 30, 2018 · Apt UNIT6
Closed — Violation dismissed - BHazardous
§ 300, 301, 302, m/d law file plans and obtain a certificate of occupancy to legalize the following alteration or restore premises to prior legal condition 2sty building with 3 apts, changed to 4 stys with 6 apts.
Mar 20, 2017
Open — Nov certified on time - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following 100 watts minimum
Dec 8, 1999
Closed — Violation closed - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing basement apt.
May 17, 1989
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of partition erected deviding center room 2 sty apt.
May 17, 1989
Closed — Violation closed - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing 2 sty apt.
May 17, 1989
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling installed thru out basement apt.
May 17, 1989
Closed — Violation closed - BHazardous
Properly secure the loose pit cover basement front.
May 17, 1989
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of wood paneling installed kitchen basement apt.
May 17, 1989
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles bathroom basement apt.
May 17, 1989
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet basement apt bathroom.
May 17, 1989
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling basement apt bathroom.
May 17, 1989
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of exposed electrical wires walls & ceilings thru out basement apt.
May 17, 1989
Closed — Violation closed - BHazardous
Replace with new the broken or defective tank cover water closet basement apt bathroom.
May 17, 1989
Closed — Violation closed - BHazardous
Replace the broken or defective washbasin basement apt bathroom.
May 17, 1989
Closed — Violation closed - BHazardous
D26-10.01 adm code repair the broken or defective plastered surfaces and paint in a uniform color ceiling 2 sty public hall.
Nov 30, 1987
Closed — Violation closed - ANon-hazardous
§ 178, 217 m/d law make effective the light and ventilation of skylight by removing from beneath same the domelight located in ceiling 2 sty pub hall.
Nov 30, 1987
Closed — Violation dismissed
DOB building violations · 1
- Unsafe buildings none
Ub-unsafe buildings none
Oct 24, 2009
Dob violation - dismissed
ECB violations · 5
- Class - 1
Failure to maintainbldg in code-compliant manner. noted: vacant and unoccupied bldg not sealed per dob code. entry doors to the 1st and basement flrs, all 2nd flr windows and 1 1st flr windows are all unsealed.
Apr 7, 2010 · Penalty $5,000
Resolve - Class - 1
Fail to maintain bldg or appurtenances in code compliant manner. solidmasonry frm exterior stair banister & stringer has partially collapsed& lays hazardously on some stairs. missing basement exterior door & se
Oct 24, 2009 · Penalty $5,000
Resolve - Class - 2
Failure to maintain bldg walls or appurtenances. noted: at front entrance stairway, sidewalk has collapsed across steps. remedy: maintain bldg walls & repair defect.
Dec 10, 2008 · Penalty $2,500
Resolve - Hazardous
Failure to maintain. note: front exterior staircase & sidewalks have collapsed. remedy: maintain bldg.
Jun 25, 2008 · Penalty $2,500
Resolve - Hazardous
Failure to maintain exterior bldg noted left side stone guardrails for main steps 4th fl height leading to main entrance to bldg has collapse detached remedy: maintain bldg forthwith
Feb 22, 2008 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Mold
Jun 4, 2025 · Apt 6
Close - Unsanitary condition
Mold
Aug 24, 2021 · Apt 5
Close - Water leak
Heavy flow
Aug 16, 2021 · Apt 5
Close - Unsanitary condition
Mold
Aug 16, 2021 · Apt 5
Close - Water leak
Heavy flow
Jul 15, 2021 · Apt 5
Close - Heat/hot water
Apartment only
Apr 28, 2021 · Apt 6
Close - Heat/hot water
Apartment only
Apr 16, 2021 · Apt 6
Close - Heat/hot water
Apartment only
Apr 15, 2021 · Apt 6
Close - Heat/hot water
Apartment only
Apr 9, 2021 · Apt 6
Close - Electric
Power outage
Jul 20, 2020 · Apt 5
Close
Show 11 more ↓
- Appliance
Refrigerator
Sep 9, 2019 · Apt 6
Close - Unsanitary condition
Pests
Apr 11, 2019 · Apt 4
Close - Unsanitary condition
Pests
Apr 1, 2019 · Apt 4
Close - Unsanitary condition
Mold
Mar 25, 2019 · Apt 5
Close - Unsanitary condition
Pests
Mar 25, 2019 · Apt 5
Close - Heat/hot water
Apartment only
Dec 29, 2018 · Apt UNIT6
Close - General
Bell/buzzer/intercom
Dec 29, 2018 · Apt UNIT6
Close - Electric
Lighting
Dec 29, 2018 · Apt UNIT6
Close - Heat/hot water
Apartment only
Dec 29, 2018 · Apt UNIT6
Close - Electric
No lighting
Dec 29, 2018 · Apt UNIT6
Close - General
Bell/buzzer/intercom
Dec 29, 2018 · Apt UNIT6
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1899
- Floors
- 4
- Residential units
- 6
- Building area
- 4,255 ft²
- Lot area
- 1,900 ft²
- Zoning
- R6
- Community board
- 316
- Council district
- 41
- Block / lot
- 1498 / 21
- Assessed value
- $542,250
- Landmark / historic district
- No
HPD registration #301291, last renewed Sep 23, 2025.
Questions about 860 Macon Street
Who owns 860 Macon Street?
The owner of record in NYC Department of City Planning PLUTO data is Fc 860 LLC.
Does 860 Macon Street have violations?
Yes. NYC HPD has recorded 54 housing violations at this property.
Is 860 Macon Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 860 Macon Street built?
City records list 1899 as the year it was built.
How many apartments are in 860 Macon Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.