970 Eastern Parkway
Brooklyn, NY 11213BBL 3-01395-0009Map
Owner of record: 970 Eastern Parkway LLC
970 Eastern Parkway is a walk-up apartment building built in 1920 in Brooklyn, 11213. It has 12 residential units across 4 floors. The owner of record is 970 Eastern Parkway LLC. HPD has recorded 227 housing violations here, most recently on June 3, 2026. 36 of the 50 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2024.
- HPD violations
- 227
- DOB violations
- 21
- ECB violations
- 24
- HPD complaints
- 333
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 227
- ANon-hazardous
Replace with new the missing safety caps at south wall at electrical outlet at public hall, 3rd story
Jun 3, 2026
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 6th room from east at north located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of at ceiling in the 6th room from east at north located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at north located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Replace the broken or defective sink in the kitchen located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective masonry stucco at north exterior wall at 4th story
Jun 3, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 2nd room from east at north located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 11 sq ft at ceiling in the 1st room from east at north located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Open — Defect letter issued - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 3, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the foyer located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective upper sash glass pane at 2nd window from west at north in the 1st room from east at north located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Open — Invalid certification - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the bathroom located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2c, 3rd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3b, 2nd story, 1st apartment from east at south
May 8, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3b, 2nd story, 1st apartment from east at south
May 8, 2026 · Apt 3B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the bathroom , the kitchen , the 2nd room from east, the 3rd room from east at south located at apt 3b, 2nd story, 1st apartment from east at south
May 8, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3b, 2nd story, 1st apartment from east at south
May 8, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 5, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3b, 2nd story, 1st apartment from east at south
May 8, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass at lower sash window in the 3rd room from east at south located at apt 3b, 2nd story, 1st apartment from east at south
May 8, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at the north wall east wall, south wall and ceiling in the bathroom located at apt 3b, 2nd story, 1st apartment from east at south
May 8, 2026 · Apt 3B
Open — Defect letter issued - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3b, 2nd story, 1st apartment from east at south
May 8, 2026 · Apt 3B
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt a2, 1st story, 1st apartment from south at west
Feb 11, 2026 · Apt A2
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a2, 1st story, 1st apartment from south at west
Feb 11, 2026 · Apt A2
Open — Notice of issuance sent to tenant - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the kitchen located at apt a2, 1st story, 1st apartment from south at west
Feb 11, 2026 · Apt A2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt a2, 1st story, 1st apartment from south at west
Feb 11, 2026 · Apt A2
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at north yard
Dec 22, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall stairs, 4th story
Dec 22, 2025
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall stairs, 4th story
Dec 22, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of construction materials at public hall, 1st story
Dec 22, 2025
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall stairs, 4th story
Dec 22, 2025
Open — Nov sent out - ANon-hazardous
Remove disused plumbing fixtures and properly seal pipe connections at sink, wash basin, shower, and water closet at bathroom and kitchen areas in basement
Dec 17, 2025
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at building rear at fire escape
Dec 17, 2025
Open — Nov sent out - BHazardous
Fire egress defective. remove the obstruction in fireproof passageway consisting of construction material and rubbish
Dec 17, 2025
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the east yard
Dec 17, 2025
Open — Nov sent out - BHazardous
Discontinue unlawful cooking space or file plans and application with this department to legalize same, if lawfully feasible, at range at kitchen areas in basement
Dec 17, 2025
Open — Nov sent out - BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections at wash basin and shower stall in bathroom areas, and sink in kitchen areas in basement
Dec 17, 2025
Open — Nov sent out - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies and all components at building rear at fire escape
Dec 17, 2025
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 19, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2d, 4th story, 1st apartment from west at north
Jun 10, 2025 · Apt 2D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the bathroom located at apt 2d, 4th story, 1st apartment from west at north
Jun 10, 2025 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash at north wall in the 1st room from north at west located at apt 2d, 4th story, 1st apartment from west at north
Jun 10, 2025 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt a2, 1st story, 1st apartment from south at west
Jun 28, 2023 · Apt A2
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a2, 1st story, 1st apartment from south at west
Jun 28, 2023 · Apt A2
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt a2, 1st story, 1st apartment from south at west
Jun 28, 2023 · Apt A2
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt a2, 1st story, 1st apartment from south at west
Jun 28, 2023 · Apt A2
Open — Nov sent out
DOB building violations · 21
- Construction other optional
Atoi i observed at basement level 2 illegal room conversion apartments with full kitchens and bathrooms.
Dec 17, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 31, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed
Show 11 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 27, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed
ECB violations · 24
- Class - 1
Electrical work without a permit. atoi i observed exposed in progress electrical bx cables running in buildings hallway from basement through to the 4th floor without dob approved permit for the scope of work p
May 21, 2026 · Penalty $2,530
Active - Class - 1
Work without a permit. atoi i observed mechanical work of installation of hot water heater and hvac system without dob approved permits for the scope of work., obtain permit
May 21, 2026 · Penalty $2,530
Active - Class - 1
Work without a permit. atoi i observed in hallway of apt a2 new copper pipes above hot water heater installed without dob approved permits for the scope of work being performed., obtain permit
May 21, 2026 · Penalty $2,530
Active - Class - 1
Observed as per dob records lmp #001914 was issued an ewn permit # ewn-b-01336763 which expired on 12/22/2025 and no laa was applied for within the allotted time of 2 business days which is prohibited as per ad
Jan 9, 2026 · Penalty $2,530
Active - Class - 1
Atoi i observed plumbing work performed throughout basement without dob approved permits, obtain permit
Dec 17, 2025 · Penalty $2,530
Active - Class - 1
Atoi i observed electrical work performed at basement level throughout without dob approved electrical permit., obtain permit
Dec 17, 2025 · Penalty $1,630
Active - Class - 1
Atoi i observed 2 illegal apartments that were constructed throughout basement without proper dob approved permits, obtain permit
Dec 17, 2025 · Penalty $2,530
Active - Class - 1
Observed in the basement in the boiler room an active gas leak. hot water heater using gas fittings on water lines. in basement lack support on gas lines, future on gas lines, union on gas lines, and gas dryer
Dec 17, 2025 · Penalty $2,530
Active - Class - 2
Observed roof vent terminal not installed properly. on fourth floor apartment 2d gas valve for the stove is not accessible for closing gas. on the first floor apartment 1a under sink waste line not installed pr
Dec 17, 2025 · Penalty $1,280
Active - Class - 2
Occupancy contrary to that allowed by c/o and/or department of building records. partition erected creating 2 illegal class a apartment at basement. apartment used for living at northeast 1 and north 3. gas ran
Dec 17, 2025 · Penalty $620
Active
Show 14 more ↓
- Class - 1
Atoi observed hanging and exposed bx wires from ceiling and around an unsupported electrical box also new electrical outlet openings with wires protruding through the walls., obtain permit
Sep 8, 2025 · Penalty $1,600
Active - Class - 1
3314.1 partial stop work order for supported scaffold not built to code specs.note:@time of insp i observed supported scaffold in place not built to code specs.1)no guardrails.2)work platform not fully decked.
Mar 8, 2017 · Penalty $1,600
Active - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob for nov #34985740x issued on 12.8.12. remedy: file a c/c.
Feb 1, 2013 · Penalty $800
Resolve - Class - 1
Unlawful acts.fail to comply w/commissioner's order,vacate order #396-12 apt b-3 illegally arranged & occupied as 4 separate sro rooms sharing kitchen & bath.rem:discontinue illegal use.comply w/vacate order #3
Dec 8, 2012 · Penalty $24,000
Resolve - Class - 2
Work w/o a permit: work noted at apt b3 erected full height partitionscreating 3 additional bedrooms. remedy: obtain permit or restore to prior level condition.
Nov 30, 2012 · Penalty $4,000
Resolve - Class - 1
Occupancy contrary to that allowed by the c of o or dob records. dob hpd mdr #288102 indicate premises to be a 12 family dwelling no b uni ts. now at apt b3 arrange & occupied as 4 sros, toiletries,food,
Nov 30, 2012 · Penalty $24,000
Resolve - Class - 2
Residence altered for occupancy as dwelling for more than the legally approved # of families. legal 2 bedroom class'a' apt illegally converted into 5 sro's w/full height partitions & single entry door all with
Jul 18, 2012 · Penalty $6,000
Resolve - Class - 1
Unlawful acts. failure to comply w/an order of the commissioner is correct the violating condition cited in nov #34854587z. converting a 2 bedroom class'a' residence to sro's. no record of compliance noted in
Dec 14, 2010 · Penalty $2,400
Resolve - Class - 1
Failure to correct ecb#34854587z for illegal creating 5 bedrooms/sro and electric, no record of correction with d.o.b.rem:obtain permit
Oct 8, 2010 · Penalty $12,000
Resolve - Class - 2
Residence alter for occup as dwelling for more than legally approved # of families. illegally converted a 2-bedroom class a unit into sro @ apt a3 & d3 erecting full height partitions to enclose additionial 4 &
Aug 20, 2010 · Penalty $6,000
Resolve - Class - 1
Work w/o a permit.erected full height partitions to enclose 4 & 5 bedrooms/sro w/corresponding conversion of electric,converting from 2 bedroom class-a residence to sros-no permit on dob records. rem:obtain per
Aug 20, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to provide unobstructed exit passageway huge garbage bags combining unidentified objects is stored directly drop ladder & on grade of passage in the even of emergency exit objects are piled approx 5
Oct 20, 2009 · Penalty $1,200
Resolve - Non-hazardous
50a,b,c,d,e.50a-boiler sections need to be sealed.50b-burner smoking.50c-boiler needs to be cleaned.50d-no fresh air in boiler rm(from outside)50e-oil lines need to be cemented.50f-sealed boiler
Sep 18, 2006 · Penalty $400
Active - Hazardous
Cease use. b4b/51/39/21b/16/50c/50d/50f/7a/48/50/50a/50b/50e. 50-oil leak at burner. 50a-discharge pipe missing from backflow-530c-pop safety valve. 50b-boiler jacket insulation missing. 50c-holes in boiler jac
Jan 11, 2006 · Penalty $2,500
Active
Complaints
- Heat/hot water
Apartment only
Oct 4, 2026 · Apt 1D
Close - Safety
Window guard broken/missing
May 17, 2026 · Apt 3B
Close - Plumbing
Basin/sink
May 17, 2026 · Apt 2C
Close - Plumbing
Basin/sink
May 17, 2026 · Apt 2C
Close - Water leak
Damp spot
May 17, 2026 · Apt 2C
Close - Paint/plaster
Wall
May 7, 2026 · Apt 3B
Close - Paint/plaster
Wall
May 7, 2026 · Apt 3B
Close - Water leak
Slow leak
May 7, 2026 · Apt 3B
Close - Flooring/stairs
Floor
May 7, 2026 · Apt 3B
Close - Unsanitary condition
Mold
May 7, 2026 · Apt 3B
Close
Show 40 more ↓
- Paint/plaster
Ceiling
May 7, 2026 · Apt 3B
Close - Paint/plaster
Wall
May 7, 2026 · Apt 3B
Close - Paint/plaster
Ceiling
Feb 10, 2026 · Apt A2
Close - Plumbing
Bathtub/shower
Feb 10, 2026 · Apt A2
Close - Heat/hot water
Entire building
Dec 19, 2025 · Apt BLDG
Close - Plumbing
Basin/sink
Jun 6, 2025 · Apt 2D
Close - Door/window
Window frame
Jun 6, 2025 · Apt 2D
Close - Unsanitary condition
Mold
Jun 6, 2025 · Apt 2D
Close - Door/window
Door
Jun 6, 2025 · Apt 2D
Close - General
Bell/buzzer/intercom
Nov 28, 2023 · Apt 2D
Close - General
Bell/buzzer/intercom
Aug 28, 2023 · Apt 2C
Close - General
Cabinet
Aug 28, 2023 · Apt 2CTHIR
Close - Flooring/stairs
Floor
Aug 28, 2023 · Apt 2CTHIR
Close - Plumbing
Basin/sink
Aug 28, 2023 · Apt 2CTHIR
Close - Paint/plaster
Ceiling
Jun 2, 2023 · Apt 1D
Close - Paint/plaster
Ceiling
Apr 22, 2023 · Apt 3C
Close - Paint/plaster
Ceiling
Apr 22, 2023 · Apt 3C
Close - Water leak
Heavy flow
Apr 22, 2023 · Apt 3C
Close - Water leak
Heavy flow
Mar 26, 2023 · Apt 2A
Close - Heat/hot water
Entire building
Jan 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 20, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 20, 2022 · Apt D1
Close - Paint/plaster
Ceiling
Nov 19, 2022 · Apt D1
Close - Electric
Power outage
Nov 19, 2022 · Apt D1
Close - Plumbing
Basin/sink
Nov 19, 2022 · Apt D1
Close - Water leak
Damp spot
Nov 19, 2022 · Apt D1
Close - Door/window
Window frame
Nov 19, 2022 · Apt D1
Close - Heat/hot water
Apartment only
Nov 19, 2022 · Apt D1
Close - Heat/hot water
Apartment only
Nov 18, 2022 · Apt D1
Close - Paint/plaster
Wall
Jul 19, 2021 · Apt 2C
Close - Water leak
Heavy flow
Jan 19, 2021 · Apt 2A
Close - Water leak
Heavy flow
Jan 13, 2020 · Apt 2A
Close - Paint/plaster
Ceiling
Jan 13, 2020 · Apt 2A
Close - Electric
Lighting
Jan 13, 2020 · Apt 2A
Close - Water leak
Heavy flow
Jan 13, 2020 · Apt 2A
Close - Door/window
Window frame
Jan 13, 2020 · Apt 2A
Close - Heat/hot water
Entire building
Dec 31, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2018 · Apt C3
Close - Electric
Lighting
Feb 21, 2017 · Apt 1D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 4
- Residential units
- 12
- Building area
- 14,220 ft²
- Lot area
- 5,426 ft²
- Zoning
- R6
- Community board
- 309
- Council district
- 35
- Block / lot
- 1395 / 9
- Assessed value
- $398,700
- Landmark / historic district
- No
HPD registration #301168, last renewed Apr 6, 2026.
Questions about 970 Eastern Parkway
Who owns 970 Eastern Parkway?
The owner of record in NYC Department of City Planning PLUTO data is 970 Eastern Parkway LLC.
Does 970 Eastern Parkway have violations?
Yes. NYC HPD has recorded 227 housing violations at this property.
Is 970 Eastern Parkway rent stabilized?
NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 33% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 970 Eastern Parkway built?
City records list 1920 as the year it was built.
How many apartments are in 970 Eastern Parkway?
It has 12 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.