183 Rochester Avenue
Brooklyn, NY 11213BBL 3-01368-0006Map
Owner of record: St. John's Housing Development Fund Corp .
183 Rochester Avenue is a walk-up apartment building built in 1910 in Brooklyn, 11213. It has 20 residential units across 4 floors. The owner of record is St. John's Housing Development Fund Corp .. HPD has recorded 26 housing violations here, most recently on August 25, 2026. 15 of the 26 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 26
- DOB violations
- 8
- ECB violations
- 0
- HPD complaints
- 41
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 26
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Aug 25, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story
Aug 14, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story
Aug 14, 2026
Open — Nov certified on time - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Aug 14, 2026
Open — Nov certified on time - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 3D
Open — Notice of issuance sent to tenant - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 3D
Open — Civ14 mailed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at door in the entrance located at apt 3d, 3rd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 3D
Open — Civ14 mailed - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 3D
Open — Civ14 mailed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Jul 15, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Jul 15, 2026 · Apt 2A
Closed — Violation closed
Show 16 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the bathroom located at apt 2a, 2nd story, 1st apartment from west at north
Jul 15, 2026 · Apt 2A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 2a, 2nd story, 1st apartment from west at north
Jul 15, 2026 · Apt 2A
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and north wall in the 1st room from east at south located at apt 2a, 2nd story, 1st apartment from west at north
Jul 15, 2026 · Apt 2A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the foyer located at apt 2a, 2nd story, 1st apartment from west at north
Jul 15, 2026 · Apt 2A
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west
May 30, 2026 · Apt 3D
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west
May 30, 2026 · Apt 3D
Open — Invalid certification - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 5, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west
Apr 8, 2026 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 3d, 3rd story, 2nd apartment from south at west
Apr 8, 2026 · Apt 3D
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west
Apr 8, 2026 · Apt 3D
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 3d, 3rd story, 2nd apartment from south at west
Apr 8, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 3d, 3rd story, 2nd apartment from south at west original violation 18774045 issued 08-apr-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Apr 8, 2026 · Apt 3D
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 10, 2025
Closed — Violation dismissed - ANon-hazardous
M/d law abate the nuisance consisting of dust obstructing the air vent in the kitchen located at apt 3d, 3rd story, 2nd apartment from west at north
Apr 23, 2021 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
M/d law abate the nuisance consisting of dust obstructing the air vests in the bathroom located at apt 3d, 3rd story, 2nd apartment from west at north
Apr 23, 2021 · Apt 3D
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3d, 3rd story, 2nd apartment from west at north
Apr 23, 2021 · Apt 3D
Closed — Violation dismissed
DOB building violations · 8
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 0
No ECB violations on record
Complaints
- Water leak
Slow leak
Jul 15, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Jul 15, 2026 · Apt 2A
Close - Water leak
Slow leak
Jul 9, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Jul 9, 2026 · Apt 2A
Close - General
Janitor/super
Jul 6, 2026 · Apt 3B
Close - Unsanitary condition
Garbage/recycling storage
Jul 6, 2026 · Apt 3B
Close - Door/window
Door
Jul 6, 2026 · Apt 3B
Close - General
Mailbox
Jul 6, 2026 · Apt 3B
Close - Water leak
Slow leak
May 27, 2026 · Apt 3D
Close - Unsanitary condition
Mold
May 27, 2026 · Apt 3D
Close
Show 31 more ↓
- Unsanitary condition
Mold
Mar 18, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 1A
Close - Appliance
Electric/gas range
Feb 5, 2025 · Apt 3B
Close - General
Cooking gas
Feb 4, 2025 · Apt 4C
Close - Heat/hot water
Entire building
Jan 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2024 · Apt BLDG
Close - General
Mailbox
May 26, 2022 · Apt 3A
Close - Water leak
Heavy flow
Feb 20, 2022 · Apt 2C
Close - Heat/hot water
Entire building
Nov 5, 2021 · Apt BLDG
Close - General
Ventilation system
Apr 20, 2021 · Apt 3D
Close - Electric
Lighting
Apr 20, 2021 · Apt 3D
Close - Heat/hot water
Entire building
Oct 25, 2018 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 23, 2018 · Apt BLDG
Close - Appliance
Refrigerator
Oct 24, 2017 · Apt 3C
Close - Heating
Heat related
Jan 31, 2014 · Apt 3A
Close - Heating
Heat related
Jan 31, 2014 · Apt NA
Close - Heating
Heat related
Jan 24, 2014 · Apt 3B
Close - Heating
Heat related
Jan 8, 2014 · Apt NA
Close - Heating
Heat related
Jan 4, 2014 · Apt 4A
Close - Heating
Heat related
Jan 22, 2013 · Apt NA
Close - Heating
Heat related
Oct 4, 2011 · Apt 4D
Close - Heating
Heat related
Oct 3, 2011 · Apt 4D
Close - General
Window guards
Jun 1, 2011 · Apt 4B
Close - Heating
Heat related
Dec 25, 2010 · Apt 4D
Close - General
Windows
Jan 14, 2009 · Apt 1A
Close - General
Windows
Jan 14, 2009 · Apt 1A
Close - General
Windows
Jan 14, 2009 · Apt 1A
Close - General
Windows
Jan 14, 2009 · Apt 1A
Close - General
Windows
Jan 14, 2009 · Apt 1A
Close - General
Windows
Jan 14, 2009 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1910
- Floors
- 4
- Residential units
- 20
- Building area
- 13,635 ft²
- Lot area
- 4,163 ft²
- Zoning
- R6
- Community board
- 308
- Council district
- 41
- Block / lot
- 1368 / 6
- Assessed value
- $547,650
- Landmark / historic district
- No
HPD registration #306292, last renewed Sep 17, 2025.
Questions about 183 Rochester Avenue
Who owns 183 Rochester Avenue?
The owner of record in NYC Department of City Planning PLUTO data is St. John's Housing Development Fund Corp ..
Does 183 Rochester Avenue have violations?
Yes. NYC HPD has recorded 26 housing violations at this property.
Is 183 Rochester Avenue rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 80% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 183 Rochester Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 183 Rochester Avenue?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.