1153 President Street
Brooklyn, NY 11225BBL 3-01275-0066Map
Owner of record: 5501 President Street 1153 & 1159 Brookl Yn LLC
1153 President Street is a walk-up apartment building built in 1915 in Brooklyn, 11225. It has 20 residential units across 4 floors. The owner of record is 5501 President Street 1153 & 1159 Brookl Yn LLC. HPD has recorded 196 housing violations here, most recently on December 21, 2021. 2 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 196
- DOB violations
- 6
- ECB violations
- 7
- HPD complaints
- 449
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 196
- ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Dec 21, 2021
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles at intermediate landing at public hall stairs, 2nd story
Apr 25, 2019
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the mattress at building front yard
Apr 25, 2019
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cermaic floor tiles at public hall, 1st story
Apr 25, 2019
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioner unit at 4th story balcony at building south exterior wall
Apr 1, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Apr 1, 2019
Closed — Violation dismissed - ANon-hazardous
Remove device preventing door from being self-closing ( stops ) installed on door at front entrance to building , 1st story
Feb 13, 2019
Closed — Violation closed - ANon-hazardous
Remove device preventing door from being self-closing ( stops ) installed on door at vestibule at public hall, 1st story
Feb 13, 2019
Closed — Violation closed - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner
Nov 16, 2018 · Apt 3B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 1st room from north at east located at apt 3d, 3rd story, 2nd apartment from west at north
Sep 12, 2018 · Apt 3D
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Fire escape defective. replace with new the broken, defective and/or missing 1st standards from front balustrade to dropladder guard rod , on 2nd story balcony, south facade at fire escape
Sep 6, 2018
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective and cracked marble tread 3rd from bottom up ,at vesitbule public hall , 1st story
Sep 6, 2018
Closed — Violation closed - ANon-hazardous
Replace with new the missing metal pan under marble tread 1st up from bottom at public hall stairs, 2nd story
Sep 6, 2018
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective marble tread 1st up from bottom at public hall stairs, 2nd story
Sep 6, 2018
Closed — Violation closed - BHazardous
Arrange and make self-closing the doors from north at west at public hall , 1st story
Sep 6, 2018
Closed — Violation closed - ANon-hazardous
Remove device preventing door from being self-closing consisting of door stopper at vestibule door at public hall , 1st story
Sep 6, 2018
Closed — Violation dismissed - ANon-hazardous
Remove device preventing door from being self-closing consisting of door stopper at building front entrance door , 1st story
Sep 6, 2018
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective marble tread. 3rd tread from bottom up at vestibule. building entrance , 1st story
Oct 3, 2016
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of lockable handle set on door to room with access to fire escape in the 5th room from north at east located at apt 3a, 3rd story, 2nd apartment from east at south
Sep 2, 2016 · Apt 3A
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ; window ac unit protruding, fire escape at northeast courtyard, south facade, at 1st story.
Sep 2, 2016
Closed — Violation closed - CImmediately hazardous
Properly repair the broken or defective counter-balance mechanisms, lower sash, at window south 2 in the 5th room from north at east located at apt 2a, 2nd story, 2nd apartment from east at south
Aug 2, 2016 · Apt 2A
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south
Aug 2, 2016 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Refit door in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south
Aug 2, 2016 · Apt 2A
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes ; window ac unit protruding, fire escape at northeast court yard, south facade, at 3rd story.
Aug 2, 2016
Closed — Violation closed - ANon-hazardous
Section 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at fire escape at front of building.
Aug 2, 2016
Closed — Violation closed - BHazardous
Replace with new the broken or defective door in the entrance located at apt 2a, 2nd story, 2nd apartment from east at south
Aug 2, 2016 · Apt 2A
Closed — Violation dismissed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts vacate#131547 3sty. south 2 apt. 3a
Jul 1, 2016
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts vacate#131547 2sty. south 2 apt.2a
Jul 1, 2016
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of key-operated handle set on door to room with access to fire escape in the 3rd room from north at west located at apt 2b, 2nd story, 1st apartment from east at south
Jun 14, 2016 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling & west wall in the private hallway located at apt 2b, 2nd story, 1st apartment from east at south
Jun 14, 2016 · Apt 2B
Closed — Violation closed - BHazardous
Repair or replace the smoke detector , missing, located at apt 2b, 2nd story, 1st apartment from east at south
Jun 14, 2016 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Jun 14, 2016 · Apt 1A
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). too far from bedroom. located at apt 2b, 2nd story, 1st apartment from east at south
Jun 14, 2016 · Apt 2B
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 14, 2016
Closed — Violation closed - BHazardous
Replace with new the broken or defective door at bulkhead.
Jun 14, 2016
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of opening at dumbwaiter at south at roof.
Jun 14, 2016
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 3a, 3rd story, 2nd apartment from east at south
Jun 14, 2016 · Apt 3A
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 2a, 2nd story, 2nd apartment from east at south
Jun 14, 2016 · Apt 2A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 2d, 2nd story, 2nd apartment from west at north
Jul 11, 2015 · Apt 2D
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets wash basin in the bathroom located at apt 2d, 2nd story, 2nd apartment from west at north
Jul 11, 2015 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective concrete floor in the bathroom located at apt 2d, 2nd story, 2nd apartment from west at north
Jul 11, 2015 · Apt 2D
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from east at south wall in the 3rd room from north at east located at apt 3b, 3rd story, 1st apartment from east at south
Apr 11, 2015 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 3b, 3rd story, 1st apartment from east at south
Apr 11, 2015 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall, east wall in the kitchen located at apt 3b, 3rd story, 1st apartment from east at south
Apr 11, 2015 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) north wall, east wall, 1st window frame from west at north wall in the bathroom located at apt 3b, 3rd story, 1st apartment from east at south
Apr 11, 2015 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) south wall, east wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 3rd room from north at east located at apt 3b, 3rd story, 1st apartment from east at south
Apr 11, 2015 · Apt 3B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, 1st riser from east at south wall, west wall, north wall in the 3rd room from north at east located at apt 3b, 3rd story, 1st apartment from east at south
Apr 11, 2015 · Apt 3B
Closed — Violation dismissed - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. located at apt 3b, 3rd story, 1st apartment from east at south
Apr 11, 2015 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from east at south wall, ceiling in the bathroom located at apt 3b, 3rd story, 1st apartment from east at south
Apr 11, 2015 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door - in the entrance located at apt 2d, 2nd story, 2nd apartment from west at north
Apr 3, 2015 · Apt 2D
Closed — Violation dismissed
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Jan 20, 1993
Dob violation - dismissed
ECB violations · 7
- Class - 2
Ic vlg-25 gas/oil burner has noise when operating at high fire;correct violation and submit the certificate of correction
Nov 6, 2023
Resolve - Class - 2
Poor flame from burnerýnoise+vibration¨/safety valve is missing body drain pipe/boiler gas meter area has no ventilation from outdoors;correct violation and submit the certificate of correction
Sep 14, 2023
Resolve - Class - 2
Failed to notify department prior to installation or removal of suspended scaffold. atoi - observed suspended scaffold @ exposure #1/2. 1 @ expo 1, and 2 @ exposure 2. no notification was given to the dept atoi
Aug 24, 2023
Resolve - Class - 1
Erected or installed supported scaffold 40 feet or higher wtihout a permit atoi- observed supported scaffold @ exposure 1-2-3 all above 40 feet in height building is 50 feet in height no permit was on file with
Aug 24, 2023
Resolve - Class - 3
Work without a permit: at time of inspection observed at apt 2a, installed water and waste lines creating an additional 3pcs bathroom (shower, sink & toilet) inside apt. remedy: obtain permit
Jul 2, 2021 · Penalty $500
Resolve - Class - 2
Failure to comply w/ the comm order to file a cert of correction w/ the dob for nov#34900930l issued on 05/23/11 pursuant to 28-204.4 & 1rcny 102-01 rem: file a cert of correction
Jul 13, 2011 · Penalty $4,000
Resolve - Class - 1
Failure to maintain.hazardous defects are in apt 2c the bathroom ceiling has partially collapsed.exposing broken wood & under flooring of apt 3c.collapse is directly over toilet of apt 2c & may well be evidence
May 23, 2011 · Penalty $5,000
Resolve
Complaints
- Plumbing
Toilet
Oct 21, 2025 · Apt BSM
Close - Unsanitary condition
Pests
Oct 21, 2025 · Apt BSM
Close - Unsanitary condition
Sewage
Oct 21, 2025 · Apt BSM
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt 4B
Close - General
Janitor/super
Mar 5, 2024 · Apt 1D
Close - Heat/hot water
Apartment only
Feb 17, 2024 · Apt 1A
Close - Unsanitary condition
Mold
Aug 24, 2023 · Apt 2A
Close - Water leak
Heavy flow
Aug 24, 2023 · Apt 2A
Close - Paint/plaster
Wall
Jun 7, 2022 · Apt 3E
Close - Heat/hot water
Entire building
Dec 19, 2021 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Nov 4, 2021 · Apt 3D
Close - Heat/hot water
Entire building
Nov 17, 2020 · Apt 4A
Close - Heat/hot water
Entire building
Nov 3, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2020 · Apt 2E
Close - Heat/hot water
Entire building
Oct 24, 2020 · Apt 1D
Close - Heat/hot water
Entire building
Feb 14, 2020 · Apt 1C
Close - Heat/hot water
Entire building
Jan 17, 2020 · Apt 1R
Close - Unsanitary condition
Mold
Feb 12, 2019 · Apt 3D
Close - Unsanitary condition
Mold
Dec 27, 2018 · Apt 3D
Close - Unsanitary condition
Mold
Aug 29, 2018 · Apt 3D
Close - Heat/hot water
Entire building
Jan 15, 2018 · Apt 4E
Close - Heat/hot water
Entire building
Nov 19, 2017 · Apt 1A
Close - Heat/hot water
Entire building
Mar 30, 2017 · Apt 4B
Close - Paint/plaster
Ceiling
Jul 15, 2016 · Apt 4B
Close - Paint/plaster
Wall
Jul 15, 2016 · Apt 4B
Close - Flooring/stairs
Floor
Jul 15, 2016 · Apt 4B
Close - Plumbing
Toilet
Jul 15, 2016 · Apt 4B
Close - Heat/hot water
Entire building
Feb 15, 2016 · Apt 1A
Close - Heat/hot water
Entire building
Nov 23, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2015 · Apt 1A
Close - Unsanitary condition
Mold
Jul 5, 2015 · Apt 2D
Close - Heat/hot water
Entire building
May 8, 2015 · Apt 4B
Close - Heat/hot water
Entire building
May 8, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2015 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 3, 2015 · Apt BLDG
Close - Flooring/stairs
Floor
Apr 2, 2015 · Apt 2D
Close - Safety
Carbon monoxide detector
Apr 2, 2015 · Apt 3B
Close - Door/window
Door frame
Apr 2, 2015 · Apt 3B
Close - Paint/plaster
Wall
Apr 2, 2015 · Apt 3B
Close - Electric
No lighting
Apr 2, 2015 · Apt 3B
Close - Plumbing
Basin/sink
Apr 2, 2015 · Apt 3B
Close - Paint/plaster
Ceiling
Apr 2, 2015 · Apt 3B
Close - Flooring/stairs
Floor
Apr 2, 2015 · Apt 2D
Close - Flooring/stairs
Floor
Apr 2, 2015 · Apt 2D
Close - Heat/hot water
Entire building
Apr 2, 2015 · Apt 2E
Close - Plumbing
Bathtub/shower
Apr 2, 2015 · Apt 2D
Close - Plumbing
Basin/sink
Apr 2, 2015 · Apt 2D
Close - Door/window
Door
Apr 2, 2015 · Apt 2D
Close - Paint/plaster
Wall
Apr 2, 2015 · Apt 2D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1915
- Floors
- 4
- Residential units
- 20
- Building area
- 21,200 ft²
- Lot area
- 6,387 ft²
- Zoning
- R6
- Community board
- 309
- Council district
- 35
- Block / lot
- 1275 / 66
- Assessed value
- $828,900
- Landmark / historic district
- No
HPD registration #342099, last renewed Jul 28, 2026.
Questions about 1153 President Street
Who owns 1153 President Street?
The owner of record in NYC Department of City Planning PLUTO data is 5501 President Street 1153 & 1159 Brookl Yn LLC.
Does 1153 President Street have violations?
Yes. NYC HPD has recorded 196 housing violations at this property.
Is 1153 President Street rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 80% of its 20 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1153 President Street built?
City records list 1915 as the year it was built.
How many apartments are in 1153 President Street?
It has 20 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.