458 Eastern Parkway
Brooklyn, NY 11225BBL 3-01268-0006Map
Owner of record: 458 Eastern Parkway LLC
458 Eastern Parkway is a walk-up apartment building built in 1913 in Brooklyn, 11225. It has 16 residential units across 4 floors. The owner of record is 458 Eastern Parkway LLC. HPD has recorded 85 housing violations here, most recently on September 23, 2026. 26 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 85
- DOB violations
- 3
- ECB violations
- 1
- HPD complaints
- 56
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 85
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door
Sep 23, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 13, 2026
Open — Nov certified on time - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, south wall, east wall, west wall, 1st window frame from south at west wall in the 1st room from north located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from north located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, south wall, east wall, west wall, 1st window frame from south at west wall in the 1st room from north located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 5th room from north located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Defect letter issued
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 5th room from north located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the foyer , the private hallway located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — First no access to re- inspect violation - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, north wall, 1st window frame from south at west wall in the kitchen located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, 1st window frame from south at west wall in the 5th room from north located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt n, 4th story, 1st apartment from west at north
Aug 9, 2026 · Apt N
Open — First no access to re- inspect violation - BHazardous
Replace with new the missing escutcheon plate at radiator at floor in the 1st room from north located at apt a, 1st story, 1st apartment from north at east
May 9, 2025 · Apt A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective radiator air valve in the 1st room from north located at apt a, 1st story, 1st apartment from north at east
May 9, 2025 · Apt A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north located at apt a, 1st story, 1st apartment from north at east
May 9, 2025 · Apt A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 4th room from north located at apt a, 1st story, 1st apartment from north at east
May 9, 2025 · Apt A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a, 1st story, 1st apartment from north at east
May 9, 2025 · Apt A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt a, 1st story, 1st apartment from north at east
May 9, 2025 · Apt A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl tile at floor in the kitchen located at apt a, 1st story, 1st apartment from north at east
May 9, 2025 · Apt A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings throughout in the entire apartment located at apt a, 1st story, 1st apartment from north at east
May 9, 2025 · Apt A
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lower window sash glass pane in the bathroom located at apt a, 1st story, 1st apartment from north at east
May 9, 2025 · Apt A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a, 1st story, 1st apartment from north at east
Feb 10, 2024 · Apt A
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt a, 1st story, 1st apartment from north at east
Feb 10, 2024 · Apt A
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt a, 1st story, 1st apartment from north at east
Feb 10, 2024 · Apt A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt a, 1st story, 1st apartment from north at east
Feb 10, 2024 · Apt A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt a, 1st story, 1st apartment from north at east
Feb 10, 2024 · Apt A
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt p, 4th story, 1st apartment from east at south
Feb 6, 2024 · Apt P
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 2nd room from north located at apt e, 3rd story, 2nd apartment from west at north
Feb 5, 2024 · Apt E
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 2nd room from north located at apt e, 3rd story, 2nd apartment from west at north
Feb 5, 2024 · Apt E
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Feb 5, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 7, 2023
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 7, 2023
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Jun 7, 2023
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Jun 7, 2023
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 7, 2023
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
May 22, 2023
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
May 22, 2023
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 22, 2023
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
May 22, 2023
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
May 22, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule door at south at public hall, 1st story
May 22, 2023
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
May 22, 2023
Open — Nov sent out
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active
ECB violations · 1
- Non-hazardous
Failure to maintain exterior of the building wall; defect is; cracked loose amd missing brick work at the north west corner of the roof. remedy: make all necessary repairs
Jul 7, 1994
Resolve
Complaints
- Plumbing
Toilet
Jul 22, 2026 · Apt N
Close - Safety
Carbon monoxide detector
Jul 22, 2026 · Apt N
Close - Paint/plaster
Wall
Jul 22, 2026 · Apt N
Close - Plumbing
Basin/sink
Jul 22, 2026 · Apt N
Close - Flooring/stairs
Floor
Jul 22, 2026 · Apt N
Close - Paint/plaster
Ceiling
Jul 22, 2026 · Apt N
Close - Unsanitary condition
Mold
Jul 22, 2026 · Apt N
Close - Flooring/stairs
Floor
Jul 22, 2026 · Apt N
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt BLDG
Close - Plumbing
Steam pipe/riser
May 8, 2025 · Apt BLDG
Close
Show 40 more ↓
- Water leak
Slow leak
Apr 8, 2025 · Apt A
Close - Water leak
Slow leak
Mar 22, 2025 · Apt A
Close - Heat/hot water
Entire building
Jan 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 26, 2024 · Apt 3K
Close - Heat/hot water
Entire building
Feb 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
May 21, 2023 · Apt BLDG
Close - General
Janitor/super
Sep 21, 2020 · Apt LOBBYH
Close - Unsanitary condition
Garbage/recycling storage
Sep 21, 2020 · Apt LOBBYH
Close - Heat/hot water
Entire building
Feb 17, 2020 · Apt A
Close - Paint/plaster
Ceiling
Sep 16, 2019 · Apt A
Close - Water leak
Heavy flow
Sep 16, 2019 · Apt A
Close - Flooring/stairs
Floor
Aug 18, 2019 · Apt A
Close - Water leak
Heavy flow
Aug 18, 2019 · Apt A
Close - Heat/hot water
Entire building
Oct 15, 2018 · Apt I
Close - Heat/hot water
Entire building
May 8, 2017 · Apt D
Close - Electric
Lighting
Jul 19, 2016 · Apt B
Close - Paint/plaster
Wall
Jul 3, 2014 · Apt J
Close - Unsanitary condition
Pests
Jul 3, 2014 · Apt J
Close - Paint/plaster
Wall
Aug 27, 2012 · Apt B
Close - General
Doors
Aug 27, 2012 · Apt B
Close - General
Doors
Jul 23, 2012 · Apt B
Close - General
Doors
Jul 23, 2012 · Apt B
Close - General
Floor
Aug 17, 2010 · Apt A
Close - Plumbing
Bathtub/shower
Aug 17, 2010 · Apt A
Close - General
Floor
Aug 17, 2010 · Apt A
Close - General
Cabinet
Aug 17, 2010 · Apt A
Close - General
Floor
May 15, 2010 · Apt F
Close - Paint/plaster
Wall
May 15, 2010 · Apt F
Close - Nonconst
Vermin
May 15, 2010 · Apt F
Close - Heating
Heat related
Dec 15, 2005 · Apt 4N
Close - Heating
Heat related
Nov 13, 2005 · Apt 4N
Close - Nonconst
Vermin
Nov 8, 2005 · Apt 4N
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1913
- Floors
- 4
- Residential units
- 16
- Building area
- 14,832 ft²
- Lot area
- 5,852 ft²
- Zoning
- R6
- Community board
- 309
- Council district
- 35
- Block / lot
- 1268 / 6
- Assessed value
- $548,100
- Landmark / historic district
- No
HPD registration #339492, last renewed Aug 18, 2025.
Questions about 458 Eastern Parkway
Who owns 458 Eastern Parkway?
The owner of record in NYC Department of City Planning PLUTO data is 458 Eastern Parkway LLC.
Does 458 Eastern Parkway have violations?
Yes. NYC HPD has recorded 85 housing violations at this property.
Is 458 Eastern Parkway rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 458 Eastern Parkway built?
City records list 1913 as the year it was built.
How many apartments are in 458 Eastern Parkway?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.