290 Lincoln Place
Brooklyn, NY 11238BBL 3-01179-0007Map
Owner of record: M&M Lincoln Realty, LLC
290 Lincoln Place is a walk-up apartment building built in 1922 in Brooklyn, 11238. It has 19 residential units across 4 floors. The owner of record is M&M Lincoln Realty, LLC. HPD has recorded 130 housing violations here, most recently on October 12, 2026. 11 of the 50 most recent violations are still open. City tax records listed 18 rent-stabilized apartments here in 2024.
- HPD violations
- 130
- DOB violations
- 6
- ECB violations
- 0
- HPD complaints
- 267
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 130
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt a2, 1st story, 1st apartment from north at east
Oct 12, 2026 · Apt A2
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt a1 , 1st story, 1st apartment from east at south
Oct 12, 2026 · Apt A1
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a1 , 1st story, 1st apartment from east at south
Oct 12, 2026 · Apt A1
Open — Civ14 mailed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement
Oct 12, 2026
Open — Nov certified on time - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a1 , 1st story, 1st apartment from east at south
Oct 12, 2026 · Apt A1
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a2, 1st story, 1st apartment from north at east
Oct 12, 2026 · Apt A2
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt d4, 3rd story, 1st apartment from south at west
Apr 12, 2026 · Apt D4
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt d4, 3rd story, 1st apartment from south at west
Apr 12, 2026 · Apt D4
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt d4, 3rd story, 1st apartment from south at west
Apr 12, 2026 · Apt D4
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tile at north wall in the bathroom located at apt d4, 3rd story, 1st apartment from south at west
Apr 12, 2026 · Apt D4
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective wood floor tiles in the kitchen located at apt d4, 3rd story, 1st apartment from south at west
Apr 12, 2026 · Apt D4
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak above ceiling in the 1st room from north at east located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective wood frame in the entrance located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective escutcheon plate at riser at ceiling in the bathroom located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tile in the kitchen located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at west wall in the kitchen located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective upper and lower refrigerator door rubber gasket in the kitchen located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective wall tiles at north wall in the bathroom located at apt d4, 4th story, 1st apartment from south at west
Mar 8, 2026 · Apt D4
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt d1, 4th story, 1st apartment from east at south
Jan 22, 2026 · Apt D1
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement
Jan 22, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from east located at apt c1, 3rd story, 1st apartment from east at south
Dec 25, 2025 · Apt C1
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at celler at boiler room
Dec 25, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt b2, 2nd story, 2nd apartment from north at east
Nov 23, 2025 · Apt B2
Closed — Violation dismissed - BHazardous
Fire escape defective. properly secure guide rail at 2nd stack at building front at fire escape
Nov 23, 2025
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods dropped ladder at 2nd stack from east at north at fire escape
Oct 11, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 2nd story balcony at 1st stack from east at north at building front at fire escape
Aug 28, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 2nd story balcony at 2nd stack from east at north at building front at fire escape
Aug 28, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony at 1st stack from east at north at building front at fire escape
Aug 28, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony at 2nd stack from east at north at building front at fire escape
Aug 28, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 4th story balcony at 2nd stack from east at north at building front at fire escape
Aug 28, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of air conditioning unit protruding 4 inch beyond windowsill creating trip hazard at 4th story balcony at 1st stack from east at north at building ffront at fire escape
Aug 28, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flowers pots and household item at 2nd stack from east at north building front at fire escape, 2nd story
Apr 9, 2025
Closed — Violation dismissed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods drop ladder at 2nd stack from east at building front at fire escape, 2nd story
Apr 9, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt d1, 4th story, 1st apartment from east at south
Sep 29, 2024 · Apt D1
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Sep 29, 2024
Closed — Violation dismissed - BHazardous
Remove the illegal fastening slide bolt capable of being padlocked at bulkhead door leading to roof
Aug 28, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at bulkhead door leading to roof
Aug 28, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from east at south located at apt c5, 3rd story, 2nd apartment from east at south
May 28, 2024 · Apt C5
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east at south located at apt c5, 3rd story, 2nd apartment from east at south
May 28, 2024 · Apt C5
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall, east wall, west wall in the 3rd room from east located at apt c3, 3rd story, 1st apartment from west at north
Dec 27, 2023 · Apt C3
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the foyer located at apt c3, 3rd story, 1st apartment from west at north
Dec 27, 2023 · Apt C3
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st room from east located at apt c3, 3rd story, 1st apartment from west at north
Dec 27, 2023 · Apt C3
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st room from east located at apt c3, 3rd story, 1st apartment from west at north
Dec 27, 2023 · Apt C3
Open — Certification postponment granted
DOB building violations · 6
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 11, 2026 · Apt BLDG
Close - Plumbing
Toilet
Apr 26, 2026 · Apt A2
Close - Appliance
Refrigerator
Mar 5, 2026 · Apt D4
Close - Heat/hot water
Apartment only
Mar 5, 2026 · Apt D4
Close
Show 40 more ↓
- Door/window
Door
Mar 5, 2026 · Apt D4
Close - Heat/hot water
Apartment only
Feb 16, 2026 · Apt D1
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt D3
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt D1
Close - Heat/hot water
Entire building
Jan 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 23, 2025 · Apt C1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1922
- Floors
- 4
- Residential units
- 19
- Building area
- 16,104 ft²
- Lot area
- 5,819 ft²
- Zoning
- R7A
- Community board
- 308
- Council district
- 35
- Block / lot
- 1179 / 7
- Assessed value
- $652,500
- Landmark / historic district
- No
HPD registration #332239, last renewed Jul 23, 2026.
Questions about 290 Lincoln Place
Who owns 290 Lincoln Place?
The owner of record in NYC Department of City Planning PLUTO data is M&M Lincoln Realty, LLC.
Does 290 Lincoln Place have violations?
Yes. NYC HPD has recorded 130 housing violations at this property.
Is 290 Lincoln Place rent stabilized?
NYC Department of Finance tax bills listed 18 rent-stabilized units here in 2024 (about 95% of its 19 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 290 Lincoln Place built?
City records list 1922 as the year it was built.
How many apartments are in 290 Lincoln Place?
It has 19 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.