Pacific Street
Brooklyn, NY 11238BBL 3-01130-0011Map
Owner of record: Roman Catholic Church Of St.joseph
Pacific Street is an elevator apartment building built in 2019 in Brooklyn, 11238. It has 113 residential units across 6 floors. The owner of record is Roman Catholic Church Of St.joseph. HPD has recorded 44 housing violations here, most recently on August 25, 2026. 3 of the 44 most recent violations are still open. City tax records listed 34 rent-stabilized apartments here in 2024.
- HPD violations
- 44
- DOB violations
- 16
- ECB violations
- 23
- HPD complaints
- 86
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 44
- BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt 613, 5th story, 5th apartment from west at north
Aug 25, 2026 · Apt 613
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 613, 5th story, 5th apartment from west at north
Aug 25, 2026 · Apt 613
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 613, 5th story, 5th apartment from west at north
Aug 25, 2026 · Apt 613
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north and west walls in the bathroom located at apt 505, 5th story, 7th apartment from east at south
Apr 18, 2026 · Apt 505
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 505, 5th story, 7th apartment from east at south
Apr 18, 2026 · Apt 505
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 312, 3rd story, 10th apartment from west at north
Dec 5, 2025 · Apt 312
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 312, 3rd story, 10th apartment from west at north
Dec 5, 2025 · Apt 312
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at fire door leading to compactor room at south, hinges, at cellar at public hall
Nov 28, 2023
Closed — Violation closed
Show 34 more ↓
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 106, 5th apartment from east at south , section ''north''
Apr 25, 2022 · Apt 106
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 10, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor throughout in the 4th room from north located at apt 614, 6th story, 4th apartment from north at east
Jan 11, 2022 · Apt 614
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 4th room from north located at apt 614, 6th story, 4th apartment from north at east
Jan 11, 2022 · Apt 614
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 4th room from north located at apt 614, 6th story, 4th apartment from north at east
Jan 11, 2022 · Apt 614
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor throughout in the 2nd room from north located at apt 614, 6th story, 4th apartment from north at east
Jan 11, 2022 · Apt 614
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at eadt wall in the 2nd room from north located at apt 614, 6th story, 4th apartment from north at east
Jan 11, 2022 · Apt 614
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 2nd room from north located at apt 614, 6th story, 4th apartment from north at east
Jan 11, 2022 · Apt 614
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor throughout in the 3rd room from north located at apt 614, 6th story, 4th apartment from north at east
Jan 11, 2022 · Apt 614
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 3rd room from north located at apt 614, 6th story, 4th apartment from north at east
Jan 11, 2022 · Apt 614
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from north located at apt 614, 6th story, 4th apartment from north at east
Jan 11, 2022 · Apt 614
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from east located at apt 401, 4th story, 1st apartment from east at south
Jan 7, 2022 · Apt 401
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement
Jan 7, 2022
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at public hall, 1st story
Oct 18, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 18, 2021
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 18, 2021
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Oct 18, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 18, 2021
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 18, 2021
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at public hall, 1st story
Oct 18, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 18, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 14, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Oct 14, 2021
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Oct 14, 2021
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Oct 14, 2021
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Oct 14, 2021
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Oct 14, 2021
Closed — Violation closed - BHazardous
Properly repair the broken or defective mechanical air vent at south wall in the kitchen located at apt 214, 2nd story, 4th apartment from west at north
Oct 14, 2021 · Apt 214
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective mechanical air vent at north wall in the bathroom located at apt 214, 2nd story, 4th apartment from west at north
Oct 14, 2021 · Apt 214
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at missing at public hall, 1st story
Oct 14, 2021
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Oct 14, 2021
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at bathtub in the bathroom located at apt ph02, 6th story, 1st apartment from north at east , section at south
Aug 4, 2021 · Apt PH02
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt ph02, 6th story, 1st apartment from north at east , section at south
Aug 4, 2021 · Apt PH02
Closed — Violation closed
DOB building violations · 16
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2020
Jun 20, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 6, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 6, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active
Show 6 more ↓
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Public assembly none
Pa-public assembly none
Nov 1, 1989
Dob violation - active
ECB violations · 23
- Class - 1
Failure to safeguard all person & property note:at the time of my inspection of 6 story new bldg construction work in progress i observed atexp.#1 cmu work in progress sidewalk was blocked off w/chain link fenc
Feb 26, 2021 · Penalty $10,000
Resolve - Class - 1
Manufactor specification note:at the time of my inspection of a 6 story new bldg construction work in progress.i observed at exp.#1 chain link fence blocked off sidewalk w/{yorock} system & no 5 ft clearance fo
Feb 26, 2021 · Penalty $625
Resolve - Class - 2
Construction superintendent fail to perform his duties note:at the time of my inspection of a 6 story new bldg construction work in progressi was escorted to the construction office by 2 workers,upon request fo
Feb 26, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all person & property note:at the time of my inspection of 6 story new bldg construction work in progress.i observed atexp.#4 of 834 pacific st & the rear yard of 573 vanderbilt ave.adjacen
Feb 26, 2021
Resolve - Class - 2
3309.11 failure to protect outside property trees. at time of inspection of a 6 fl new building on finishing stage,i observed sidewalk and street work on exposure#1 w/o a trees protection contrary w/ chapter 33
Feb 25, 2021 · Penalty $625
Resolve - Class - 2
Failure to provide/maintain adequate housekeeping per sec requirements:@time of insp@active jobsite nb6sty residential aptbldg currently topped off,it was observed failure to provide adequate housekeeping w/ele
Feb 24, 2021
Resolve - Class - 1
Bc3307.4.7 inadequate work and storage zone at time of inspection of a 6 story nb currently at roof level i observed work and storage zone at roadway exp#1 with materials stored(cmu,cement)and so solid barrier
Oct 7, 2020 · Penalty $2,500
Resolve - Class - 1
Bc3309.2 failure to obtain license to enter adjoining property.at time of inspection of a 6 story nb currently at roof level i observed overhead protection installed at adjoining property rear yard at exp#4
Oct 7, 2020 · Penalty $1,250
Resolve - Class - 2
Scaffold training certificate card not readily available for inspection. note: at the time of inspection,i observed active work on supportedscaffold. upon request for scaffold 4hrs training card for use from
Sep 24, 2020
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. note: at the time of my inspection i observed at exp#4 there was a suspended scaffold on adjacent property roof level. upon inspe
Sep 24, 2020
Resolve
Show 13 more ↓
- Class - 1
Sec. 3314.1 unsafe supported scaffold. note: at the time of my inspection of a 6 sty new bldg,i observed a supported scaffold in place the following hazardous conditions observed: 1)planks not secured to frames
Sep 24, 2020
Resolve - Class - 2
Failure to comply w/a law,rule or comm's or involving construction &/or equipment safety operations. at the time of inspection,i observed ongoing construction activities contrary to mayors emergency executive
Aug 17, 2020
Resolve - Class - 1
Sec. bc 3303.4.2 dumpster container. at the time of inspection on an active jobsite of a 6 sty bldg currently at roof level,i observed in the street at exp#1 a 30 yard container full debris & bldg materials abo
Aug 17, 2020 · Penalty $625
Resolve - Class - 1
Work does not conform to approved const documents and/or approved amendments. @time of inspection of a 6 sty new building under const, i observed a supported scaffold @exp 1, 2,3 with the following conditions
May 14, 2020 · Penalty $625
Resolve - Class - 1
Failure to institute and maintain safety equipment measures and temporary construction note at the time of my inspection of a 6 story new buidling construction in progress i observed at roof level inadeqaute an
Apr 30, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to comply with governors executive order #202.6,202.8,202.11,202.13 and guidance published by the empire state development corporation pursuant to same at time of inspection of a 6 story nb currently
Apr 1, 2020 · Penalty $5,000
Resolve - Class - 1
Inadequate netting at the time of my inspection of 5 stoyr building actiev jobsite construction i observed worker working on different floor new building observed inadequate netting on the guardrails throughout
Jan 6, 2020
Resolve - Class - 2
Inadequate view panels fence:at the time of inspection of 5 story buidling actiev jobsite construction i observed worker working i observed jobsite fence over 8 feet had missing view panels fence install view p
Jan 6, 2020
Resolve - Class - 1
Failure to adequatly protect utilities.at time of my inspection of a active jositee i observed cables both electrical and data/communicationcables draped and hanging alongside a sidewalk shed along exposure#4 a
Dec 4, 2019 · Penalty $625
Resolve - Class - 2
Work does not conform to approved construction documents.noted:supported scaffold erected under permit#320057796,installation of scaffold @ setbacks and on slope roof,and around tower of church are not approved
Mar 8, 2011
Resolve - Class - 2
Failure to provide approved/accepted plans @ jobsite @ time of inspection.noted:no approved plan on site for supported scaffold erected @ all exposures,under permit#320051796.rem:provide plans.partial swo(suppo
Feb 9, 2011 · Penalty $250
Active - Non-hazardous
Operation of pa with out a current permit remedy obtain a current permit. pa contrary to approved palns door provided at east next to bathroomand kitchen remedy conform to approved plans
Aug 10, 1988
Resolve - Hazardous
Operation of pa without a current poermit remedy obtain a current permit. failure to have approved pa plans available for inspection. remedyprovide approved pa plans for inspection
Aug 4, 1988 · Penalty $135
Active
Complaints
- General
Ventilation system
Oct 12, 2026 · Apt 214
Open - Unsanitary condition
Mold
Oct 12, 2026 · Apt 214
Open - Appliance
Electric/gas range
Oct 12, 2026 · Apt 214
Open - General
Janitor/super
Oct 12, 2026 · Apt 304
Open - Door/window
Door
Oct 5, 2026 · Apt FRONTD
Open - Door/window
Door
Oct 5, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Sep 1, 2026 · Apt 608
Close - Unsanitary condition
Mold
Aug 7, 2026 · Apt 613
Close - Flooring/stairs
Floor
Aug 7, 2026 · Apt 613
Close - Water leak
Heavy flow
Apr 18, 2026 · Apt 6FLOOR
Close
Show 40 more ↓
- Outside building
Roofing
Apr 18, 2026 · Apt 214
Close - Water leak
Heavy flow
Apr 18, 2026 · Apt 214
Close - Water leak
Heavy flow
Apr 18, 2026 · Apt 505
Close - Paint/plaster
Ceiling
Apr 18, 2026 · Apt 505
Close - Paint/plaster
Wall
Apr 18, 2026 · Apt 505
Close - Water leak
Slow leak
Apr 18, 2026 · Apt 505
Close - Heat/hot water
Apartment only
Dec 19, 2025 · Apt 520
Close - Appliance
Electric/gas range
Dec 15, 2025 · Apt 411
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt 520
Close - Heat/hot water
Apartment only
Dec 11, 2025 · Apt 520
Close - Appliance
Refrigerator
Dec 8, 2025 · Apt 214
Close - Heat/hot water
Apartment only
Dec 8, 2025 · Apt 509
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt 520
Close - Appliance
Electric/gas range
Dec 8, 2025 · Apt 214
Close - Heat/hot water
Apartment only
Dec 7, 2025 · Apt 611
Close - Appliance
Electric/gas range
Dec 7, 2025 · Apt 214
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - General
Cooking gas
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - General
Cooking gas
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - General
Cooking gas
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - General
Cooking gas
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 3, 2025 · Apt 312
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 3, 2025 · Apt 216
Close - Heat/hot water
Apartment only
Nov 25, 2025 · Apt 312
Close - Appliance
Electric/gas range
Nov 22, 2025 · Apt 411
Close - Appliance
Refrigerator
Nov 10, 2025 · Apt 214
Close - Heat/hot water
Apartment only
Jan 24, 2025 · Apt 416
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 10, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 20, 2024 · Apt 401
Close - Unsanitary condition
Sewage
Dec 4, 2023 · Apt 111
Close - Unsanitary condition
Pests
Aug 15, 2023 · Apt 310
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2019
- Floors
- 6
- Residential units
- 113
- Building area
- 78,762 ft²
- Lot area
- 20,030 ft²
- Zoning
- R6B
- Community board
- 308
- Council district
- 35
- Block / lot
- 1130 / 11
- Assessed value
- $11,597,850
- Landmark / historic district
- No
HPD registration #389677, last renewed Jul 16, 2025.
Questions about Pacific Street
Who owns Pacific Street?
The owner of record in NYC Department of City Planning PLUTO data is Roman Catholic Church Of St.joseph.
Does Pacific Street have violations?
Yes. NYC HPD has recorded 44 housing violations at this property.
Is Pacific Street rent stabilized?
NYC Department of Finance tax bills listed 34 rent-stabilized units here in 2024 (about 30% of its 113 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was Pacific Street built?
City records list 2019 as the year it was built.
How many apartments are in Pacific Street?
It has 113 residential units and 115 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.