310 5 Avenue
Brooklyn, NY 11215BBL 3-00974-0038Map
Owner of record: Three Ten 5th LLC
310 5 Avenue is a mixed residential and retail building built in 1921 in Brooklyn, 11215. It has 6 residential units across 4 floors. The owner of record is Three Ten 5th LLC. HPD has recorded 194 housing violations here, most recently on April 30, 2026. 8 of the 50 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2024.
- HPD violations
- 194
- DOB violations
- 10
- ECB violations
- 5
- HPD complaints
- 116
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 194
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3r, 3rd story, 2nd apartment from south at west
Apr 2, 2025 · Apt 3R
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 3r, 3rd story, 2nd apartment from south at west
Apr 2, 2025 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3r, 3rd story, 2nd apartment from south at west
Apr 2, 2025 · Apt 3R
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at .. in the entrance located at apt 2l lower level, 2nd story, 1st apartment from east at south
Mar 26, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Mar 26, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the 2nd room from east located at apt 2l upper level, 2nd story, 1st apartment from east at south
Mar 26, 2025 · Apt 2L
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 26, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4l, 4th story, 1st apartment from north at east
Jun 26, 2024 · Apt 4L
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all parts all story balconies stack at rear yard at fire escape
Jun 26, 2024
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock on door leading to fire escape in the 1st room from east located at apt 4l, 4th story, 1st apartment from north at east
Jun 26, 2024 · Apt 4L
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at public hall, 1st story
Jun 26, 2024
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceed the maximum of 130 degrees in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Apr 7, 2024 · Apt 2L
Open — Not complied with - CImmediately hazardous
Properly repair or replace the broken or defective air vavle at radiator north wall in the 1st room from east located at apt 2l, 2nd story, 1st apartment from east at south
Apr 7, 2024 · Apt 2L
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Mar 19, 2024 · Apt 2L
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the 1st room from north located at apt 2l, 2nd story, 1st apartment from south at west
Mar 19, 2024 · Apt 2L
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 1st story
Mar 19, 2024
Closed — Violation closed - BHazardous
Replace the broken or defective radiator in the 4th room from north located at apt 2l, 2nd story, 1st apartment from south at west
Mar 19, 2024 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Jan 17, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from east located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2024 · Apt 2L
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of rubbish at public hall, 1st story
Dec 2, 2023
Closed — Violation dismissed - CImmediately hazardous
Properly repair the broken or defective lock at entrance door to building , 1st story
Mar 29, 2022
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the foyer located at apt 2r, 2nd story, 1st apartment from west at north
Nov 12, 2021 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 2nd story
Nov 12, 2021
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2r, 2nd story, 1st apartment from west at north
Nov 12, 2021 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 2r, 2nd story, 1st apartment from west at north
Nov 12, 2021 · Apt 2R
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 2nd story
Nov 12, 2021
Closed — Violation closed - BHazardous
Properly repair the broken or defective spring balance at lower sash south window in the 4th room from east located at apt 2r, 2nd story, 1st apartment from west at north
Nov 12, 2021 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 2r, 2nd story, 1st apartment from west at north
Nov 12, 2021 · Apt 2R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east located at apt 2r, 2nd story, 1st apartment from west at north
Nov 12, 2021 · Apt 2R
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the bathroom located at apt 2r, 2nd story, 1st apartment from west at north
Nov 12, 2021 · Apt 2R
Closed — Violation closed - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof at public hall, 4th story
Nov 12, 2021
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 3rd story
Nov 12, 2021
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 3rd story
Nov 12, 2021
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass lower sash south window in the 4th room from east located at apt 2r, 2nd story, 1st apartment from west at north
Nov 12, 2021 · Apt 2R
Closed — Violation dismissed - BHazardous
Replace with new the missing control knob of the radiator in the 1st room from north located at apt 2l upper level, 2nd story, apartment at south
Nov 5, 2021 · Apt 2L
Open — Not complied with - CImmediately hazardous
Replace with new the missing air valve at radiator in the 1st room from north located at apt 2l lower level, 2nd story, apartment at south
Nov 5, 2021 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors at east in the entrance located at apt 2l lower level, 2nd story, apartment at south
Nov 5, 2021 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors at west in the entrance located at apt 2l lower level, 2nd story, apartment at south
Nov 5, 2021 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors at east in the entrance located at apt 2l upper level, 2nd story, apartment at south
Nov 5, 2021 · Apt 2L
Closed — Violation closed - CImmediately hazardous
Code: arrange and make self-closing the doors at west in the entrance located at apt 2l upper level, 2nd story, apartment at south
Nov 5, 2021 · Apt 2L
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration : 3rd story floor breached and a staircase installed combining 2nd story south apartment 2l and 3rd story south apartment 3l into one duplex unit located at apt 2l, 2nd story
Nov 5, 2021 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 5, 2021
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures .. in the entire apartment located at apt 2r, 2nd story, apartment at north
May 18, 2017 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective glass lower sash south window in the 4th room from east located at apt 2r, 2nd story, apartment at north
May 18, 2017 · Apt 2R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at cellar
May 18, 2017
Closed — Violation closed - BHazardous
Replace or repair the self-closing doors that is missing or defective at entrance to apartment located at apt 3r, 3rd story, apartment at north
Jan 22, 2017 · Apt 3R
Open — Not complied with - BHazardous
Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt 3r, 3rd story, apartment at north
Jan 22, 2017 · Apt 3R
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the kitchen located at apt 3r, 3rd story, apartment at north
Jan 22, 2017 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and west wall in the kitchen located at apt 3r, 3rd story, apartment at north
Jan 22, 2017 · Apt 3R
Closed — Violation closed
DOB building violations · 10
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 5
- Class - 1
Unlawful acts. failure to comply with an order of the commissioner. noted: respondent failed to correct the conditions cited in the prior nov #34686716x having constructed a steel deck with concrete flooring
Sep 23, 2009 · Penalty $24,000
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dept of buildings. noted: respondent failed to comply with the commissioner's order to correct the violating conditio
Sep 23, 2009 · Penalty $4,000
Resolve - Class - 1
Provision of law 28-201.1 failure to comply with comm-order to obtain a permit per violation 34686716x- for erecting steel/concrete deck approx 28'x28'x15; at rear without a permit. rem: correct violation 34686
Apr 10, 2009 · Penalty $1,600
Resolve - Class - 1
Work without a permit. noted: at rear stell structure/ concrete deck. approx 28ftx28ftx5fth 2-removed windows at 1st floor rear and install ed glass doors. approx. 10ftx10fth. rem: obtain permit or restore prem
Sep 24, 2008 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior bldg wall hazardous defect is brown stone concrete cement work broken off from facade at 2rd and 4th fl and collapsed at side walk below at front of bldg structurial cracks observed
Mar 13, 2008 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 4, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 16, 2025 · Apt 2L
Close - Door/window
Door
Jul 21, 2025 · Apt 2L
Close - Heat/hot water
Entire building
Mar 9, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jun 7, 2024 · Apt 2L
Close - Heat/hot water
Apartment only
Jun 5, 2024 · Apt 2L
Close - Heat/hot water
Apartment only
Apr 5, 2024 · Apt 2L
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Mar 18, 2024 · Apt 2L
Close - Heat/hot water
Apartment only
Jan 15, 2024 · Apt 2L
Close - Heat/hot water
Apartment only
Dec 21, 2023 · Apt 2L
Close - Heat/hot water
Apartment only
Nov 29, 2023 · Apt 2L
Close - Heat/hot water
Apartment only
Nov 1, 2023 · Apt 2L
Close - Door/window
Door
Mar 28, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2022 · Apt BLDG
Close - Electric
Outlet/switch
Nov 5, 2021 · Apt 2L
Close - Heat/hot water
Apartment only
Nov 5, 2021 · Apt 2L
Close - Heat/hot water
Entire building
Nov 8, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
May 17, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
May 17, 2017 · Apt 2R
Close - Heat/hot water
Entire building
Feb 15, 2017 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 31, 2017 · Apt 2R
Close - Plumbing
Basin/sink
Dec 13, 2016 · Apt 3B
Close - Door/window
Door
Dec 9, 2016 · Apt 3R
Close - Paint/plaster
Wall
Dec 9, 2016 · Apt 3R
Close - Plumbing
Basin/sink
Dec 9, 2016 · Apt 3R
Close - Flooring/stairs
Floor
Jun 20, 2016 · Apt 2L
Close - Flooring/stairs
Floor
Jun 20, 2016 · Apt 2L
Close - Safety
Window guard broken/missing
Jun 20, 2016 · Apt 2L
Close - Unsanitary condition
Garbage/recycling storage
Feb 1, 2016 · Apt BLDG
Close - General
Bell/buzzer/intercom
Oct 21, 2014 · Apt 3R
Close - Water leak
Slow leak
Oct 21, 2014 · Apt 3R
Close - Paint/plaster
Ceiling
Oct 21, 2014 · Apt 3R
Close - Door/window
Door
Oct 21, 2014 · Apt 3R
Close - Door/window
Door
Jul 30, 2014 · Apt 3R
Close - Plumbing
Toilet
Jul 30, 2014 · Apt 3R
Close - General
Bell/buzzer/intercom
Jul 30, 2014 · Apt 3R
Close - Door/window
Door
Jul 30, 2014 · Apt 3R
Close - Heating
Heat related
Dec 12, 2009 · Apt 4R
Close - Paint/plaster
Ceiling
Aug 15, 2008 · Apt 2L
Close - Nonconst
Janitor/super
Aug 15, 2008 · Apt 2L
Close - Plumbing
Bathtub/shower
Aug 15, 2008 · Apt 2L
Close - Nonconst
Vermin
Jan 29, 2008 · Apt 2L
Close - Nonconst
Vermin
Jan 29, 2008 · Apt 2L
Close - Heating
Heat related
Jan 29, 2008 · Apt 2L
Close - Nonconst
Rubbish
Jan 29, 2008 · Apt 2L
Close - Nonconst
Janitor/super
Jan 29, 2008 · Apt 2L
Close - Heating
Heat related
Dec 4, 2007 · Apt 3L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1921
- Floors
- 4
- Residential units
- 6
- Building area
- 6,720 ft²
- Lot area
- 2,291 ft²
- Zoning
- R6A
- Community board
- 306
- Council district
- 39
- Block / lot
- 974 / 38
- Assessed value
- $1,041,300
- Landmark / historic district
- No
HPD registration #344214, last renewed Aug 27, 2025.
Questions about 310 5 Avenue
Who owns 310 5 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Three Ten 5th LLC.
Does 310 5 Avenue have violations?
Yes. NYC HPD has recorded 194 housing violations at this property.
Is 310 5 Avenue rent stabilized?
NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 67% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 310 5 Avenue built?
City records list 1921 as the year it was built.
How many apartments are in 310 5 Avenue?
It has 6 residential units and 8 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.