168 7 Avenue
Brooklyn, NY 11215BBL 3-00966-0047Map
Owner of record: 168 7th Avenue LLC
168 7 Avenue is a walk-up apartment building built in 1920 in Brooklyn, 11215. It has 7 residential units across 4 floors. The owner of record is 168 7th Avenue LLC. HPD has recorded 16 housing violations here, most recently on February 18, 2022. City tax records listed 2 rent-stabilized apartments here in 2024.
- HPD violations
- 16
- DOB violations
- 8
- ECB violations
- 8
- HPD complaints
- 21
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 16
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 18, 2022
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 18, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 5, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 5, 2021
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at ..frame missing at wall at public hall, 1st story
Jul 28, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Jul 28, 2019
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box notice missing at wall at public hall, 1st story
Jul 28, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jul 28, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 28, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 12, 2018
Closed — Violation dismissed
Show 6 more ↓
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 1, 2016
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 6, 2015
Closed — Violation dismissed - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling acoustic tiles. in the 1st room from east located at apt 2r, 2nd story, 1st apartment from south at west
Feb 23, 2015 · Apt 2R
Closed — Violation dismissed - ANon-hazardous
Section 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration suspended ceiling acoustic tiles in the private hallway located at apt 2r, 2nd story, 1st apartment from south at west
Feb 23, 2015 · Apt 2R
Closed — Violation dismissed - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 2r, 2nd story, 1st apartment from south at west
Feb 23, 2015 · Apt 2R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water that exceeds the maximum of 130 degrees. found hot water to be 142 degrees. located at apt 2r, 2nd story, 1st apartment from south at west
Feb 23, 2015 · Apt 2R
Closed — Violation closed
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2004
Dob violation - resolved - Construction other optional
Work without a permit. work noted: total gut rehab. new partition erected with metal studs, new ceiling being installed with metal studs sheetrock ready for installation. stop all work remedy: obtain a permit
May 21, 2001
Vw*-violation - work w/o permit dismissed - Construction other optional
Work without a permit. note: at the rear of the property a a/c unit ha has been installed approx size 10'x 5'x 3' no equipment use permit. note: installed a/c unit at back of property remedy: obtain equipment usage permit
Jan 3, 2000
Vw*-violation - work w/o permit dismissed - Construction other optional
Work without a permit. work noted.: having removed partition at rear of 1st floor grocery and having erected new partition at rear of restaurant which is next to grocery store for the purppose of enlarg- ing grocery store. s t 0o
Sep 4, 1997
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
May 13, 1996
Vpw*-violation unserved ecb-work without permit-dismissed - Construction other optional
C-construction other optional
May 13, 1996
Vp*-violation unserved ecb- dismissed
ECB violations · 8
- Non-hazardous
B4a,50a,b,c. 50a. holes in boiler room walls and ceiling. 50b. no emergency fuel cut off switch on side of boiler room file door. 50c. missing check valve on feed water line.
Apr 12, 2008 · Penalty $180
Resolve - Non-hazardous
B4a,50a,b,c,d,36. 50a. no emergency fuel cut off outside of boiler room fire door. 50b. remove threaded end from safety on boiler valve discharge. 50c.flue pipe not properly sealed to chimney. 50d. nipple in
Apr 12, 2008 · Penalty $2,500
Resolve - Non-hazardous
Work without permit;noted:total rehab,new partitions erected with metal studs,new ceiling being installed with metal studs,sheetrock ready for installation,stop all work.rem:obtain a permit
May 21, 2001 · Penalty $2,500
Resolve - Non-hazardous
Work without permit.note:at the rear of the property a a/c unit has been installed.approx size 10x5'x3.no equipment use permit.note:installed a/c unit at back of property.obtain equipment usage permit.
Jan 3, 2000 · Penalty $5,000
Resolve - Non-hazardous
Work without a permit canopy has been erected at rear approx 15x18x12 high remedy obtian permit or remve canopy
Feb 1, 1999 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit: work noted: wood deck erected in rear yard approx 15'x15'. remedy: obtain permits and approval if feasible or restore to prior legal condition.
Jun 11, 1998 · Penalty $2,500
Resolve - Non-hazardous
Work without a permit. work noted: having removed partition at rear of1st fl grocery store and having erected new partition at rear of restaurant which is next to grocery store for the purpose of enlarging
Sep 4, 1997 · Penalty $350
Resolve - Non-hazardous
Work without a permit. remedy: stop work and obtain a permit from this dept if feasible or restore premises to prior legal use.
Dec 29, 1988 · Penalty $125
Resolve
Complaints
- Plumbing
Water supply
Jul 26, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2015 · Apt 2R
Close - Heat/hot water
Entire building
Nov 8, 2014 · Apt BLDG
Close - Heating
Heat related
Jan 3, 2012 · Apt 4FL
Close - Heating
Heat related
Sep 30, 2011 · Apt 4FL
Close - Heating
Heat related
Feb 1, 2011 · Apt 4FL
Close - Plumbing
Radiator
Feb 1, 2011 · Apt 4FL
Close - Heating
Heat related
Jan 13, 2009 · Apt 4FL
Close - Heating
Heat related
Dec 1, 2008 · Apt 4FL
Close - Heating
Heat related
Feb 6, 2007 · Apt 4FL
Close
Show 11 more ↓
- Heating
Heat related
Feb 6, 2007 · Apt 4FL
Close - Heating
Heat related
Jan 29, 2007 · Apt 4FL
Close - Heating
Heat related
Jan 17, 2004 · Apt 4 FL
Close - Plumbing
Water supply
Jan 17, 2004 · Apt 4 FL
Close - Heating
Heat related
Jan 11, 2004 · Apt 4 FL
Close - Plumbing
Water supply
Jan 11, 2004 · Apt 4 FL
Close - Heating
Heat related
Dec 7, 2003 · Apt BLDG
Close - General
Stairs
Nov 18, 2003 · Apt T FL
Close - Heating
Heat related
Nov 15, 2003 · Apt 4 FL
Close - Heating
Heat related
Feb 24, 2003 · Apt T FL
Close - Plumbing
Bathtub/shower
Feb 24, 2003 · Apt T FL
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 4
- Residential units
- 7
- Building area
- 7,192 ft²
- Lot area
- 2,320 ft²
- Zoning
- R6A
- Community board
- 306
- Council district
- 39
- Block / lot
- 966 / 47
- Assessed value
- $1,341,450
- Landmark / historic district
- No
HPD registration #301388, last renewed Sep 11, 2025.
Questions about 168 7 Avenue
Who owns 168 7 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 168 7th Avenue LLC.
Does 168 7 Avenue have violations?
Yes. NYC HPD has recorded 16 housing violations at this property.
Is 168 7 Avenue rent stabilized?
NYC Department of Finance tax bills listed 2 rent-stabilized units here in 2024 (about 29% of its 7 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 168 7 Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 168 7 Avenue?
It has 7 residential units and 9 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.