4023 5 Avenue
Brooklyn, NY 11232BBL 3-00917-0001Map
Owner of record: 171 Myrtle Avenue Realty Corp.
4023 5 Avenue is a mixed residential and retail building built in 1931 in Brooklyn, 11232. It has 6 residential units across 4 floors. The owner of record is 171 Myrtle Avenue Realty Corp.. HPD has recorded 70 housing violations here, most recently on September 23, 2024. 34 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2023.
- HPD violations
- 70
- DOB violations
- 14
- ECB violations
- 4
- HPD complaints
- 41
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 70
- BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 23, 2024
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges (overhead door closure) at vestibule door , 1st story
Sep 23, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door , 1st story
Sep 23, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at building entrance door , 1st story
Sep 23, 2024
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the yard at building front
Jun 25, 2024
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jun 25, 2024
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 120 degrees f at all hot water fixtures in the entire apartment located at apt 3r, 4th story, 1st apartment from south at west
Jul 9, 2022 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entire apartment located at apt 3r, 4th story, 1st apartment from south at west
Jul 9, 2022 · Apt 3R
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3r, 4th story, 1st apartment from south at west
Jul 9, 2022 · Apt 3R
Open — Notice of issuance sent to tenant - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Apr 29, 2021
Open — Not complied with
Show 40 more ↓
- ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Apr 29, 2021
Open — Not complied with - BHazardous
Provide missing brackets for air conditioner on 3rd and 4th stories at front of building
Oct 6, 2020
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the entire apartment located at apt 1f, 2nd story, 1st apartment from west at north
Oct 6, 2020 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1f, 2nd story, 1st apartment from west at north
Oct 6, 2020 · Apt 1F
Closed — Violation dismissed - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing located at apt 1f, 2nd story, 1st apartment from west at north
Oct 6, 2020 · Apt 1F
Closed — Violation dismissed - BHazardous
Provide missing brackets for air conditioner on 4th story at north exterioir wall
Oct 6, 2020
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots on 2nd story balcony at building front stack
Oct 6, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and west wall at public hall, 2nd story
Oct 6, 2020
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and west wall at public hall, 2nd story
Oct 6, 2020
Open — Nov sent out - CImmediately hazardous
Arrange and make self-closing the doors at vestibule at public hall, 1st story
Oct 6, 2020
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling at public hall, 1st story
Oct 6, 2020
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at vestibule at public hall, 1st story
Oct 6, 2020
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the vestibule at public hall, 1st story
Oct 6, 2020
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx, 5 sq. ft. at west wall in the vestibule at public hall, 1st story
Oct 6, 2020
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at public hall, 1st story
Oct 6, 2020
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 6, 2020
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door leading to boiler room at cellar , 1st story
Oct 6, 2020
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 6, 2020
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1f, 2nd story, 1st apartment from west at north
Oct 6, 2020 · Apt 1F
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx, 5 sq. ft. at west wall in the vestibule at public hall, 1st story original violation 13849108 issued 06-oct-20 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 6, 2020
Open — Defect letter issued - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration the acoustic tile drop ceiling in the kitchen located at apt 1r, 2nd story, 1st apartment from east at south
Oct 31, 2017 · Apt 1R
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots and household items on the 2nd, 3rd, and 4th story balconies of the stack on the south exterior wall
Oct 31, 2017
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Oct 31, 2017
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Oct 31, 2017
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of wooden cage obstructing safe landing of dropladder at fire escape
Sep 22, 2017
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots , 4th story
Sep 22, 2017
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 22, 2017
Open — Nov sent out - BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. at public hall, 1st story
Sep 22, 2017
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 22, 2017
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 22, 2017
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1r, 2nd story
Jun 11, 2017 · Apt 1R
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor at boiler room at cellar
Jun 11, 2017
Open — Not complied with - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 11, 2017
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jun 11, 2017
Open — Nov sent out - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)
Jan 10, 2016
Open — Nov sent out - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all balconies , ladders and components throughout the south fire escape at front areaway
Aug 18, 2007
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department roaches in the entire apartment located at apt 3f, 3rd story, 1st apartment from south at west
Aug 16, 2007 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) south wall, east wall, west wall in the kitchen located at apt 3f, 3rd story, 1st apartment from south at west
Aug 16, 2007 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) baseboard at west wall, 1st closet from north at east wall door frame, 1st door frame from north at east wall, north wall, south wall, west wall, 1st window frame from south at west wall in the 4th room from east at north located at apt 3f, 3rd story, 1st apartment from south at west
Aug 16, 2007 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny ?11-06(b)(2) 1st door frame from west at north wall in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west
Aug 16, 2007 · Apt 3F
Open — Nov sent out
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - active - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 2
Observed 2 mini split a/c units on facade of building with electrical permit on file for scope of work, obtain all permits
Jan 5, 2024 · Penalty $6,250
Active - Class - 2
Boiler steam control pipe is incorrect/boiler room light is defect/2nd hwh is not legally abandoned/debris and storage in boiler room/chimney base not accessible; correct violation and submit the certificate of
Apr 29, 2021
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment devices appliances apparatus or materials in use.8ft indoor florescent fixtures used undercanapy in front of barber shop.remedy:comply with ec code (obtain perm
Nov 28, 2016 · Penalty $400
Active - Class - 2
Electrical work without a permit.observed at 1:30 pm bx armored cable on fron wall of barber shop not terminated for future use. no application on file for new installation of bx cable.remedy:obtain permit.
Nov 28, 2016 · Penalty $400
Active
Complaints
- Heat/hot water
Apartment only
Mar 13, 2026 · Apt R1
Close - Heat/hot water
Entire building
Dec 15, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 23, 2024 · Apt 2F
Close - Heat/hot water
Entire building
Nov 14, 2024 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Sep 19, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 19, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 8, 2022 · Apt 3R
Close - Heat/hot water
Apartment only
Jul 4, 2022 · Apt 3F
Close - Heat/hot water
Entire building
Nov 4, 2021 · Apt BLDG
Close
Show 31 more ↓
- Heat/hot water
Entire building
Nov 4, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2020 · Apt ENTIRE
Close - General
Cooking gas
Oct 2, 2020 · Apt 1F
Close - Heat/hot water
Entire building
Oct 30, 2017 · Apt 1R
Close - Heat/hot water
Apartment only
Jun 9, 2017 · Apt 1F
Close - Heating
Heat related
Dec 9, 2012 · Apt 3F
Close - Heating
Heat related
Nov 3, 2009 · Apt 2R
Close - Heating
Heat related
Oct 16, 2009 · Apt 2R
Close - Heating
Heat related
Feb 13, 2009 · Apt 2R
Close - Heating
Heat related
Feb 25, 2008 · Apt 3F
Close - Heating
Heat related
Nov 12, 2007 · Apt 2R
Close - Nonconst
Vermin
Aug 13, 2007 · Apt 3F
Close - Nonconst
Vermin
Aug 13, 2007 · Apt 3F
Close - Nonconst
Vermin
Aug 13, 2007 · Apt 3F
Close - Nonconst
Vermin
Aug 13, 2007 · Apt 3F
Close - Plumbing
Water-leaks
Aug 3, 2007 · Apt 3F
Close - General
Mold
Aug 3, 2007 · Apt 3F
Close - Nonconst
Vermin
Aug 3, 2007 · Apt 3F
Close - General
Mold
Jul 28, 2007 · Apt 3F
Close - Plumbing
Water-leaks
Jul 28, 2007 · Apt 3F
Close - Nonconst
Vermin
Jul 28, 2007 · Apt 3F
Close - Heating
Heat related
Feb 26, 2007 · Apt 2R
Close - Heating
Heat related
Feb 25, 2007 · Apt 2R
Close - Heating
Heat related
Jan 10, 2007 · Apt 2R
Close - Heating
Heat related
Dec 27, 2006 · Apt 2R
Close - Heating
Heat related
Dec 25, 2006 · Apt 1STFL
Close - Heating
Heat related
Dec 20, 2006 · Apt BLDG
Close - Heating
Heat related
Nov 18, 2005 · Apt 3F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1931
- Floors
- 4
- Residential units
- 6
- Building area
- 5,850 ft²
- Lot area
- 1,614 ft²
- Zoning
- R6A
- Community board
- 307
- Council district
- 38
- Block / lot
- 917 / 1
- Assessed value
- $443,700
- Landmark / historic district
- No
HPD registration #314650, last renewed Jul 8, 2026.
Questions about 4023 5 Avenue
Who owns 4023 5 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 171 Myrtle Avenue Realty Corp..
Does 4023 5 Avenue have violations?
Yes. NYC HPD has recorded 70 housing violations at this property.
Is 4023 5 Avenue rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2023 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 4023 5 Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 4023 5 Avenue?
It has 6 residential units and 8 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.