349 58 Street
Brooklyn, NY 11220BBL 3-00846-0053Map
Owner of record: 349 58 St LLC
349 58 Street is a walk-up apartment building built in 1906 in Brooklyn, 11220. It has 8 residential units across 4 floors. The owner of record is 349 58 St LLC. HPD has recorded 91 housing violations here, most recently on August 8, 2026. 10 of the 50 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 91
- DOB violations
- 3
- ECB violations
- 2
- HPD complaints
- 88
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 91
- BHazardous
Replace the broken or defective washbasin at east wall in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north
Aug 8, 2026 · Apt 3L
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective wood base cabinet east wall in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north
Aug 8, 2026 · Apt 3L
Open — Civ14 mailed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Apr 19, 2026
Open — False certification - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox sign missing at public hall, 1st story
Apr 19, 2026
Open — False certification - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats at front yard
Apr 19, 2026
Open — Defect letter issued - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings sign missing
Apr 19, 2026
Open — False certification - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Apr 19, 2026
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water and exceeding the maximum temperature of 130 degrees in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Mar 31, 2026 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Mar 31, 2026 · Apt 3L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 3l, 3rd story, 1st apartment from west at north
Mar 31, 2026 · Apt 3L
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Properly repair with similar material the broken or defective metal decoration at cornice, 4th story
Mar 31, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building front entrance door , 1st story
Mar 31, 2026
Open — Violation will be reinspected - BHazardous
Properly repair with similar material the broken or defective vinyl tiles at floor at public hall, 2nd story
Mar 31, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lock set at lower sash window at north wall in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north
Mar 31, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood base cabinet at east wall in the kitchen located at apt 3l, 3rd story, 1st apartment from west at north
Mar 31, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at upper sash window at north wall in the 3rd room from north located at apt 3l, 3rd story, 1st apartment from west at north
Mar 31, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Mar 31, 2026 · Apt 3L
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3l, 3rd story, 1st apartment from west at north
Mar 31, 2026 · Apt 3L
Closed — Violation dismissed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Mar 15, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door , 1st story
Mar 15, 2026
Open — Violation will be reinspected - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
Mar 3, 2026
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Feb 15, 2026
Closed — Violation dismissed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories balconies stacks at front of the building at fire escape
Feb 15, 2026
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign missing at public hall, 1st story
Jan 15, 2026
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Jan 15, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox sign missing at public hall, 1st story
Jan 15, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings sign missng
Jan 15, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Jan 15, 2026
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Jan 15, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective window glass pane lower sash in the 1st room from east located at apt 2l, 2nd story, 1st apartment from north at east
Jan 15, 2026 · Apt 2L
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Jan 15, 2026 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Jan 15, 2026 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1l, 1st story, 1st apartment from north at east
Dec 8, 2025 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling. in the 2nd room from east located at apt 1l, 1st story, 1st apartment from north at east
Dec 8, 2025 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 1l, 1st story, 1st apartment from north at east
Dec 8, 2025 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 8, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Dec 3, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective frame and door in the entrance located at apt 2l, 2nd story, 1st apartment from east at south
Dec 3, 2025 · Apt 2L
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department throughout all walls and ceilings in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Dec 3, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Dec 3, 2025 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Dec 3, 2025 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Dec 3, 2025 · Apt 2L
Closed — Violation dismissed - BHazardous
Provide a proper means of lighting for water closet compartment at ceiling in the bathroom located at apt 1l, 1st story, 1st apartment from north at east
Jul 9, 2024 · Apt 1L
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 1l, 1st story, 1st apartment from north at east
Jul 9, 2024 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 1l, 1st story, 1st apartment from north at east
Jul 9, 2024 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at entrance door to building , at public hall, 1st story
Mar 17, 2024
Closed — Violation closed - CImmediately hazardous
Replace with new the missing glass at vestibule door , east wall , at public hall, 1st story
Mar 17, 2024
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of of a refrigerator discaded with doors at public hall, 1st story
Mar 17, 2024
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective cracked masonry lintel at, 2nd window from north, basement story, building front
Mar 17, 2024
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Dec 28, 2022
Closed — Violation dismissed
DOB building violations · 3
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
ECB violations · 2
- Class - 1
Observed 2 sections of decorative corners at roof level and missing. also observed step cracks on left side of building next entrance door., repair and/replace
Jul 2, 2026 · Penalty $2,530
Active - Class - 2
Observed cracks and hole around walls and ceiling of first floor and hole in wall at kitchen in 3l. alos observe water damage at 4 floor staircases, repair and/or replace
Jul 2, 2026 · Penalty $1,250
Active
Complaints
- Heat/hot water
Entire building
Mar 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2026 · Apt BLDG
Close - General
Signage missing
Feb 9, 2026 · Apt BLDG
Close - Safety
Fire escape
Feb 9, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 9, 2026 · Apt BLDG
Close - Door/window
Door
Feb 9, 2026 · Apt BLDG
Close
Show 40 more ↓
- Safety
Fire escape
Feb 9, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 9, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 9, 2026 · Apt BLDG
Close - Electric
No lighting
Feb 9, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 9, 2026 · Apt BLDG
Close - Safety
Window guard broken/missing
Feb 9, 2026 · Apt BLDG
Close - Door/window
Door
Feb 9, 2026 · Apt BLDG
Close - Electric
No lighting
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 18, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 18, 2026 · Apt 1L
Close - Heat/hot water
Entire building
Dec 10, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 7, 2025 · Apt 349
Close - Heat/hot water
Entire building
Dec 1, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 22, 2025 · Apt 4R
Close - Heat/hot water
Entire building
Oct 17, 2025 · Apt 2R
Close - Heat/hot water
Entire building
Jan 21, 2025 · Apt BLDG
Close - Electric
Power outage
Jul 8, 2024 · Apt 1L
Close - Safety
Window guard broken/missing
Mar 14, 2024 · Apt 3R
Close - Heat/hot water
Apartment only
Feb 14, 2024 · Apt 1L
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt BLDG
Close - Plumbing
Water supply
Dec 24, 2022 · Apt 1L
Close - Unsanitary condition
Garbage/recycling storage
Dec 24, 2022 · Apt BLDG
Close - Safety
Window guard broken/missing
Mar 24, 2021 · Apt 3L
Close - Electric
Power outage
Aug 10, 2020 · Apt 1L
Close - Electric
Power outage
Aug 5, 2020 · Apt 1L
Close - Electric
Power outage
Aug 5, 2020 · Apt BLDG
Close - Door/window
Door frame
Jul 30, 2020 · Apt 3L
Close - General
Cabinet
Jul 30, 2020 · Apt 3L
Close - Flooring/stairs
Floor
Jul 30, 2020 · Apt 3L
Close - Paint/plaster
Wall
Jul 30, 2020 · Apt 3L
Close - Electric
Outlet/switch
Jul 30, 2020 · Apt 3L
Close - Unsanitary condition
Mold
Jul 30, 2020 · Apt 3L
Close - Heat/hot water
Apartment only
Dec 11, 2017 · Apt 2R
Close - Heat/hot water
Entire building
Dec 10, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 10, 2017 · Apt 2L
Close - Heat/hot water
Entire building
Jan 31, 2015 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1906
- Floors
- 4
- Residential units
- 8
- Building area
- 6,916 ft²
- Lot area
- 2,671 ft²
- Zoning
- R6A
- Community board
- 307
- Council district
- 38
- Block / lot
- 846 / 53
- Assessed value
- $480,150
- Landmark / historic district
- No
HPD registration #315221, last renewed Aug 28, 2025.
Questions about 349 58 Street
Who owns 349 58 Street?
The owner of record in NYC Department of City Planning PLUTO data is 349 58 St LLC.
Does 349 58 Street have violations?
Yes. NYC HPD has recorded 91 housing violations at this property.
Is 349 58 Street rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 349 58 Street built?
City records list 1906 as the year it was built.
How many apartments are in 349 58 Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.