5206 6 Avenue
Brooklyn, NY 11220BBL 3-00808-0038Map
Owner of record: Shifa Ho
5206 6 Avenue is a walk-up apartment building built in 1910 in Brooklyn, 11220. It has 16 residential units across 4 floors. The owner of record is Shifa Ho. HPD has recorded 118 housing violations here, most recently on September 2, 2026. 13 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 118
- DOB violations
- 6
- ECB violations
- 4
- HPD complaints
- 226
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 118
- BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 2, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard
Sep 2, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at boiler room door at cellar
Aug 20, 2026
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 10, 3rd story, 2nd apartment from south at west
Aug 20, 2026 · Apt 10
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of key oberated lock instaled at door leading to fire escape window in the 1st room from east at south located at apt 11, 3rd story, 1st apartment from north at east
Aug 20, 2026 · Apt 11
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at south located at apt 11, 3rd story, 1st apartment from north at east
Aug 20, 2026 · Apt 11
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 11, 3rd story, 1st apartment from north at east
Aug 20, 2026 · Apt 11
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 11, 3rd story, 1st apartment from north at east
Aug 20, 2026 · Apt 11
Open — Civ14 mailed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance lower sash at east window (fire escape window) in the 1st room from east at south located at apt 7, 2nd story, 1st apartment from north at east
Aug 20, 2026 · Apt 7
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 7, 2nd story, 1st apartment from north at east
Aug 20, 2026 · Apt 7
Open — Civ14 mailed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at apt door in the entrance located at apt 8, 2nd story, 2nd apartment from north at east
Aug 20, 2026 · Apt 8
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 16, 4th story, 1st apartment from north at east
Aug 20, 2026 · Apt 16
Open — Civ14 mailed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 10, 3rd story, 2nd apartment from south at west
Aug 20, 2026 · Apt 10
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 10, 3rd story, 2nd apartment from south at west
Aug 20, 2026 · Apt 10
Open — First no access to re- inspect violation - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Feb 25, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire door at south leading to the yard at public hall, 1st story
Dec 15, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of construction material and bicycles at public hall stairs, 4th story
Oct 21, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 15, 4th story, 2nd apartment from south at west
Oct 21, 2025 · Apt 15
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 15, 4th story, 2nd apartment from south at west
Oct 21, 2025 · Apt 15
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at south leading to the yard at public hall, 1st story
Oct 17, 2025
Closed — Violation dismissed - BHazardous
Replace with new the missing screen under the skylight at public hall, 4th story
Oct 17, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items, building material and bike at public hall, 4th story
Oct 17, 2025
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the all stairs and hallways at public hall
Oct 15, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at public hall, 1st story
Feb 24, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 12, 3rd story, 2nd apartment from south at west
Nov 25, 2024 · Apt 12
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 12, 3rd story, 2nd apartment from south at west
Nov 25, 2024 · Apt 12
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls & ceilings at all stories at public hall
Oct 16, 2024
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots (at front of building) at 1st fire escape from east, 3rd story
Oct 16, 2024
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degree at all water fixtures in the entire apartment located at apt 2, 1st story, 1st apartment from south at west
Oct 10, 2024 · Apt 2
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the floors and walls at all stories at public hall
May 13, 2024
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents rats in rear west section yard
Apr 22, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of baby carriage on the floor, at public hall, 1st story
Apr 22, 2024
Closed — Violation dismissed - BHazardous
Replace with new the missing missing cover lids at garbage cans,in south middle sections, at fire passage way
Apr 22, 2024
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south middle sections at fire passage way
Apr 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing [rope coiled from apt 1 door konb to vestibule door knob ] , at public hall, 1st story
Apr 22, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 3, 2024
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd story balcony at fire escape at east
Mar 17, 2024
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the stairs and public halls all stories at public hall
Jan 10, 2024
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of gas stove at public hall, 2nd story
Nov 22, 2023
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule at public hall, 1st story
Nov 22, 2023
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 20, 2023
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl tile at floor at vestibule at public hall, 1st story
Dec 14, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl tile at floor at public hall, 1st story
Dec 14, 2022
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of plexiglass installed at door to south court at public hall, 1st story
Dec 14, 2022
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of plexiglass installed at vestibule door at public hall, 1st story
Dec 14, 2022
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of plexiglass installed at building entrance door at public hall, 1st story
Dec 14, 2022
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at public hall stairs, 4th story
Dec 14, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace with new the missing lockset device at vestibule door at public hall, 1st story
Nov 23, 2022
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 2nd story balcony, building front at fire escape, 2nd story
Nov 23, 2022
Closed — Violation dismissed
DOB building violations · 6
- Construction other optional
C-construction other optional
Jul 8, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jul 25, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 17, 1992
Dob violation - active - Construction other optional
C-construction other optional
Aug 17, 1992
Dob violation - active
ECB violations · 4
- Class - 3
Debris and storage in boiler room/front and rear flame sight glasses defective/no 8x8 door at base of boiler chimney/no 8x8 door at base of hwh chimney/thermostat is defective;correct violation and submit the c
Nov 28, 2022
Resolve - Non-hazardous
Failure to maintain bldg defect is storm drains at right & left side of bldg is clogged with dirt waste & water.yard drains blocked up causing water unable to drain as require at side yard one tread of step 1st
Dec 7, 2007 · Penalty $800
Resolve - Hazardous
Failure to maintain bldg hazardous public hallway masonry wall at 1st fl has shifted leaning 3" out of plumb by staircase steel frame staircase has also shifted wit a twisted bannisters railing
May 16, 2006 · Penalty $800
Resolve - Hazardous
Failure to maintain bldg-hazardous noted: stair well steel newel posts twisted 5" out of plumb with platform risers sagging/out of level cracked marble treads/platforms. window missing stairwell btw 2nd & 3rd f
Aug 17, 2004 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Pests
Oct 20, 2026 · Apt 10
Open - Unsanitary condition
Pests
Jun 2, 2026 · Apt 10
Close - Unsanitary condition
Mold
Jun 2, 2026 · Apt 10
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 7, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2025 · Apt 3
Close - Heat/hot water
Entire building
Oct 21, 2025 · Apt 15
Close - Heat/hot water
Entire building
Oct 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 16, 2025 · Apt 12
Close - Heat/hot water
Entire building
Oct 14, 2025 · Apt 8
Close - Heat/hot water
Entire building
Mar 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 4, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 30, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 30, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 10, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
May 13, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 20, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 20, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 11, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 5, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 11, 2024 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1910
- Floors
- 4
- Residential units
- 16
- Building area
- 12,460 ft²
- Lot area
- 3,500 ft²
- Zoning
- R6A
- Community board
- 307
- Council district
- 38
- Block / lot
- 808 / 38
- Assessed value
- $253,350
- Landmark / historic district
- No
HPD registration #319717, last renewed Aug 25, 2025.
Questions about 5206 6 Avenue
Who owns 5206 6 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Shifa Ho.
Does 5206 6 Avenue have violations?
Yes. NYC HPD has recorded 118 housing violations at this property.
Is 5206 6 Avenue rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 5206 6 Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 5206 6 Avenue?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.