313 52 Street
Brooklyn, NY 11220BBL 3-00798-0001Map
Owner of record: 313 52 Realty LLC
313 52 Street is an elevator apartment building built in 2016 in Brooklyn, 11220. It has 12 residential units across 6 floors. The owner of record is 313 52 Realty LLC. HPD has recorded 268 housing violations here, most recently on September 30, 2026. 42 of the 50 most recent violations are still open. City tax records listed 12 rent-stabilized apartments here in 2024.
- HPD violations
- 268
- DOB violations
- 4
- ECB violations
- 37
- HPD complaints
- 106
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 268
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 2a, 2nd story, 2nd apartment from south at west
Sep 30, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 2a, 2nd story, 2nd apartment from south at west
Sep 30, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 2a2r, 2nd story, 2nd apartment from west at north
Aug 11, 2026 · Apt 2A2R
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 2a2r, 2nd story, 2nd apartment from west at north
Aug 11, 2026 · Apt 2A2R
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall stairs, 1st story
Jun 1, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall stairs, 2nd story
Jun 1, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall stairs, 3rd story
Jun 1, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall stairs, 4th story
Jun 1, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall at public hall, 1st story
Jun 1, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling at public hall stairs, 6th story original violation 18972640 issued 01-jun-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jun 1, 2026
Open — Nov sent out
Show 40 more ↓
- BHazardous
Remove all encumbrances consisting of household items at public hall stairs, 5th story
Jun 1, 2026
Open — Nov sent out - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate in the entire apartment located at apt 2a, 2nd story, 2nd apartment from west at north
Jun 1, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at ceiling in the 3rd room from north located at apt 2a, 2nd story, 2nd apartment from west at north
Jun 1, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 2a, 2nd story, 2nd apartment from west at north
Jun 1, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 2a, 2nd story, 2nd apartment from west at north
Jun 1, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 1st story
Jun 1, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at cellar level at public hall stairs
Jun 1, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at ceiling and all walls at cellar level at public hall
Jun 1, 2026
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 1st compactor closet at east at cellar level at public hall
Jun 1, 2026
Open — Nov sent out - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the water at public hall
Jun 1, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at cellar level at public hall
Jun 1, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at cellar level at public hall
Jun 1, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at cellar level at public hall
Jun 1, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling at public hall stairs, 6th story
Jun 1, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall stairs, 6th story
Jun 1, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall stairs, 6th story
Jun 1, 2026
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling at public hall stairs, 6th story
Jun 1, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective all concrete treads from bottom up at public hall stairs, 6th story
Jun 1, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at public hall stairs, 6th story
Jun 1, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective all concrete treads from bottom up at public hall stairs, 4th story
Jun 1, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall stairs, 4th story
Jun 1, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall stairs, 4th story
Jun 1, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall stairs, 3rd story
Jun 1, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall stairs, 3rd story
Jun 1, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective all concrete treads from bottom up at public hall stairs, 3rd story
Jun 1, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall stairs, 2nd story
Jun 1, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling at public hall stairs, 2nd story
Jun 1, 2026
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall stairs, 2nd story
Jun 1, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall stairs, 1st story
Jun 1, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall stairs, 1st story
Jun 1, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling at public hall stairs, 2nd story original violation 18972626 issued 01-jun-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jun 1, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at basement
May 29, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling at at basement original violation 18965925 issued 29-may-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
May 29, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall at public hall
May 29, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling at at basement
May 29, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at basement
May 29, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at basement
May 29, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
May 29, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at west wall at vestibule at public hall
May 29, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of ladders at public hall, 6th story
May 15, 2026
Open — Nov sent out
DOB building violations · 4
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 4, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 20, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 29, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 26, 2017
Dob violation - dismissed
ECB violations · 37
- Class - 1
Cease use item: 1) bypassed hoistway access door switch (2.7.6.3.4.). class 1 item : no data plate indicating presence of door lock monitoring in this controller (a17.3 3.10.12.). class 2 items: provide in case
Sep 10, 2026 · Penalty $3,125
Active - Class - 2
5.1.21.1 emergency signal car phone inoperative, governor access door hinges need to be properly secure and self locking, maintenance log book need to be updated, control space door need to be self locking. mai
Aug 19, 2026 · Penalty $625
Active - Class - 2
Observed in the basement/cellar door in the gas meter room not self closing., repair and/or replace
May 22, 2024
Resolve - Class - 2
Observed in apartment 6 b and 5 b defective copper piping used for the condensation line from the boiler. 102.3 maintenance. installations, both existing and new, and parts thereof shall be maintained in proper
May 22, 2024
Resolve - Class - 1
Observed at basement level in the gas meter, sprinkler and water meter room, the meter bars are rusted and corroded. as per 102.3 maintenance. installations, both existing and new, and parts thereof shall be ma
May 22, 2024 · Penalty $625
Resolve - Class - 1
Class 2: perform and file cat 1 year test., perform brake maintenance and provide brake tag with date entered in full., provide up to date elevator maintenance log., service and tag motor room fire extinguisher
Jan 24, 2024 · Penalty $6,250
Active - Class - 2
Repair lobby hall station button., repair car station door close button., repair in-car emergency phone., provide in-car mirror., repair pit light., provide in-case of fire signs on basement, 2nd, 3rd, 4th and
May 25, 2023 · Penalty $6,250
Active - Class - 2
Failure to maintain building in code-complaint manner; observed at exposure 4 on a 5 story building roof water gutter/drainage leader broke and not tied into storm drain (on 52 street). this condition is a pote
May 4, 2023
Resolve - Class - 2
Repair lobby hall station button. repair door close button on car station. repair phone in car. provide cat 1 and 5 tags. provide fire extinguisher. repair floor count in car and hall station.
Jan 4, 2023 · Penalty $625
Resolve - Class - 2
Missing cab mirror. missing in case of frie sign in basement. inoperative phone. damaged door open button. inoperative pit light. inoperative machine light. gov/machine access door unlocked. machine room door u
Sep 15, 2022 · Penalty $625
Resolve
Show 27 more ↓
- Class - 2
Replace lobby hall station button. replace car station button. repair phone in car. provide fire extinguisher. provide light in motor room. repair floor count on car station.
Aug 3, 2022 · Penalty $655
Resolve - Class - 1
Cease use item : when car goes to third floor not level by 3 inches . non cease use items : missing lobby sign for location of control space , provide / in car lights flickering , repair / no certificate frame
May 12, 2021 · Penalty $6,250
Active - Class - 1
1) no door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. this is a controller feature which ensures passenger safety. remedy; file application, install dl
Oct 12, 2020 · Penalty $3,125
Resolve - Class - 2
34.b.07,40.b.09,40.b.07,30.b.07,45.b,07,46.b.07,57.b.07,59.u.15,67.x.10,70.o.02,80.b.07,40.(b).07,97.b.07:34-b-07:provide limit swicth on door;30-b-07:pin final limts;40-b-09:remove wood:40-b-07:provide fire ex
Oct 3, 2018 · Penalty $1,562
Resolve - Class - 2
Bc3303.11 no temp lighting in stairways. noticed at time of inspection nb in progress noticed on 5th and 6th floor staircase not temp lighting. staircase dark with workers working and using stairs rem: provide
Aug 30, 2017 · Penalty $2,000
Resolve - Class - 1
Noticed at time of inspection nb in progress noticed no guardrails provided at open elevator shaftway in basement. approx 5 foot deep as well as active elevator car moving up and down causing hazard to workers.
Aug 30, 2017 · Penalty $6,000
Resolve - Class - 2
Work does not conform.at time of inspection on an active site,observed that scaffold does not conform to approved plans scaffold was incomplete on expo 4.stop all work 10ft from edge of scaffold at expo 4.rem:c
Jun 8, 2017 · Penalty $2,500
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. at time of inspection of a 6 sty nb,currently 6 sty high observed workers performing masonary work on the 6th fl at exp#1&2 on a
May 1, 2017 · Penalty $12,500
Resolve - Class - 2
Sec. 3301.1.3 design drawing for electric hoist. note: at time of inspection answering to complaint #3598719 of a 6 sty nb manufacture specifications of hoist does not comply due to use of cmu blocks used as
Apr 18, 2017 · Penalty $4,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations: no adequate egress. @ time of insp of an active 4 stories bldg observed inadequate means of egress from 5th flr to working deck 6
Apr 17, 2017 · Penalty $25,000
Resolve - Class - 1
Construction superintendent fails to maintain and/or make job site logs available. at the time of inspection of a 6story bldg being constructed.upon request for construction superintendent logs as required
Apr 17, 2017 · Penalty $25,000
Resolve - Class - 1
Failure to institute/maintain: no guardrails.@the time of insp of an active 4 stones bldg observed inadequate guardrails @exp #1,2 &3,plywood held by cmu block as support provided as a guardrail.during insp,the
Apr 17, 2017 · Penalty $12,000
Resolve - Class - 1
Sec: 3301.6. design drawing required by the provision of chapter 33 of nyc bc. @ time of insp observed a platform affixed in the elevator shaft on the 1st & 5th flr. the platform on the 1st flr was storing cons
Apr 17, 2017 · Penalty $8,000
Resolve - Class - 2
Failure to provide approved/accepted plans. @ time of insp of an active 4 stories bldg observed 6 stories as against the approved 4 stories. no approved or amended documents to show the work being done. stop al
Apr 17, 2017 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operations. @ time of insp active job site. cmu blocking being placed @ 6th flr no over head protection provided for adjacent property in the
Apr 17, 2017 · Penalty $10,000
Resolve - Class - 1
Const superintendent failed to perform duties as per rule.@time of insp the following hazardous conditions were observed.1)no super or logs on site 2)no (ohp) provided @exp 3 & 4.3)inadequate egress.4)no guardr
Apr 17, 2017
Resolve - Class - 1
Failure to maintain adequate housekeeping. @ time of insp of an active 4 stories bldg observed inadequate housekeeping from 1st-5th flr & most importantly @ the staircase area. this creates a hazardous conditio
Apr 17, 2017 · Penalty $12,000
Resolve - Class - 1
Sec. 3304.7 no means of egress for excavation. noticed at time of inspection excavated hole approx 20feet deep w/workers inside no means of egress provided. remedy: stop all work provide egress.
Nov 22, 2016 · Penalty $8,000
Resolve - Class - 2
Fence not to code. noticed fence erected at exp#4 not to code fence in place approx 4feet in height not hte required 8foot. remedy: stop all work constract fence to code.
Nov 22, 2016 · Penalty $4,000
Resolve - Class - 2
No project information panel provided. noticed at time of inspection nb in progress noticed no project information panel posted on site. remedy: remedy: provide project information panel as per code.
Nov 22, 2016 · Penalty $4,000
Resolve - Class - 2
No fence viewing panel provided. noticed at time of inspection nb in progress noticed job site fence erected on site no viewing panels provided. remedy: provide viewing panels as per code.
Nov 22, 2016 · Penalty $4,000
Resolve - Class - 1
Sec. 3301.02 failure to adequately carried out your duties. the following hazardous conditions observed & swo issued. no egress for excavated hole,no guardrails for excavated hole. fence not to code,sidewalk ha
Nov 22, 2016
Resolve - Class - 1
Sec. 3304.4.4 no guardrails for excavation. noticed at time of inspection. excavation wokr in progress. noticed excavated hole approx 20feetdeep w/no guardrails around hole. remedy: stop all work provide guardr
Nov 22, 2016 · Penalty $8,000
Resolve - Class - 1
Sec. 3303.4.1 maintanance all site shall be free of tripping hazards. noticed at time of inspection nb in progress. noticed at exp#1 pedestrian sidewalk not maintained to code free of tripping hazards. sidewalk
Nov 22, 2016 · Penalty $8,000
Resolve - Class - 2
Failure to post permit for work at premises. noted: construction fence in place @above locations. no fn permit posted. remedy: post permit.
Jun 6, 2013 · Penalty $800
Resolve - Class - 1
Abandoned and discontinued operations failure to provide a solid 8ft construction or demolition operations have been abandoned discontinued or interrupted noted at exp1 jobsite fence collapsed making site hazar
Oct 19, 2009 · Penalty $400
Resolve - Class - 2
Job site fence not constructed pursuant to subsection noted 8ft const fence (plywood) erected w/ permit 301919271 has front (52 st site) colapsed inward approx 18ft remedy: repair & or replace fence
Oct 13, 2009 · Penalty $4,000
Resolve
Complaints
- Water leak
Heavy flow
Sep 27, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Sep 27, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Sep 27, 2026 · Apt 2A
Close - Unsanitary condition
Mold
May 25, 2026 · Apt 2A
Close - Water leak
Heavy flow
May 25, 2026 · Apt 2A
Close - Water leak
Slow leak
May 25, 2026 · Apt 2A
Close - Door/window
Door
Mar 25, 2026 · Apt 6L
Close - Heat/hot water
Apartment only
Mar 18, 2026 · Apt 6L
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 2A2R
Close - Heat/hot water
Apartment only
Jan 13, 2026 · Apt 5A
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Jan 13, 2026 · Apt 5A
Close - General
Janitor/super
Jan 13, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Jan 5, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Jan 3, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Dec 28, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Electric
Power outage
Dec 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2025 · Apt BLDG
Close - Water leak
Slow leak
Dec 5, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt 6L
Close - Heat/hot water
Apartment only
Dec 5, 2025 · Apt 6AOR6L
Close - Unsanitary condition
Pests
Dec 5, 2025 · Apt 6AOR6L
Close - General
Ventilation system
Dec 5, 2025 · Apt 6AOR6L
Close - Unsanitary condition
Mold
Jul 30, 2025 · Apt 2A
Close - Unsanitary condition
Mold
Jul 30, 2025 · Apt 2A
Close - Unsanitary condition
Garbage/recycling storage
Feb 22, 2025 · Apt BLDG
Close - Flooring/stairs
Floor
Jan 20, 2025 · Apt 5R
Close - Water leak
Damp spot
Jan 20, 2025 · Apt 5R
Close - Door/window
Window frame
Jan 20, 2025 · Apt 5R
Close - Unsanitary condition
Mold
Sep 16, 2024 · Apt 3A
Close - Water leak
Slow leak
May 5, 2024 · Apt 2B
Close - Paint/plaster
Ceiling
Apr 28, 2024 · Apt 2B
Close - Safety
Smoke detector
Apr 28, 2024 · Apt 2B
Close - Flooring/stairs
Floor
Apr 16, 2024 · Apt 4L
Close - Elevator
Maintenance
Apr 16, 2024 · Apt 4L
Close - Electric
Lighting
Apr 14, 2024 · Apt 3RB
Close - Electric
Wiring
Apr 14, 2024 · Apt 3RB
Close - Water leak
Heavy flow
Apr 14, 2024 · Apt 3RB
Close - Unsanitary condition
Mold
Apr 14, 2024 · Apt 3RB
Close - Electric
Lighting
Apr 14, 2024 · Apt 3RB
Close - Electric
Wiring
Apr 14, 2024 · Apt 3RB
Close - Water leak
Heavy flow
Apr 14, 2024 · Apt 3RB
Close - Door/window
Door
Jan 22, 2024 · Apt 5L
Close - Outside building
Roof door/hatch
Jan 22, 2024 · Apt PH
Close - Unsanitary condition
Pests
Jan 22, 2024 · Apt 2A
Close - Unsanitary condition
Pests
Jan 22, 2024 · Apt 2A
Close - Electric
No lighting
Nov 30, 2023 · Apt BLDG
Close - Plumbing
Basin/sink
Aug 1, 2023 · Apt 1A
Close - Door/window
Door
Jul 10, 2023 · Apt 3A
Close - Appliance
Electric/gas range
Jul 10, 2023 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2016
- Floors
- 6
- Residential units
- 12
- Building area
- 11,120 ft²
- Lot area
- 2,103 ft²
- Zoning
- R6B
- Community board
- 307
- Council district
- 38
- Block / lot
- 798 / 1
- Assessed value
- $1,079,550
- Landmark / historic district
- No
HPD registration #387952, last renewed Dec 18, 2025.
Questions about 313 52 Street
Who owns 313 52 Street?
The owner of record in NYC Department of City Planning PLUTO data is 313 52 Realty LLC.
Does 313 52 Street have violations?
Yes. NYC HPD has recorded 268 housing violations at this property.
Is 313 52 Street rent stabilized?
NYC Department of Finance tax bills listed 12 rent-stabilized units here in 2024 (about 100% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 313 52 Street built?
City records list 2016 as the year it was built.
How many apartments are in 313 52 Street?
It has 12 residential units and 13 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.