Owner of record: NYC School Construction Authority
840 5 Avenue is a school building built in 2020 in Brooklyn, 11232. The owner of record is NYC School Construction Authority. HPD has no housing violations on record for this property.
- HPD violations
- 0
- DOB violations
- 27
- ECB violations
- 22
- HPD complaints
- 0
What to know
No open immediately-hazardous violations among recent records.
HPD has not cited this building.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. The newest 10 per agency here; the full lists are a click away.
HPD housing violations · 0
No HPD violations on record
DOB building violations · 27
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Construction other optional
Vehicle impacting sidewalk shed
Jul 8, 2021
Dob violation - active - Construction other optional
C-construction other optional
Mar 8, 2019
Vp*-violation unserved ecb- dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed
ECB violations · 22
- Class - 1
Failure to notify dept of accident/incident that resulted in fatality or injury.noted:boom of crane hit second stroy damaged adjacent property.as per check of dept records permit holder failed to notify dob wit
Sep 8, 2022
Resolve - Class - 1
Observed workers on supported scaffold at exp 2 with facade completed up to 2nd story height and no sidewalk shed in place to protect pedestrians walking on temporary sidewalk in a roadway that is within half o
Aug 9, 2022
Resolve - Class - 1
Observed 8ft high chainlink fence at exp2 with netting attached and posts rest on ground hold by sandbags creating hazard for public - no adequate measures provided to hold posts in an upright position restrain
Aug 3, 2022 · Penalty $500
Resolve - Class - 2
Observed 8ft high chainlink construction fence along exp 2 sidewalk with netting attached and posts hold by sandbags. upon request for design drawings for the above temporary construction equipment none were pr
Aug 3, 2022
Resolve - Class - 1
Observed crane collapsed at exp 2&3 causing damage. upon review of ccd1 provided in lieu of sidewalk shed all operations on western elevation to be ceased including roof, however, materials lifting operation fr
Aug 3, 2022 · Penalty $2,500
Resolve - Class - 1
In response to incident observed crane at exp3 collapsed onto right side towards exp 2, damaged adjoining property, delivery truck, and public property. observed outriggers not extended on right side as per man
Aug 3, 2022
Resolve - Class - 1
Reliable lifting, owner of knuckle boom, operating without outrigger extended of pick side of crane. causing crane to tip over, boom collapsed into adjacent occupied building with the boom laid across the stree
Aug 3, 2022
Resolve - Class - 1
Reliable lifting, owner of knuckleboom, operating to hoist material to roof of building. outriggers not extended on pick side of crane. as pick was attempted, crane was overloaded, safety shut off was over ridd
Aug 3, 2022 · Penalty $10,000
Resolve - Class - 1
Knuckleboom operating without outrigger extended of pick side of crane. causing crane to tip over, boom collapsed into adjacent occupied building with the boom laid across the street. massive & catastrophic acc
Aug 3, 2022
Resolve - Class - 1
Knuckleboom operating to hoist material to roof of building. outriggers not extended on pick side of crane. as pick was attempted, crane was overloaded, safety shut off was over ridden, and tipped over. boom of
Aug 3, 2022 · Penalty $10,000
Resolve
Complaints
No HPD complaints in our records
Sales history
No recorded sales in our data
Building details
- Building type
- School building (W1)
- Year built
- 2020
- Floors
- 4
- Residential units
- —
- Building area
- 48,647 ft²
- Lot area
- 19,605 ft²
- Zoning
- M1-2
- Community board
- 307
- Council district
- 38
- Block / lot
- 693 / 39
- Assessed value
- $5,159,250
- Landmark / historic district
- No
Questions about 840 5 Avenue
Who owns 840 5 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is NYC School Construction Authority.
Does 840 5 Avenue have violations?
NYC HPD has no housing violations on record for this property.
Is 840 5 Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 840 5 Avenue built?
City records list 2020 as the year it was built.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.