563 Warren Street
Brooklyn, NY 11217BBL 3-00395-0056Map
Owner of record: 563 Warren LLC
563 Warren Street is a walk-up apartment building built in 1959 in Brooklyn, 11217. It has 8 residential units across 4 floors. The owner of record is 563 Warren LLC. HPD has recorded 8 housing violations here, most recently on October 5, 2022. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 8
- DOB violations
- 14
- ECB violations
- 9
- HPD complaints
- 29
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 8
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestibule at public hall, 1st story
Oct 5, 2022
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eyelet installed from east wall to vestible door at public hall, 1st story
Oct 5, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4r, 4th story, 2nd apartment from west at north
Jul 10, 2022 · Apt 4R
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ..
Nov 27, 2020
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots on 4th and 3rd story balconies at building front fire escape
Dec 9, 2019
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Nov 22, 2019
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 22, 2019
Closed — Violation dismissed - BHazardous
Provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the foyer located at apt 1l, 1st story
Dec 27, 2000 · Apt 1L
Closed — Violation dismissed
DOB building violations · 14
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Construction other optional
Hazardous
Jan 4, 2001
Dob violation - active - Construction other optional
C-construction other optional
Sep 6, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 16, 1993
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 1, 1993
Dob violation - dismissed
ECB violations · 9
- Class - 2
Debris in boiler room-holes above gas meters + gas meter area is not ventilated
Jan 29, 2019
Resolve - Hazardous
Failure to maintain bldg -hazardous-work noted:at interior bldg bstw floor,ceiling area several joist rotten bending. 2)bearing wall (east)cracks(vertical) in various locations.remedy:maintain bldg.immediately
Jul 31, 2003 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior of bldg.note header over main entry door cracked at middle and a piece missing.window header at north corner third floor missing and cracks along the south corner of facade.remedy:
Jul 30, 2003 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior bldg wall.defects are front facade are cracked vertically and horizontally approx 1"wide from grade to 4th story various locations.also loose and missing over windows.remedy:
Jul 2, 2003 · Penalty $800
Resolve - Non-hazardous
Failure to maintain building. defects are apartments 3r and 4r east walls and ceiling are cracked approximately 1/2" wide at various locations. remedy: repair ceilings and walls forthwith.
Jul 2, 2003 · Penalty $500
Resolve - Non-hazardous
Failure to maintain exterior building wall hazardous. deject's noted +at east side of brown stone facade (front of bldg). there are stress cracks running verticaly from 1st floor to 4th . thru - out. (2) at gr
Jun 12, 2003 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior building wall. at east side front facade of brownstone, vertical cracks, running from 1st to 3rd stories. remedy: provide , or file a report from a licensed professional engineer or
Mar 20, 2003
Resolve - Hazardous
Failure to maintain exterior building wall.in that a vertical crack occurs at east brick exterior wall east.approx 20ft high with approx (1/4")one quarter of an inch air gap,but,this crack extends from 2nd to
Jan 4, 2001 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior building.wall noted:south exterior masonry wall cracked from grade up to 2nd floor 2.pylaster at entrance to bldg cracked ubove entrance way to building.3.various vertical cracks on
Sep 6, 2000 · Penalty $350
Resolve
Complaints
- Heat/hot water
Apartment only
Jan 30, 2026 · Apt 3L
Close - Heat/hot water
Apartment only
Oct 3, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Jul 8, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Feb 1, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Jan 26, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Jan 17, 2022 · Apt 4R
Close - Heat/hot water
Apartment only
Jan 16, 2022 · Apt 4R
Close - Heat/hot water
Entire building
Jan 30, 2021 · Apt 3L
Close - Heat/hot water
Apartment only
Nov 25, 2020 · Apt 3L
Close - Unsanitary condition
Sewage
Dec 1, 2019 · Apt 1L
Close
Show 19 more ↓
- Heat/hot water
Apartment only
Nov 21, 2019 · Apt 3L
Close - Unsanitary condition
Sewage
Oct 31, 2019 · Apt 1L
Close - Heating
Heat related
Dec 21, 2007 · Apt 3L
Close - Heating
Heat related
Mar 17, 2004 · Apt 3R
Close - Heating
Heat related
Feb 11, 2004 · Apt 3R
Close - Heating
Heat related
Feb 11, 2004 · Apt 4R
Close - Heating
Heat related
Feb 4, 2004 · Apt 4R
Close - Heating
Heat related
Feb 3, 2004 · Apt BLDG
Close - Heating
Heat related
Feb 3, 2004 · Apt 4R
Close - General
Windows
Jan 15, 2004 · Apt 4L
Close - Heating
Heat related
Jan 15, 2004 · Apt 4L
Close - Heating
Heat related
Nov 10, 2003 · Apt 3R
Close - Paint/plaster
Ceiling
Aug 6, 2003 · Apt 3-R
Close - Paint/plaster
Ceiling
Aug 6, 2003 · Apt 3-R
Close - General
Doors
Aug 6, 2003 · Apt 3-R
Close - Paint/plaster
Wall
Aug 6, 2003 · Apt 3-R
Close - Nonconst
Smoke detector
Aug 6, 2003 · Apt 3-R
Close - General
Locks
Aug 6, 2003 · Apt 3-R
Close - General
Locks
Aug 6, 2003 · Apt 3-R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1959
- Floors
- 4
- Residential units
- 8
- Building area
- 6,480 ft²
- Lot area
- 2,500 ft²
- Zoning
- R7B
- Community board
- 302
- Council district
- 39
- Block / lot
- 395 / 56
- Assessed value
- $1,651,500
- Landmark / historic district
- No
HPD registration #336932, last renewed Aug 6, 2025.
Questions about 563 Warren Street
Who owns 563 Warren Street?
The owner of record in NYC Department of City Planning PLUTO data is 563 Warren LLC.
Does 563 Warren Street have violations?
Yes. NYC HPD has recorded 8 housing violations at this property.
Is 563 Warren Street rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 88% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 563 Warren Street built?
City records list 1959 as the year it was built.
How many apartments are in 563 Warren Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.