101 3 Avenue
Brooklyn, NY 11217BBL 3-00389-0005Map
Owner of record: 316 Bergen Owner, LLC
101 3 Avenue is an elevator apartment building built in 2014 in Brooklyn, 11217. It has 84 residential units across 8 floors. The owner of record is 316 Bergen Owner, LLC. HPD has recorded 14 housing violations here, most recently on February 6, 2026. 2 of the 14 most recent violations are still open. City tax records listed 84 rent-stabilized apartments here in 2024.
- HPD violations
- 14
- DOB violations
- 10
- ECB violations
- 40
- HPD complaints
- 34
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 14
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 801, 8th story, 1st apartment from south at west
Feb 6, 2026 · Apt 801
Closed — Violation closed - ANon-hazardous
Refit door at compactor closet, 6th story
Dec 8, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 212, 2nd story, 2nd apartment from north at east
Feb 9, 2023 · Apt 212
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Sep 11, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 11, 2018
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor (missing) at public hall, 1st story
Sep 11, 2018
Open — Not complied with - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Sep 11, 2018
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box (missing) at public hall, 1st story
Sep 11, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 11, 2018
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 14, 2018
Closed — Violation closed
Show 4 more ↓
- ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Aug 14, 2018
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Aug 14, 2018
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall, 1st story
Aug 14, 2018
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Aug 14, 2018
Open — Not complied with
DOB building violations · 10
- Elevator elevatorrequired
E-elevator elevatorrequired
Aug 13, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 13, 2021
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 23, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
May 10, 2001
Dob violation - active
ECB violations · 40
- Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure or a periodic inspection of a parking structure(pips) report documenting the conditions of psid#b000
Oct 1, 2024 · Penalty $2,500
Resolve - Class - 1
Failure to institute/maintain safety equip measures or temp const no hand rails.@ the time of my insp const work in progress.i observed a step leading from the main fl to the 2nd.approx 12 ft high,no handrails
Apr 25, 2014 · Penalty $1,000
Resolve - Class - 1
Failure to have osha 10 cert.@ the time of my insp,const work in progress.i observed @ expo 1 a worker lean a,a-fraim ladder unto the wall doing sheet rock work such as cutting into the wall.on request for osha
Apr 25, 2014 · Penalty $800
Resolve - Class - 2
3301.1.2 failure to comply w/nyc fire code.general no valid permit obtained @ time of insp for ext rental generator powering hoist w/129 galfuel capacity.permit shown has expired on 03/26/14 & is a photo copy.
Apr 23, 2014 · Penalty $800
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temp.construction.no guard rails.noted:@ 8 story new bldg under construction @ 7th fl set back @ exp.1.2 workers observed installing facade wall with n
Apr 23, 2014 · Penalty $800
Resolve - Class - 2
3303.12 hoist failure to have elevator in readiness.noted:@ time of inspection with 8 story bldg under construction @ approx.80' in height,hoist not operational without generator working.generator has no valid
Apr 23, 2014 · Penalty $800
Resolve - Class - 1
Failure to institue/maintain safety equipment measures or temporary const'n - no handrails. note at the time of my inspection. const'n work in progress. i observed that there were no handrails provided from th
Mar 26, 2014 · Penalty $5,000
Resolve - Class - 2
Fail notify dept/obtain permit prior to use/inst off c-hook/outrigger beams in connected w/s.s.note:8-story nb under constr has 2-pt suspended scaffold erected w/outrigger beams @exp#2 w/last notification 2/21/
Mar 11, 2014 · Penalty $4,000
Resolve - Class - 1
Fail to institute/maintain safety equipment measures - no handrails.note:@8-story nb under construction no handrails observed thruout interior staircases.rem:immediately provide handrails.
Mar 11, 2014 · Penalty $5,000
Resolve - Class - 1
Use of supported scaffold w/o a scaffold user cert.note:workers on supported pipe scaffold @exp #3 @rod lvl approx 3 workers could not produce 4-hr user certificates as req by code.also interior 6'h scaffold 1
Mar 11, 2014 · Penalty $8,000
Resolve
Show 30 more ↓
- Class - 1
3314.8 guard rail & toe board.note:@8-story nb under construction,@bulkhead lvl, 3 stage pipe scaffold erected w/no guard rail or toe board.obs 2 men on scaffold in hazard or potential fall.rem:provide guardrai
Mar 11, 2014 · Penalty $8,000
Resolve - Class - 1
250.4 non current carrying electrical conductive material is not grounded.sidewalk shed is metal & could be enegised.rem:comply with ec code
Mar 8, 2014 · Penalty $8,000
Active - Class - 2
Failure to install ground fault circuit interrupter gfci protection asrequired no gfci provided in side walk shed.rem:install gfci protection.
Mar 8, 2014 · Penalty $10,000
Active - Class - 1
Failure to safeguard all persons and property affected by constructionoperations. at time of inspection observed suspended scaffold, outriggers attached to jobsite. 320 bergen property adjacent property at expo
Jan 15, 2014 · Penalty $2,400
Resolve - Class - 1
Bc3301.2. adequate means of egress.noted at the time of inspection supported pipe scaffold erected at exp3 to the height aprpx 80' no means of egress or ingress/stairtower provided/found at time of inspection.
Dec 23, 2013 · Penalty $1,600
Resolve - Class - 2
Sec. 3314.5.5. platforms are not tied down. at the time of inspection observed wood planks throughout the approx 80'high scaffold are not tied down, cleated or otherwise restrained by hooks or equivalent means
Dec 23, 2013 · Penalty $830
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendments. at the time of inspection observed - scaffold approved plan shows a single (one) fully planked platform on the scaffold bt
Dec 23, 2013 · Penalty $530
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements an excessive amount of materials,debris and other various types of materials and tools were observed throughout interior and exterior of bldg
Dec 23, 2013 · Penalty $400
Resolve - Class - 1
3301.7 designs drawing required by the provision of chapter 33 of nyc bldg code. no design drawing were provided at site for 2 point suspended scaffolds at exposure 2.also no notification number partial stop wo
Dec 23, 2013 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction. no guardrails. guardrais were missing at all patios at exps 1&3 and terraces at 7th flr. remedy: provide guard railing where
Dec 23, 2013 · Penalty $1,200
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction. no handrails.staircase handrails were missing from the 2nd floor to the 5th floor.some handrails that were installed were too
Dec 23, 2013 · Penalty $1,000
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of insp. noted: at time of inspection approved plans were not available. - after initial inspection,project manager arrived w/plans. remedy:conform
Jul 10, 2013
Resolve - Class - 2
Contrary to approved plans. noted: at time of inspection installed equipment does not match approved plans - at sidewalk shed @ exp #4 was contrary to approved drawings - the following items were incorrect:
Jul 10, 2013
Resolve - Class - 2
Job site fence not constructed pursuant to subsection. at the time of my inspection approx 30 workers on site bldg,structure upto 3fl. i observed job site fence missing at exposure 3,4 a partial stop work order
Jul 1, 2013
Resolve - Class - 1
Sec. 3301.1.2 failure to comply w/nyc fire code. no permit for gasoline on site. at the time of my inspection bldg structure upto 3 story. approx 30 workers on site. i observed a storage shed for gasoline fuel
Jul 1, 2013 · Penalty $8,000
Resolve - Class - 1
Use of supported scaffold w/o a scaffold user certificate. at the timeof my inspection approx 30 workers on site. i observed a supported pipe scaffold was erected approx 15 feet high & 4 worker on top of scaffo
Jul 1, 2013 · Penalty $8,000
Resolve - Class - 1
Sec. 3307.3 failure to provide overhead protection for walkway & sidewalk. at the time of my inspection approx 30 workers on site i observed bldg structure upto 3 story & approx 3 feet from the public sidewalk
Jul 1, 2013 · Penalty $8,000
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements. atthe time of my inspection bldg structure upto 3 story i observed combustible material in excess of 20 qb (yard) no debris container was
Jul 1, 2013 · Penalty $12,000
Resolve - Class - 2
Sec. 3306.7 demolation of weakend structures. at the time of my inspection,approx 10 workers on site demolishing 1 story bldg. i observed atexposure 1 & 4,a lintel approx 1ft x 6inches wide supporting the party
Oct 11, 2012
Resolve - Class - 1
Failure to provide flag persons. at the time of inspection approx 10 worker on site demoing & cleaning up site. i observed a dump truck w/njregistration plate #aj524c. backing up into job site no flag person
Oct 11, 2012 · Penalty $8,000
Resolve - Class - 2
Sec. 3303.2.4 failure to provide sanitary facilities on demolition site. at the time of my inspection approx 5 workers on site. i observed no sanitary facilities on site. on request for sanitary facilities
Oct 1, 2012
Resolve - Class - 2
Failure to post "no smoking" signs on demolition site at the time of inspection. approx 5 workers on site demolishing 1 story building. i observed "no smoking" signs posted w/i or outside of demolition site. in
Oct 1, 2012
Resolve - Class - 1
Sec. 3303.5.2 dropping or throwing prohibited. at the time of inspection,approx 5 workers on a active demo site. i observed workers working on the roof of a 1 story building demolishing parapet walls,& dropping
Oct 1, 2012 · Penalty $8,000
Resolve - Class - 2
Temporary construction equipment on site-expired fence permit noted: at time of inspection at front of vacant/stalled side observed posted site fence permit #310064827-expired on: 12/28/11. remedy: renew fence
Feb 11, 2012 · Penalty $4,000
Resolve - Class - 2
Work without a permit - expired permit noted: at time of inspection construction fence erected under #310152599 exp on 8/22/09 no record of renewing permit according to dob records - renew permit & post
Jan 5, 2010 · Penalty $4,000
Resolve - Class - 1
Failure to remove sidewalk shed promptly after work has been completednoted: sidewalk shed #310154383 iss. 6/16/08 is still in place after demolition has been completed. demo permit #302405868 was signed off on
Feb 18, 2009
Resolve - Non-hazardous
Altered building occupied without a valid certificate of occupancy job#301052027 3rd fl.2 apt occupied.2nd fl 1 aqpt occupied.1 vacant at 3rd fl.1 vacant 2nd fl store vacant.remedy:obtain valid c of o
May 10, 2001 · Penalty $180
Resolve - Non-hazardous
36 bq9(27-127) work without permit code section
Jun 2, 2000 · Penalty $2,500
Resolve - Hazardous
Failure to maintain note:between 2nd & 3rd floors a wooden flight of stairs is in disrepair creating a dangerous conditions with the bainisters detached from treds & is loose.remedy:make safe immediately fix &
Mar 30, 2000 · Penalty $800
Resolve - Non-hazardous
Work without a permit.party wall between #99 3rd ave and 101 3rd ave, have been cut to create one tax lot thru masonery wall.(hole is aproxi10' x 20')remedy:obtain all necessary permits.submit a letter of struc
Feb 16, 1993 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Feb 2, 2026 · Apt 604
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt 604
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 8, 2024 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 29, 2024 · Apt 211
Close - Unsanitary condition
Mold
Jul 25, 2023 · Apt 711
Close - Water leak
Slow leak
Jul 25, 2023 · Apt 711
Close - Water leak
Slow leak
Jul 25, 2023 · Apt 711
Close - Heat/hot water
Entire building
Mar 5, 2023 · Apt 401
Close
Show 24 more ↓
- Heat/hot water
Entire building
Mar 4, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2023 · Apt 401
Close - Heat/hot water
Entire building
Feb 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2023 · Apt 308
Close - Heat/hot water
Entire building
Feb 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2023 · Apt 508
Close - Heat/hot water
Entire building
Feb 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 8, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2023 · Apt BLDG
Close - Plumbing
Water supply
Feb 7, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2023 · Apt BLDG
Close - Safety
Window guard broken/missing
Feb 7, 2020 · Apt 3L
Close - Safety
Smoke detector
Feb 7, 2020 · Apt 3L
Close - Safety
Carbon monoxide detector
Feb 7, 2020 · Apt 3L
Close - Heat/hot water
Entire building
Nov 21, 2018 · Apt 609
Close - Heat/hot water
Entire building
Nov 2, 2018 · Apt 804
Close - Heat/hot water
Entire building
Sep 10, 2018 · Apt 206
Close - Heat/hot water
Entire building
Aug 11, 2018 · Apt 214
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2014
- Floors
- 8
- Residential units
- 84
- Building area
- 69,998 ft²
- Lot area
- 15,000 ft²
- Zoning
- R7A
- Community board
- 302
- Council district
- 39
- Block / lot
- 389 / 5
- Assessed value
- $8,492,400
- Landmark / historic district
- No
HPD registration #385153, last renewed Sep 29, 2025.
Questions about 101 3 Avenue
Who owns 101 3 Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 316 Bergen Owner, LLC.
Does 101 3 Avenue have violations?
Yes. NYC HPD has recorded 14 housing violations at this property.
Is 101 3 Avenue rent stabilized?
NYC Department of Finance tax bills listed 84 rent-stabilized units here in 2024 (about 100% of its 84 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 101 3 Avenue built?
City records list 2014 as the year it was built.
How many apartments are in 101 3 Avenue?
It has 84 residential units and 85 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.