269 Union Street
Brooklyn, NY 11231BBL 3-00339-0051Map
Owner of record: 269 Union LLC
269 Union Street is a walk-up apartment building built in 1920 in Brooklyn, 11231. It has 8 residential units across 4 floors. The owner of record is 269 Union LLC. HPD has recorded 12 housing violations here, most recently on May 13, 2026. 2 of the 12 most recent violations are still open. City tax records listed 1 rent-stabilized apartment here in 2024.
- HPD violations
- 12
- DOB violations
- 8
- ECB violations
- 3
- HPD complaints
- 173
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 12
- BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at building entrance , 1st story
May 13, 2026
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jun 25, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective broken marble saddle threshold at vestibule door at public hall, 1st story
Aug 11, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 12, 2024
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 2, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 13, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 30, 2017
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the entire apartment located at apt 4l, 4th story, 1st apartment from west at north
Oct 8, 2014 · Apt 4L
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt 4l, 4th story, 1st apartment from west at north
Oct 8, 2014 · Apt 4L
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4l, 4th story, 1st apartment from west at north
Oct 8, 2014 · Apt 4L
Closed — Violation dismissed
Show 2 more ↓
- BHazardous
Provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules. in the entire apartment located at apt 4l, 4th story, 1st apartment from west at north
Oct 8, 2014 · Apt 4L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the 1st room from south located at apt 4l, 4th story, apartment at north
Aug 5, 2000 · Apt 4L
Open — Not complied with
DOB building violations · 8
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Construction other optional
Hazardous
Nov 6, 2000
Dob violation - active - Construction other optional
Work without permit. work noted: at cellar level a iron gate approx 8'x 7' high has been installed with a double cylinga lock impeding the access to entire cellar remedy: obtain permit if feasible or restore premises to prior legal condition
Nov 6, 2000
Vw-violation work without permit - active - Construction other optional
Work with out a permit work noted demo bathroom wall tiles bathroom wa ll bathtub and sink removed itchen cabinets and stove demo and removed new drop ceiling with new with new electrial work in bathroom wall ope n and installaion of new broker base in kitchen and new electrical thr oughout apt 3r
Oct 22, 1998
Vw-violation work without permit - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
ECB violations · 3
- Hazardous
Failure to maintain note at first bathroom apt (1l) approx 8' of hallway is pitched north ward causing hallway & 3 piece bathroom to sag approx 2" creating separation around wall base and floor as well as cr
Nov 6, 2000 · Penalty $800
Resolve - Non-hazardous
Work without a permit. work noted at cellar level a iron gate approx 8'x7' high has been installed with a double cylinder lock inpedeing the acess to entire cellar. remedy: obtain permit if feasible or restore
Nov 6, 2000 · Penalty $2,500
Resolve - Hazardous
Work without a permit. work noted. demolition of bathroom wall tiles, bath tub and sink removed. kitchen cabinets and stove demo and removednew drop ceiling with new electrical work in bathroom. wall open and
Oct 22, 1998 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Apr 28, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 23, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 23, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Aug 7, 2024 · Apt 1R
Close - Paint/plaster
Wall
Aug 7, 2024 · Apt 1R
Close - Flooring/stairs
Floor
Aug 7, 2024 · Apt 1R
Close - Door/window
Window frame
Aug 7, 2024 · Apt 1R
Close - Unsanitary condition
Pests
Aug 7, 2024 · Apt 1R
Close - Paint/plaster
Wall
Jan 4, 2016 · Apt 4L
Close - Plumbing
Basin/sink
Jan 4, 2016 · Apt 4L
Close
Show 40 more ↓
- Door/window
Window frame
Jan 4, 2016 · Apt 4L
Close - Unsanitary condition
Mold
Jan 4, 2016 · Apt 4L
Close - Paint/plaster
Ceiling
Jan 4, 2016 · Apt 4L
Close - Heat/hot water
Entire building
Oct 31, 2014 · Apt 2L
Close - Plumbing
Basin/sink
Oct 7, 2014 · Apt 4L
Close - Plumbing
Basin/sink
Oct 7, 2014 · Apt 4L
Close - Unsanitary condition
Mold
Oct 7, 2014 · Apt 4L
Close - Plumbing
Toilet
Oct 7, 2014 · Apt 4L
Close - Paint/plaster
Wall
Oct 7, 2014 · Apt 4L
Close - General
Cabinet
Oct 7, 2014 · Apt 4L
Close - Plumbing
Basin/sink
Oct 7, 2014 · Apt 4L
Close - Paint/plaster
Ceiling
Oct 7, 2014 · Apt 4L
Close - Flooring/stairs
Floor
Oct 7, 2014 · Apt 4L
Close - Paint/plaster
Ceiling
Oct 7, 2014 · Apt 4L
Close - Heating
Heat related
Jan 29, 2013 · Apt NA
Close - General
Mold
Dec 6, 2011 · Apt 4L
Close - Paint/plaster
Wall
Dec 6, 2011 · Apt 4L
Close - General
Cabinet
Dec 6, 2011 · Apt 4L
Close - General
Floor
Dec 6, 2011 · Apt 4L
Close - Paint/plaster
Ceiling
Dec 6, 2011 · Apt 4L
Close - Paint/plaster
Wall
Dec 6, 2011 · Apt 4L
Close - Paint/plaster
Ceiling
Dec 6, 2011 · Apt 4L
Close - General
Mold
Dec 6, 2011 · Apt 4L
Close - General
Cabinet
Dec 6, 2011 · Apt 4L
Close - Paint/plaster
Wall
Dec 6, 2011 · Apt 4L
Close - Paint/plaster
Ceiling
Dec 6, 2011 · Apt 4L
Close - General
Doors
Dec 6, 2011 · Apt 4L
Close - Paint/plaster
Ceiling
Dec 6, 2011 · Apt 4L
Close - General
Doors
Dec 6, 2011 · Apt 4L
Close - Paint/plaster
Wall
Dec 6, 2011 · Apt 4L
Close - General
Floor
Dec 6, 2011 · Apt 4L
Close - Paint/plaster
Ceiling
Dec 6, 2011 · Apt 4L
Close - Plumbing
Toilet
Dec 6, 2011 · Apt 4L
Close - Paint/plaster
Ceiling
Dec 6, 2011 · Apt 4L
Close - Plumbing
Basin/sink
Dec 6, 2011 · Apt 4L
Close - Plumbing
Radiator
Nov 14, 2011 · Apt 1L
Close - General
Floor
Nov 14, 2011 · Apt 1L
Close - General
Floor
Nov 14, 2011 · Apt 1L
Close - General
Floor
Nov 14, 2011 · Apt 1L
Close - General
Floor
Nov 14, 2011 · Apt 1L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 4
- Residential units
- 8
- Building area
- 9,090 ft²
- Lot area
- 3,250 ft²
- Zoning
- R6A
- Community board
- 306
- Council district
- 39
- Block / lot
- 339 / 51
- Assessed value
- $1,754,100
- Landmark / historic district
- No
HPD registration #311919, last renewed Aug 12, 2025.
Questions about 269 Union Street
Who owns 269 Union Street?
The owner of record in NYC Department of City Planning PLUTO data is 269 Union LLC.
Does 269 Union Street have violations?
Yes. NYC HPD has recorded 12 housing violations at this property.
Is 269 Union Street rent stabilized?
NYC Department of Finance tax bills listed 1 rent-stabilized units here in 2024 (about 13% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 269 Union Street built?
City records list 1920 as the year it was built.
How many apartments are in 269 Union Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.